Soft Computing Applications in Modern Power and Energy Systems
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: 1 available
Add to basketCondition: New
Quantity: 1 available
Add to basketThis book entitled “Soft Computing Applications in Modern Power and Energy Systems” aims to offer in-depth discussions, case studies, and the latest advancements in the realm of soft computing as it pertains to power systems incorporating power electronics-based equipment, energy systems, and energy communities. It also explores topics such as optimal planning, analysis, operation, and control in the context of modern power and energy systems, along with the applications of various soft computing techniques. Readers will find valuable opportunities to enrich their understanding and expertise in these specialized domains. Furthermore, this book has the potential to inspire readers to generate novel and innovative ideas in the field.
Shailendra Kumar is currently working as an Assistant Professor in the Department of Electrical Engineering Indian Institute of Technology (IIT) Bhilai. He received a B.Tech. Degree in electrical and electronics engineering from Uttar Pradesh Technical University, Lucknow, India, in 2010, and the M.Tech. Degree in power electronics, electrical machine, and drives (PEEMD) from the Indian Institute of Technology, Delhi, India, in 2015. He completed his Ph.D. degree in the Department of Electrical Engineering from the Indian Institute of Technology Delhi, New Delhi, India in May 2019. He has worked as a postdoctoral research fellow at Petroleum Institute of Research Centre Khalifa University from May 2019 to November 2019. He has also worked as an Assistant Professor at Maulana Azad National Institute of Technology, Bhopal from June 2020 to May 2023. His research interests include charging stations for EVs, power quality, grid integration of renewable energy resources, custom power devices, and microgrids. Dr. Kumar was the recipient of the prestigious POSOCO power system award (in Master as well as Doctoral categories) in 2016 and 2019. He is also a recipient of Prof. Som Nath Mahendra's Student Travel Awards for the IEEE PEDES 2018 conference and the IEEE UPCON Best Paper Award in 2016 and 2018. Dr. Kumar is a senior member of IEEE and a member of INAE Societies.
Narayana Prasad Padhy (Senior Member, IEEE) received a Ph.D. degree in power systems engineering from Anna University, Chennai, India, in 1997. He is an Institute Chair Professor with the Department of Electrical Engineering, Indian Institute of Technology Roorkee, Roorkee, India. He is heading many national and international projects, such as DSIDES, ID-EDGe, and HEAPD. He is also part of other international projects, namely Indo–US UI-ASSIST and Indo-UK ZED-I. His research interests include power system
analysis, optimization, demand-side management, and smart grids. Dr. Padhy is also a Fellow of the Indian National Academy of Engineers, Institution of Engineering and Technology, and Institution of Engineers India.
optimization and control of the power system. Dr. Kamalasadan was the recipient ofseveral awards, including the NSF CAREER Award and IEEE Best Paper Award.
Premalata Jena is currently an Associate Professor at the Department of Electrical
Engineering, Indian Institute of Technology Roorkee, Uttarakhand, India. She received her B.Tech. degree in electrical engineering from the Utkal University, Bhubaneswar, India, in 2001, the M.Tech. degree in Electrical Engineering from the Indian Institute of Technology Kharagpur, Kharagpur, India, in 2006, and the PhD degree from the Indian Institute of Technology Kharagpur, Kharagpur, India, in 2011. She has seven years of teaching experience. She is an IEEE member and INAE, Young Associate. She received many awards such as the Women Excellence Award and Early Carrier Research Award, SERB, DST, Gov. of India, New Delhi, INAE Young Engineer Award, POSOCO Power System Award, in 2013. She has published many papers in different reputed journals and conferences. Her fields of interest are Smart Grid, Smart grid technology, and protection, Microgrid, Microgrid Protection, Signal processing application to power system relaying, Power system Protection, Protection Issues with FACTS Devices, Protection Scheme Development for a line with FACTS devices, Disturbance localization, Signal processing application for disturbance localization.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ‘consumer’ is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
In order to exercise your revocation right, you must inform us (Moluna GmbH, Münsterstr. 105, 48268 Greven, Telephone number: 02571/5 69 89 33, Fax number: 02571/5 69 89 30, E-Mail address: abe@moluna.de) of your decision to revoke this contract by means of a clear declaration (e.g. a letter sent via post, fax or email). You can use the enclosed specimen revocation form for this, which however is not mandatory.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts.
The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To Moluna GmbH, Engberdingdamm 27, 48268 Greven, Fax number: 02571/5 69 89 30, Email address: abe@moluna.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 42.38 | £ 42.38 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.