Slurry Transport Using Centrifugal Pumps
Visintainer, Robert|Matousek, Václav|Pullum, Lionel|Sellgren, Anders
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. This book is based on the industry leading short course of the same name hosted by the GIW Industries Hydraulic Laboratory and founded by Dr. Roland Clift and Graeme Addie, who together with Dr. Ken Wilson continued its development and authored the first ed.
Seller Inventory # 779406747
Updates to the fourth edition include:
· Careful formulation of the theoretical concepts, providing greater clarity of slurry flow dynamics, including a new chapter on the principles and characterization of slurry flows.
· Expansion of the 4-Component Models for settling slurry pipeline flow and pump solids effect, based on an extensive series of full-sized tests.
· An expanded treatment of complex slurries, including a broader discussion of non-Newtonian fluids and their interaction with coarse particles.
· A new chapter on test methods, presenting an overview of slurry system instrumentation, moderntechniques for characterizing slurry rheology, and practical advice for planning and executing a slurry test.· An overview of advances in the computational modeling of slurries, including an in-depth parametric study of slurry pump wear and operating cost.
The authors highlight methods for achieving energy efficiency, which are crucial to the effective use of scarce resources, given the foundational role of slurry transport systems in the energy intensive industries of mining and dredging. Key concepts are supported with case studies and worked examples.
Slurry Transport Using Centrifugal Pumps, fourth edition, is both methodical and in-depth. It is ideal as a teaching tool for classroom or self-directed learning domains, and valuable as a design guide for engineer practitioners at all experience levels.Robert Visintainer, P.E. has worked in the design, testing, and manufacture of centrifugal slurry pumps since 1981. As Chief Engineer and presently VP of Engineering for GIW Industries, he has been responsible for the development of slurry pumps and wear resisting materials, and he has contributed to many innovations in pump design and wear prediction technology over the past 30 years. He is also responsible for pump testing, selection software, slurry testing, and technical training in GIW’s unique Hydraulic Test Lab. An honors graduate of the Georgia Institute of Technology, he holds degrees in mechanical engineering and physics; contributes to scientific conferences, journal papers, and short courses on a regular basis; and is the 2021 recipient of the ASME Worthington Medal for eminent achievement in the pumping industry. Visintainer joined the teaching staff of the annual GIW Slurry Course in 2006 and has hosted the course since 2010. His contributions to the 4th edition textbook, “Slurry Transport in Centrifugal Pumps,” have focused on slurry pump design, wear materials, and slurry system operation.
Prof. Václav Matoušek is full professor of water engineering and water management at Czech Technical University in Prague, with over 30 years of international research experience in slurry transport. He holds an MSc (1986) in civil engineering from the Czech Technical University and a Ph.D. (with honors, 1997) in dredging engineering from the Delft University of Technology in the Netherlands. His research focuses primarily on two-phase flows, with special attention to pipeline transport of slurries, slurry pumping, rheology of mixtures, sediment transport in open channels, and river morphology. He has published more than 130 papers in refereed journals and conference proceedings. Additionally, he teaches university courses on hydraulics and river engineering and industrial courses on two-phase flows. Matoušek joined the teaching staff of the annual GIW Slurry Course in 2007 and has co-authored the 4th edition textbook, with focus on the classification and modeling of settling slurry flows.
Dr. Lionel Pullum trained as an instrument and production engineer in London, England, where he obtained an honors degree in mechanical engineering and a Ph.D. in pneumatic conveying and laser diagnostics. In 1979, he joined the Division of Mineral Engineering at the Commonwealth Science Industry and Research Organization (CSIRO), Australia’s foremost research body, and became an international authority on the hydraulic conveying of coarse minerals in non-Newtonian slurries. Since 1988, as a private consulting engineer, he has participated in design projects across the mining industry and has continued his active collaboration with the R&D community through the CSIRO, Australian Mineral Research Association (AMIRA), and the National Energy Research, Development & Demonstration Council (NERDDC). He has produced over 270 publications,received various awards, and, in 2015, was made Honorary Fellow at the CSIRO. Pullum joined the teaching staff of the annual GIW Slurry Course in 2005 and has co-authored the 4th edition textbook, with focus on particle mechanics, non-Newtonian slurries, and instrumentation.
Prof. Emeritus Anders Sellgren was formerly head of the Division of Water Resources Engineering at Luleå University of Technology in Sweden. He holds a BS in mathematics from the University of Gothenburg and a MS in civil engineering from Chalmers University of Technology, Gothenburg, where he also holds a Ph.D. in hydraulics. In the early 1980s, he worked as a research associate at the Mining and Minerals Resources Research Institute at the University of Arizona, U.S.A. He has since accumulated over 40 years of international experience in the research, development, and design of various slurry pumping systems, has published numerous academic papers in the field, and has contributed to the first edition ofthe ANSI/HI Centrifugal Slurry Pump Standard. He joined the teaching staff of the annual GIW Slurry Course in 1989, contributed to the 1st edition of the textbook, and was a co-author in the 2nd and 3rd editions. He has been an important co-author of the 4th edition on many topics, but especially in the areas of centrifugal pump solids effects and pump-system interactions.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ‘consumer’ is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
In order to exercise your revocation right, you must inform us (Moluna GmbH, Münsterstr. 105, 48268 Greven, Telephone number: 02571/5 69 89 33, Fax number: 02571/5 69 89 30, E-Mail address: abe@moluna.de) of your decision to revoke this contract by means of a clear declaration (e.g. a letter sent via post, fax or email). You can use the enclosed specimen revocation form for this, which however is not mandatory.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts.
The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To Moluna GmbH, Engberdingdamm 27, 48268 Greven, Fax number: 02571/5 69 89 30, Email address: abe@moluna.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.70 | £ 42.70 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.