Sustainability of Life Cycle Management for Nuclear Cementation-Based Technologies
Language: English
Published by Elsevier Science, 2021
Series: Book 45 of 48 - Woodhead Publishing Series in Energy
- Softcover
- New

Condition: New
£ 237.44
Quantity: Over 20 available
Add to basketItem description from seller
Presents the latest information on the behavior of different cementitious systems used in the nuclear industry in one comprehensive resource Includes scientific justifications of system behavior during the design, operation, maintenance an.
Seller Inventory # 408050863
- Title
- Sustainability of Life Cycle Management for Nuclear Cementation-Based Technologies
- Publisher
- Elsevier Science
- Publication year
- 2021
- Condition
- New
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 0128183284
- ISBN 13
- 9780128183281
- Series
- Book 45 of 48: Woodhead Publishing Series in Energy
Sustainability of Life Cycle Management for Nuclear Cementation-Based Technologies, edited by Dr. Rahman and Dr. Ojovan, presents the latest knowledge and research on the management of cementitious systems within nuclear power plants. The book covers aging, development and updates on regulatory frameworks on a global scale, the development of cementitious systems for the immobilization of problematic wastes, and the decommissioning and decontamination of complex cementitious systems. The book's editors and their team of experts combine their practical knowledge to provide the reader with a thorough understanding on the sustainability of lifecycle management of cementitious systems within the nuclear industry.
Sections provide a comparative tool that presents national regulations concerning cementitious systems within nuclear power plants, check international and national evaluation results of the sustainability of different systems, help in the development of performance test procedures, and provide a guide on aging nuclear power plants and the long-term behavior of these systems in active and passive safety environments.
- Presents the latest information on the behavior of different cementitious systems used in the nuclear industry in one comprehensive resource
- Includes scientific justifications of system behavior during the design, operation, maintenance and decommissioning phases
- Aids the reader in the development of evaluation tests for problematic wastes
"Synopsis" may belong to another edition of this title.
About the Author
Michael I. Ojovan has been Nuclear Engineer of International Atomic Energy Agency (IAEA), visiting Professor of Imperial College London, Associate Reader in Materials Science and Waste Immobilisation of the University of Sheffield, UK, and Leading Scientist of Radiochemistry Department of Lomonosov Moscow State University. M. Ojovan is Editorial Board Member of scientific journals: “Materials Degradation (Nature Partner Journal), “International Journal of Corrosion, “Science and Technology of Nuclear Installations, “Journal of Nuclear Materials, and Associate Editor of journal “Innovations in Corrosion and Materials Science. He has published 12 monographs including the “Handbook of Advanced Radioactive Waste Conditioning Technologies by Woodhead and three editions of “An Introduction to Nuclear Waste Immobilisation by Elsevier – 2005, 2013 and 2019. He has founded and led the IAEA International Predisposal Network (IPN) and the IAEA International Project on Irradiated Graphite Processing (GRAPA). M. Ojovan is known for the connectivity-percolation theory of glass transition, Sheffield model (two-exponential equation) of viscosity of glasses and melts, condensed Rydberg matter, metallic and glass-composite materials for nuclear waste immobilisation, and self-sinking capsules to investigate Earth’ deep interior.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 41.55 | £ 41.55 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Online Handel nur mit Neubüchern
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
About Us
Legal website operator identification:
Moluna GmbH
Represented by the general manager Helge Blischke
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
Telefax: 02571/5698930
E-Mail: abe@moluna.de
VAT No.: DE296281834
listed in the commercial register of the local court Steinfurt
Commercial register number - Part B of the commercial register - 10553
We are a member of the initiative „FairCommerce“ since 24.07.2015.
For more information, see: www.haendlerbund.de/faircommerce.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.