Spacelab Payloads | Prepping Experiments and Hardware for Flight
Language: English
Published by Springer, 2022
- Softcover
- New

Seller: preigu, Osnabrück, Germanypreigu
AbeBooks seller since August 5, 2024
Condition: New
£ 26.15
Quantity: 5 available
Add to basketItem description from seller
Seller Inventory # 120429875
- Title
- Spacelab Payloads | Prepping Experiments and Hardware for Flight
- Author
- Michael E. Haddad (u. a.)
- Publisher
- Springer
- Publication year
- 2022
- Condition
- Neu
- Binding
- Taschenbuch
- Language
- English
- ISBN 10
- 3030867749
- ISBN 13
- 9783030867744
- Item weight
- 1,025 grams
- Dimensions
- 240 x 168 x 22 mm
- Series
- Book 376 of 408: Springer Praxis Books
- Seller catalogs
- Bücher
Spacelab was a reusable laboratory facility that was flown on the Space Shuttle from 1983 to 1998. Completing 22 major missions and contributing to many other NASA goals, Spacelab stands as one of the Shuttle program’s most resounding successes.
The system comprised multiple components, including a pressurized laboratory module, unpressurized carrier pallets and other related hardware, all housed in the Shuttle’s Payload Bay and crew compartment. But how did all those varied components actually come together?
The answer is the little-known “Level-IV”, a team of managers and engineers who molded separate elements of hardware into cohesive and safe payloads. Without the dedication and drive of the Level-IV team, the huge successes of the Spacelab missions would not have been achieved. This is their story.
You will learn herein how Level-IV was formed, who was involved, and the accomplishments, setbacks and problems faced along the way, in a story that blends both the professional and personal sides of Level-IV operations and its legacy. Upon reading this book, you will gain a new appreciation for this crucial team and understand what is meant when you hear the term “Level-IV”.
"Synopsis" may belong to another edition of this title.
About the Author
Michael E. Haddad retired 2011 from NASA at Kennedy Space Center with 32 years of Flight and Ground systems engineering and operational experience. His responsibilities included hands-on processing for different classifications of flight hardware for: domestic and international payloads; Spacelab payloads, shuttle planetary, observatory and satellite class payloads such as Galileo, Ulysses, and Gamma Ray Observatory; TDRS communication satellites and Hubble Space Telescope. He was the KSC Point-of-Contact for Extravehicular Activities (EVA) & Crew Systems for International Space Station (ISS) and Constellation Program, as well as the integration engineer for the ISS Multi-Element Integrated Testing (MEIT). Haddad created On-Orbit Constraints Tests that verified interfaces between flight systems launched on different missions then assembled in space.
David J. Shayler has been following the shuttle operational story for over 30 years and in particular aspects of its relationship with space stations. He has presented numerous papers on the topic and has authored series of articles published by the BIS in support of this outreach program and research. This work includes:
- 1991: The proposed USSR Salyut and US Shuttle Docking Mission circa 1981 (paper presented at the BIS Soviet Technical Forum 1991; paper published in JBIS 1991)
- 2000: American flights to Mir (Space shuttle) (published in BIS publication History of Mir; paper presented at BIS Soviet Technical Forum)
- 2002: NASA Shuttle missions to ISS (1998-2002) (published in BIS publication From Imagination to Reality: the ISS Volume 1)
- 2005: NASA Shuttle missions to ISS (2002-2005) (published in the BIS publication From Imagination to Reality: the ISS Volume 2)
- Unpublished: NASA Shuttle missions to ISS (2005-2011)
Shayler joined the BIS in January 1976 and has participated in numerous activities, programs and projects including chairing meetings, working on committees and contributing to society publications. Dozens of his articles have appeared in BIS publications since 1977. He created Astro Info Service in October 1982 to focus his space writing and research, with lectures and educational outreach activities. Early publications included the periodicals ORBITER (on the Shuttle) and ZENIT (on Soviet activities), and a growing range of biographies on the world's space explorers. In 1990 he co-created the Midland Spaceflight Society and acts as its chairman. His first books were published in 1987 by Ian Allen and Salamander Books and since then over 20 titles have been authored including 13 titles in the Praxis Space Library between 2000 and 2009. He has also contributed to U. S. books and collections on human spaceflight including the three editions of Macmillan’s Who’s Who in Space edited by Michael Cassutt. In 2008 his authorised biography on Skylab astronaut Jerry Carr was published after 20years’ research. Personal research has been conducted at NASA JSC in Houston and at KSC in Florida, as well as at Rice and Clear Lake Universities and NARA archives in Texas. His research has also allowed him to complete a fascinating and informative visit to Russia in 2003 visiting the Cosmonaut Training Center and other facilities around Moscow.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 60 to 60 business days | 60 to 60 business days |
|---|---|---|
| First item | £ 60.14 | £ 60.14 |
Payment methods
- Paypal
Store description
Specialty
Bücher, SpielwarenSeller's business information
preigu GmbH & Co. KG
Lengericher Landstraße 19
Osnabrück, Germany 49078
Terms of sale
About Us
Legal website operator identification:
preigu GmbH & Co. KG
Lengericher Landstr. 19
49078 Osnabrück
Germany
Telephone: +49 (0) 541 / 580 72 84
Email: mail@preigu.de
VAT No: DE 455 380 498
AG Osnabrück - HRA 209647
PhG: preigu Verwaltung GmbH
AG Osnabrück - HRB 221793
CEO: Ansas Meyer
We are neither willing nor obliged to participate in dispute resolution proceedings before consumer arbitration boards.
We are a member of the initiative "FairCommerce" since 30.11.2016.
For more information, see: https://www.haendlerbund.de/de/haendlerbund/interessenvertretung/faircommerce
Right of withdrawal
Instructions for revocation
Right of withdrawal for the sale of goods
Revocation right for consumers
(A ‘consumer' is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within 14 days without specifying any reasons.
The revocation period is 14 days with effect from the day,
-
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
-
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
-
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
To exercise your right of withdrawal, you must inform us (preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, Telephone number: +49 (0) 541 / 580 72 84, E-Mail address: mail@preigu.de) by means of a clear declaration (e.g. a letter sent by post, or an e-mail) of your decision to withdraw from this contract. You can use the attached model withdrawal form for this purpose, which is, however, not mandatory.
You can also exercise your right of withdrawal online by clicking on a button labelled accordingly (such as ‘Withdraw from contract' or similar) on the AbeBooks/ZVAB website. If you use this online function, you will immediately receive a confirmation of receipt on a durable medium (e.g. via email) containing information on the content of the withdrawal notice, as well as the date and time of its receipt.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
-
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
-
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
-
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
-
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts. The revocation right expires prematurely in case of contracts
-
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
-
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
-
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
-
To preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, Email address: mail@preigu.de :
-
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service () -
Ordered on ()/ received on ()
-
Name of the consumer(s)
-
Address of the consumer(s)
-
Signature of the consumer(s) (only in case of a notification on paper)
-
Date
(*) Cross out the incorrect option.