Software Evolution and Maintenance
Language: English
Published by John Wiley & Sons, 2014
- Hardcover
- New

Seller: Biblios, frankfurt am main, hessen, GermanyBiblios
AbeBooks seller since September 10, 2024
Condition: New
£ 211.40
Quantity: 4 available
Add to basketItem description from seller
PRINT ON DEMAND pp. 422.
Seller Inventory # 18142324065
- Title
- Software Evolution and Maintenance
- Author
- Naik Sagar Tripathy Piyu Tripathy Priyadarshi Naik Kshirasagar
- Publisher
- John Wiley & Sons
- Publication year
- 2014
- Condition
- New
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 0470603410
- ISBN 13
- 9780470603413
Software Evolution and Maintenance: A Practitioner’s Approach introduces readers to a set of well-rounded educational materials, covering the fundamental developments in software evolution and common maintenance practices in the industry. Each chapter gives a clear understanding of a particular topic in software evolution, and discusses the main ideas with detailed examples. The authors first explain the basic concepts and then drill deeper into the important aspects of software evolution. While designed as a text in an undergraduate course in software evolution and maintenance, the book is also a great resource forsoftware engineers, information technology professionals, and graduate students in software engineering.
- Based on the IEEE SWEBOK (Software Engineering Body of Knowledge)
- Explains two maintenance standards: IEEE/EIA 1219 and ISO/IEC14764
- Discusses several commercial reverse and domain engineering toolkits
- Slides for instructors are available online
Software Evolution and Maintenance: A Practitioner’s Approach equips readers with a solid understanding of the laws of software engineering, evolution and maintenance models, reengineering techniques, legacy information systems, impact analysis, refactoring, program comprehension, and reuse.
"Synopsis" may belong to another edition of this title.
About the Author
Priyadarshi (Piyu) Tripathy, PhD, is a Director at Knowledge Trust, Bhubaneswar, India. Dr. Tripathy has worked in the field of Software Testing and Maintenance for Cisco Systems, Airvana, Inc. and NEC Laboratories, America Inc. in U. S. A. He has co-authored (with Dr. Naik) a textbook entitled Software Testing and Quality Assurance: Theory and Practice.
Kshirasagar (Sagar) Naik, PhD, is a Professor in the Department of Electrical and Computer Engineering at the University of Waterloo. He has over twenty-four years of academic and industry experience in India, Japan, and Canada, including three years in Wipro Information Technology Limited, Bangalore."About the title" may belong to another edition of this title.
Biblios
frankfurt am main, hessen, Germany
AbeBooks seller since September 10, 2024
Shipping rates from Germany to U.S.A.
| Item | 25 to 45 business days | 8 to 14 business days |
|---|---|---|
| First item | £ 8.56 | £ 16.08 |
Payment methods
Store description
We carry a wide selection of books from South Asia, United States, UK.
Specialty
new books imported from india, uk, usaSeller's business information
Readingos GmbH
Kaiserstraße 47
Frankfurt am Main, Germany 60329
Terms of sale
We ship from Frankfurt
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Biblios, frankfurt am main, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.