Smart Grid Stability and Control
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt.
Seller Inventory # 1841255814
This book features papers from the International Conference on Sustainable Power and Energy Research, ICSPER 2024. Covering the spectrum of power and energy, it focuses on various aspects of emerging technologies, research ideas, real-time experiences, and understanding of technology utilization in electrical power and energy systems. The book introduces new ideas in Power system stability, Operation, and Control; Renewable energy resources and energy storage; Power electronics drives and Electric vehicles; Smart grid and wide area monitoring; Data science applications and cyber security in power systems; Energy market and deregulation; Power System Protection; Condition monitoring and HV engineering; Soft computing Techniques in electrical engineering; Power electronic applications in power systems.
Dr Ram Krishan is an Assistant Professor in the Department of Electrical Engineering at NIT Warangal, Telangana, India. He received his M. Tech from NIT Hamirpur, HP in 2013 and Ph. D. from IIT Delhi in 2018. He has worked at Deloitte India LLP for 2 years (2017-2019), where he executed 7 ardent pilot projects under the Renewable Integration and Sustainable Energy (RISE) initiative project of USAID/India to support the Govt. of India’s efforts to manage large-scale integration of Renewable Energy sources (RES). He has worked closely with CERC, POSOCO, PGCIL, NTPC, and KPTCL. He has worked on the AGC and Dynamic Reactive Power control of Large Solar Parks and the BESS pilot project in India. He was also actively involved in different industry projects associated with transmission and distribution system analysis and electrical vehicle (EVs) to grid (V2G) analysis. He is an active member of IEEE and CIGRE Societies. Apart from industrial exposers, he has published more than 30 peer-reviewed papers in scholarly journals and conferences. His present research interests are power system analysis, stability, load flow, Battery Energy Storage Systems and Grid Integrated RES. He is an expert in Grid integration and coordinated control of inverter-based microgrid systems.
Dr. Deepak Reddy Pullaguram received his M. Tech degree in power system engineering from the National Institute of Technology, Warangal, in 2014, and a Ph.D. degree from the Indian Institute of Technology Delhi, New Delhi, India, in 2018. He worked as a Faculty Research Fellow and Assistant professor of Research with the Department of Electrical Engineering, The University of Texas Arlington, Texas, USA, in 2018 and 2019. During this period, Research on high-performance optimization and cyber-security of distributed control in microgrids was funded by the Office of Naval Research (ONR), USA. He worked as an Assistant Professor with the Department of Electrical Engineering, National Institute of Technology Warangal in India from December 2019- September 2022. He is an assistant professor at the Department of Electrical Engineering, Indian Institute of Technology Kharagpur. Dr. Deepak received the A P J Abdul Kalam Memorial International Travel Award for the IFAC World Congress meeting in 2017 and the POSOCO Power System Award (PPSA-2018) for the best thesis in 2018. He received the CSEE JPES Excellent Paper Award. He also received the Scientific High-Level Visiting Fellowships (SSHN)-2023 Award from the French Institute in India (IFI), French Government. Dr. Deepak's research interests include renewable power generation, Operation, dynamics, and control of AC/DC microgrids, and cyber-security. Deepak has published 16 Journals, including IEEE and IET journals, and 19 International/National Conferences. Dr. Deepak has authored two book chapters and has 2 patents to his credit. He has multiple ongoing projects sponsored by the DST-SERB-sponsored SRG project, National Supercomputing Mission (NSM)-DST.
Surender Reddy Salkuti has been working with Woosong University, Daejeon, Republic of Korea as an Associate Professor in the Department of Railroad and Electrical Engineering since April 2014. He received a Ph.D. degree in Electrical Engineering from the Indian Institute of Technology Delhi (IITD), New Delhi, India, in 2013. He was a Postdoctoral Researcher at Howard University, Washington, DC, USA, from 2013 to 2014. His research interests include power system restructuring issues, smart grid development with the integration of wind and solar photovoltaic energy sources, battery storage, and electric vehicles, demand response, power system analysis and optimization, artificial intelligence and soft computing techniques application in power systems, and renewable energy.
He has published three edited volumes with Springer (LNEE and GREEN) and over 300 research articles in peer-reviewed international journals and conference proceedings. He served as Guest Editor for various international journals. He is also an editorial board member for many journals. He received the 2016 Distinguished Researcher Award from Woosong University Educational Foundation, Republic of Korea, and the POSOCO Power System Award (PPSA) 2013, India. He is a Member of IEEE and IEEE Power and Energy Society.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ‘consumer’ is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
In order to exercise your revocation right, you must inform us (Moluna GmbH, Münsterstr. 105, 48268 Greven, Telephone number: 02571/5 69 89 33, Fax number: 02571/5 69 89 30, E-Mail address: abe@moluna.de) of your decision to revoke this contract by means of a clear declaration (e.g. a letter sent via post, fax or email). You can use the enclosed specimen revocation form for this, which however is not mandatory.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts.
The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To Moluna GmbH, Engberdingdamm 27, 48268 Greven, Fax number: 02571/5 69 89 30, Email address: abe@moluna.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.41 | £ 42.41 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.