Structural Integrity Assessment | Proceedings of ICONS 2018
Raghu V. Prakash (u. a.)
Sold by preigu, Osnabrück, Germany
AbeBooks Seller since 5 August 2024
New - Soft cover
Condition: New
Quantity: 5 available
Add to basketSold by preigu, Osnabrück, Germany
AbeBooks Seller since 5 August 2024
Condition: New
Quantity: 5 available
Add to basketStructural Integrity Assessment | Proceedings of ICONS 2018 | Raghu V. Prakash (u. a.) | Taschenbuch | xix | Englisch | 2020 | Springer Singapore | EAN 9789811387692 | Verantwortliche Person für die EU: Springer Verlag GmbH, Tiergartenstr. 17, 69121 Heidelberg, juergen[dot]hartmann[at]springer[dot]com | Anbieter: preigu.
Seller Inventory # 118907868
This volume contains selected papers from the Second Quadrennial International Conference on Structural Integrity (ICONS-2018). The papers cover important topics related to structural integrity of critical installations, such as power plants, aircrafts, spacecrafts, defense and civilian components. The focus is on assuring safety of operations with high levels of reliability and structural integrity. This volume will be of interest to plant operators working with safety critical equipment, engineering solution providers, software professionals working on engineering analysis, as well as academics working in the area.
Raghu Prakash is a Professor in the Department of Mechanical Engineering, Indian Institute of Technology Madras (IIT Madras) where he specializes in new product design and the assessment of structural integrity and remaining life prediction of critical components used in transportation and energy sectors. He has developed test systems for use in academia, R&D and industry during his tenure as Technical Director at BiSS Research, Bangalore and teaches courses relating to product design and structural integrity assessment at IIT Madras. He serves in the editorial boards of multiple journals including the Journal of Structural Longevity, Frattura ed Integrità Strutturale (IGF Journal), Journal of Life Cycle Reliability and Safety Engineering, and is a member of several technical societies. He has won several prestigious awards and recognition for his work, including the Binani Gold Medal (Indian Institute of Metals).
Suresh Kumar R. is currently affiliated with the Indira Gandhi Centre For Atomic Research (IGCAR). His research focuses on the theoretical and experimental aspects of structural integrity assessment and life extension of power plants. He has received his Bachelor’s in Mechanical Engineering from Kerala University and Master’s from the Department of Applied Mechanics, Indian Institute of Technology Madras, Chennai. He is a life time member of several technical societies, and is a recipient of numerous awards including the DAE Scientific and Technical Excellence Award (2013).
A. Nagesha currently heads the Fatigue Studies Section in the Metallurgy and Materials Group at IGCAR and is an Associate Professor in the Homi Bhabha National Institute. Dr Nagesha published more than 80 papers in journals and conference proceedings. He received the DAE Science and Technology Excellence award for his contributions to understanding the thermomechanical fatigue and creep-fatigue interaction behavior of reactor structural materials, as well as for his contribution towards the development of India-specific reduced activation ferritic-martensitic (IN-RAFM) steel and nitrogen-enhanced 316LN SS for reactor applications.
G. Sasikala is currently the Head of the Materials Development and Technology Division at IGCAR and a Professor in the Homi Bhabha National Institute, Mumbai. Prof Sasikala's research interests lie in understanding deformation, damage and fracture under creep and fatigue, fracture mechanics, fatigue crack growth, creep crack growth. She has published more than 230 research articles in reputed journals and proceedings, 7 chapters to edited books, and edited two books. She is a life member of several professional societies, and has served as an editor of Transactions of the Indian Institute of Metals and has been recognized for her outstanding contributions as a reviewer to several international journals.
Arun Kumar Bhaduri is the Director of IGCAR and a senior Professor at Homi Bhabha National Institute. He pilots the design and technology development of sodium-cooled fast reactors and its associated fuel cycle for the second stage of India’s nuclear power programme, and anchors the development of materials and their fabrication technologies for Indian programmes on sodium-cooled fast reactors, fusion reactors and advanced ultra-supercritical thermal power. He specializes in the field of materials joining, and has published more than 650 research articles in reputed journals and conferences and holds 2 international patents. He has received numerous awards and recognitions, including the Jaeger Lecture Award (International Institute of Welding), the GD Birla Gold Medal(Indian Institute of Metals); Carl von Bach Commemorative Medal (MPA University of Stuttgart, Germany) and the Metallurgist of the Year Award (Ministry of Steel, Government of India).
"About this title" may belong to another edition of this title.
Standard Business Terms and customer information / data protection declaration / battery disposal
I. Standard business terms
§ 1 Basic provisions
(1) The following terms and conditions of business apply for all contracts concluded with us as the supplier (preigu GmbH & Co. KG) via the websites AbeBooks and/or ZVAB. Unless otherwise agreed, the inclusion of your own terms and conditions is explicitly rejected.
(2) A ?consumer' in the sense of the following regulations is every natural person who ...
Instructions for revocation
Revocation right for consumers
(A ‘consumer' is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within 14 days without specifying any reasons.
The revocation period is 14 days with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
To exercise your right of withdrawal, you must inform us (preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, Telephone number: +49 (0) 541 / 580 72 84, E-Mail address: mail@preigu.de) by means of a clear declaration (e.g. a letter sent by post, or an e-mail) of your decision to withdraw from this contract. You can use the attached model withdrawal form for this purpose, which is, however, not mandatory.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts. The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, Email address: mail@preigu.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
| Order quantity | 60 to 60 business days | 60 to 60 business days |
|---|---|---|
| First item | £ 61.81 | £ 61.81 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.