Statics and Strength of Materials for Architecture and Building Construction (2nd Edition)
Language: English
Published by Prentice Hall, 2001
- Hardcover
- Used

Seller: St Vincent de Paul of Lane County, Eugene, OR, U.S.A.St Vincent de Paul of Lane County
AbeBooks seller since March 11, 2014
Condition: Used - Good
£ 4.62
Quantity: 1 available
Add to basketItem description from seller
Hardcover 100% of proceeds go to charity! Good condition with all pages in tact. Item shows signs of use and may have cosmetic defects.
Seller Inventory # 2JJ-001-0709
- Title
- Statics and Strength of Materials for Architecture and Building Construction (2nd Edition)
- Author
- Onouye, Barry S., Kane, Kevin
- Publisher
- Prentice Hall
- Publication year
- 2001
- Condition
- Good
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 0130549703
- ISBN 13
- 9780130549709
- Edition
- 2nd Edition
For sophomore/junior-level courses in Statics, Strength of Materials, and Structural Principles in Architecture.
A valuable reference source, this richly illustrated, user-friendly text provides an informative introduction to structures, and appeals to architectural and building construction students' strong need for visual reinforcement. No calculus is required.
"Synopsis" may belong to another edition of this title.
From the Back Cover
The first edition of Statics and Strength of Materials for Architecture and Building Construction was widely considered one of the finest books in the field. The illustration program, custom crafted by Kevin Kane, tells a clear graphical story about the principles of structural analysis in the design and construction of buildings.
Intended for students and professionals in architecture, construction, and civil engineering technology, this text is intended as the next step after a basic introduction to structures. A highly visual, non-calculus approach is employed. Organized into two parts, the first part of the book covers statics while the second part covers the strength of materials.
-
Features of this new edition include:
- Reviews of software programs currently available for structural analysis.
- A new chapter on steel connections.
- New illustrations added to aid reader understanding.
- Updated reference tables and specifications.
"About the title" may belong to another edition of this title.
St Vincent de Paul of Lane County
Eugene, OR, U.S.A.
AbeBooks seller since March 11, 2014
Shipping rates within U.S.A.
| Item | 4 to 14 business days | 1 to 5 business days |
|---|---|---|
| First item | £ 2.98 | £ 7.47 |
Payment methods
Store description
St Vinnie's Charitable Books is the online book storefront for St Vincent de Paul Society of Lane County Oregon. We are a charitable organization that serves over 84,000 people annually through homeless shelters, affordable housing and emergency services. We are passionate about books and sell over 1 million books annually throughout though our retail operations.
Specialty
Textbooks, Antiques and Collectibles, Mathematics, Business & Economics, History, Fiction, Religion, First Edition Books, Biographies & Autobiographies, ReferenceSeller's business information
St Vincent de Paul of Lane County
2890 Chad Drive
Eugene, OR U.S.A. 97408
Terms of sale
We guarantee the condition of every book as it's described
on the Abebooks web sites. If you're dissatisfied with your
purchase (Incorrect Book/Not as Described/Damaged) or if the
order hasn't arrived, you're eligible for a refund within 30
days of the estimated delivery date. If you've changed your
mind about a book that you've ordered, please use the Ask
bookseller a question link to contact us and we'll respond
within 2 business days.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to St Vincent de Paul of Lane County, Eugene, Oregon, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually ship within 1 business day. Shipping costs are based on books weighing 2.2 LB, or 1 KG. If your book order is heavy or oversized, we may contact you to let you know extra shipping is required.