Soil Dynamics and Earthquake Geotechnical Engineering
Language: English
Published by Springer Singapore, 2018
- Hardcover
- New

Seller: moluna, Greven, Germanymoluna
AbeBooks seller since July 9, 2020
Condition: New
£ 120.26
Quantity: Over 20 available
Add to basketItem description from seller
Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Covers key developments in Soil Dynamics and Earthquake Geotechnical EngineeringFocuses on analytical and numerical modeling in geomechanics and the mitigation and management of geohazardsIncludes several chapters on interdisciplinary theme.
Seller Inventory # 220289950
- Title
- Soil Dynamics and Earthquake Geotechnical Engineering
- Author
- Adimoolam, Boominathan|Banerjee, Subhadeep
- Publisher
- Springer Singapore
- Publication year
- 2018
- Condition
- New
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 9811305617
- ISBN 13
- 9789811305610
- Series
- Book 13 of 362: Lecture Notes in Civil Engineering
This book gathers selected proceedings of the annual conference of the Indian Geotechnical Society, and covers various aspects of soil dynamics and earthquake geotechnical engineering. The book includes a wide range of studies on seismic response of dams, foundation-soil systems, natural and man-made slopes, reinforced-earth walls, base isolation systems and so on, especially focusing on the soil dynamics and case studies from the Indian subcontinent. The book also includes chapters addressing related issues such as landslide risk assessments, liquefaction mitigation, dynamic analysis of mechanized tunneling, and advanced seismic soil-structure-interaction analysis. Given its breadth of coverage, the book offers a useful guide for researchers and practicing civil engineers alike.
"Synopsis" may belong to another edition of this title.
About the Author
Professor A. Boominathan received his Ph.D. in Soil Dynamics from Moscow Civil Engineering Institute in 1986. He worked as a CSIR Scientific Pool Officer at the Ocean Engineering Centre, Indian Institute of Technology (IIT) Madras in 1987. Since 1988, he has been a faculty member of the Geotechnical Engineering Division at the Indian Institute of Technology Madras. His fields of specialization include Soil Dynamics and Earthquake Engineering, Foundation Engineering, and Ground Improvement. Dr. Boominathan has long since been actively involved in the area of site-specific seismic hazard assessment, which includes seismological, geophysical and geotechnical considerations. He has completed nine sponsored research projects worth roughly Rs. 1.5 crores and is currently coordinating major research projects funded by the Ministry of Earth Sciences of Government of India and the Nuclear Power Corporation of India (NPCIL), Mumbai in the area of Seismic Soil-Structure Interaction andBase Isolation using Geo-Isolators. He has authored and co-authored over 130 scientific papers, and serves as an editorial board member of Journal of Earthquake & Tsunami, International Journal of Earthquake Geotechnical Engineering and ISET Journal of Earthquake Technology. He was part of a working group of experts in the Geohazards program of the National Disaster Management Authority (NDMA), Government of India. He received the IGS-Shri M.S. Jain Biennial Prize in 2004 and IGS-Prof. C.S. Desai Biannual Prize in 2012.
Dr. Subhadeep Banerjee is an Associate Professor of Geotechnical Engineering at the Department of Civil Engineering, Indian Institute of Technology, Madras. He received his Ph.D. in Civil Engineering from the National University of Singapore. His research interests include cyclic behavior of geomaterials, seismic soil-structure interactions, and finite element analysis of complex dynamic problems. In addition, he is an expert for constitutive modeling of soils, with a special focus on transient dynamic behavior. At the IIT Madras, he has formed three research groups to study the following attributes: (i) Cyclic characterization of various types natural soils, improved ground, landfills etc., (ii) Development of constitutive models of soils, with an emphasis on their performance under seismic loadings, and (iii) Application of fundamentals of dynamics to various complex soil-structure problems such as tunneling, base isolation techniques, plate anchors, retaining walls etc.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.01 | £ 42.01 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Online Handel nur mit Neubüchern
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
About Us
Legal website operator identification:
Moluna GmbH
Represented by the general manager Helge Blischke
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
Telefax: 02571/5698930
E-Mail: abe@moluna.de
VAT No.: DE296281834
listed in the commercial register of the local court Steinfurt
Commercial register number - Part B of the commercial register - 10553
We are a member of the initiative „FairCommerce“ since 24.07.2015.
For more information, see: www.haendlerbund.de/faircommerce.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.