Statistical Analysis and Optimization for Vlsi: Timing and Power
Ashish Srivastava|Dennis Sylvester|David Blaauw
New - Hardcover
Quantity: Over 20 available
Add to basketQuantity: Over 20 available
Add to basketAbout this Item
First book focused on statistical computer-aided design, which is a very active area of work today in both industry and academia Provides rigorous mathematical treatment of this subject with over 500 detailed equations, and over 120 figures and tables. Seller Inventory # 458428557
Bibliographic Details
Title: Statistical Analysis and Optimization for ...
Publisher: Springer US
Publication Date: 2005
Binding: Gebunden
Condition: New
About this title
Statistical Analysis and Optimization For VLSI: Timing and Power is a state-of-the-art book on the newly emerging field of statistical computer-aided design (CAD) tools. The very latest research in statistical timing and power analysis techniques is included, along with efforts to incorporate parametric yield as the key objective function during the design process. Included is the necessary mathematical background on techniques which find widespread use in current analysis and optimization. The emphasis is on algorithms, modeling approaches for process variability, and statistical techniques that are the cornerstone of the probabilistic CAD movement. The authors also describe recent optimization approaches to timing yield and contrast them to deterministic optimization. The work will enable new researchers in this area to come up to speed quickly, as well as provide a handy reference for those already working in CAD tool development.
Ashish Srivastava received the B.Tech. degree in electrical engineering from the Indian Institute of Technology, Kanpur in 2001 and the M.S. degree in electrical engineering from the University of Michigan, Ann Arbor in 2003. He is currently pursuing the Ph.D. degree at the University of Michigan, Ann Arbor. In summe r 2003 he was with the Technology CAD Division, Intel Corporation, Hillsboro, where he was a Graduate Intern and in summer 2004 he was with the Austin Research Lab, IBM, where he worked on leakage power optimization techniques . He is a recipient of the Intel PhD Fellowship, 2004. His research interests include optimization and statistical techniques for low-power VLSI design.
Dennis Sylvester received the B.S. degree in electrical engineering summa cum laude from the University of Michigan, Ann Arbor, in 1995. He received the M.S. and Ph.D. degrees in electrical engineering from University of California, Berkeley, in 1997 and 1999, respectively. He worked at Hewlett-Packard Laboratories in Palo Alto, CA, from 1996 to 1998. His dissertation research was recognized with the 2000 David J. Sakrison Memorial Prize as the most outstanding research in the UC-Berkeley EECS department. After working as a Senior R&D Engineer in the Advanced Technology Group of Synopsys, Mountain View, CA, he is now an Assistant Professor of Electrical Engineering at the University of Michigan, Ann Arbor. He has published numerous articles in his field of research, which includes the modeling, characterization, and analysis of on-chip interconnect, low-power circuit design and design automation techniques, and variability-aware circuit approaches. Dr. Sylvester received an NSF CAREER award, the 2000 Beatrice Winner Award at ISSCC, two outstanding research presentation awards from the Semiconductor Research Corporation, and a best student paper award at the 1997 International Semiconductor Device Research Symposium. He is the recipient of the 2003 ACM SIGDA Outstanding New Faculty Award and the 1938E Award for teaching and mentoring, which is the highest award given to a junior faculty in the Michigan College of Engineering. He has served on the technical program committee of numerous design automation and circuit design conferences and was general chair for the 2003 ACM/IEEE System-Level Interconnect Prediction (SLIP) Workshop. In addition, he helps to define the circuit and physical design roadmap as a member of the International Technology Roadmap for Semiconductors (ITRS) U.S. Design Technology Working Group. He is a member of IEEE, ACM, American Society of Engineering Education, and Eta Kappa Nu.
David Blaauw received his B.S. in Physics and Computer Science from Duke University in 1986, his M.S. in Computer Science from the University of Illinois, Urbana, in 1988 and his Ph.D. in Computer Science from the University of Illinois, Urbana, in 1991. He worked at the Engineering Accelerator Technology Division, IBM Corporation, Endicott, as a Development Staff Member, until August 1993. From 1993 till August 2001, he worked for Motorola, Inc. in Austin, TX, where he was the manager of t he High Performance Design Technology group. Since August 2001, he has been on the faculty at the University of Michigan as an Associate Professor. His work has focused on VLSI design and CAD with particular emphasis on circuit analysis and optimization problems for high performance and low power designs. He was the Technical Program Chair and General Chair for the International Symposium on Low Power Electronic and Design in 1999 and 2000, respectively, and was the Technical Program Co-Chair and member of the Executive Committee the ACM/IEEE Design Automation Conference in 2000 and 2001.
"About this title" may belong to another edition of this title.
Store Description
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Alternative Streitbeilegung:
Die Europäische Kommission stellt eine Plattform für die außergerichtliche Online-Streitbeilegung (OS-Plattform) bereit, aufrufbar unter https://ec.europa.eu/odr.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
Payment Methods
accepted by seller