Smart Traction Power Supply Systems for High-speed Railways
Language: English
Published by Elsevier Science, 2025
- Softcover
- New

Seller: moluna, Greven, Germanymoluna
AbeBooks seller since July 9, 2020
Condition: New
£ 269.00
Quantity: Over 20 available
Add to basketItem description from seller
Discusses what is meant by the term smart traction power supply systems and technology trendsReviews the new concept of the traction substationDescribes how to develop smart traction power supply systemsAutor/Auto.
Seller Inventory # 1973596318
- Title
- Smart Traction Power Supply Systems for High-speed Railways
- Author
- Shibin Gao|Zhengqing Han
- Publisher
- Elsevier Science
- Publication year
- 2025
- Condition
- New
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 0443333238
- ISBN 13
- 9780443333231
modern railways and urban transport systems require smart and energy-efficient traction
power supply products and solutions to ensure safe, reliable, and environmentally
sustainable operations. Based on the latest development and achievements of China’s
traction power supply system, Smart Traction Power Supply Systems for High-speed
Railways focuses on the latest research into smart traction power supply systems. Starting
from the concept of smart technologies, it describes the structure and functions of smart
traction power supply systems, including smart power supply and transformation facilities,
smart power supply operation and maintenance management systems, smart power supply
dispatching systems, and high-speed communication networks. This book covers both
theory and the implementation, methods, and case studies of wide area protection, selfhealing
reconstruction, fault prognosis, health assessment, and power supply dispatching.
- Discusses what is meant by the term smart traction power supply systems and technology trends
- Reviews the new concept of the traction substation
- Describes how to develop smart traction power supply systems
"Synopsis" may belong to another edition of this title.
About the Author
Professor Shibin Gao is based at the School of Electrical Engineering, Southwest Jiaotong University (SWJTU), and the director of the National Rail Transit Electrification and Automation Engineering Technology Research Center (NEEC); he has presided over more than 50 national/ministerial and provincial-level scientific research projects, including 2 national science and technology support programs, 1 national high-tech R&D program (863 Program), 6 programs supported by National Natural Science Foundation of China, and 25 science and technology development programs (key programs) supported by China Railway Corporation.
Professor Zhengqing Han is based at the School of Electrical Engineering, Southwest Jiaotong University (SWJTU). He has been engaged in research on traction power supply automation and smart traction power supply system for many years; he has presided over more than 20 key programs, including youth programs and general programs supported by National Natural Science Foundation of China, national advanced rail transit key programs, key scientific and technological development programs of China State Railway Group Co., Ltd. (China Railway Corporation, Ministry of Railways), and science and technology support programs of Sichuan Province.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 41.98 | £ 41.98 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Online Handel nur mit Neubüchern
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
About Us
Legal website operator identification:
Moluna GmbH
Represented by the general manager Helge Blischke
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
Telefax: 02571/5698930
E-Mail: abe@moluna.de
VAT No.: DE296281834
listed in the commercial register of the local court Steinfurt
Commercial register number - Part B of the commercial register - 10553
We are a member of the initiative „FairCommerce“ since 24.07.2015.
For more information, see: www.haendlerbund.de/faircommerce.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.