Simplified LRFD Bridge Design
Language: English
Published by CRC Press, 2013
- Hardcover
- Used

Seller: HPB-Emerald, Dallas, TX, U.S.A.HPB-Emerald
AbeBooks seller since September 15, 2017
Condition: Used - Very good
£ 38.20
Quantity: 1 available
Add to basketItem description from seller
Connecting readers with great books since 1972! Used books may not include companion materials, and may have some shelf wear or limited writing. We ship orders daily and Customer Service is our top priority.
Seller Inventory # S_484096081
- Title
- Simplified LRFD Bridge Design
- Publisher
- CRC Press
- Publication year
- 2013
- Condition
- Very Good
- Binding
- hardcover
- Language
- English
- ISBN 10
- 1466566515
- ISBN 13
- 9781466566514
Developed to comply with the fifth edition of the AASHTO LFRD Bridge Design Specifications [2010]––Simplified LRFD Bridge Design is "How To" use the Specifications book. Most engineering books utilize traditional deductive practices, beginning with in-depth theories and progressing to the application of theories. The inductive method in the book uses alternative approaches, literally teaching backwards. The book introduces topics by presenting specific design examples. Theories can be understood by students because they appear in the text only after specific design examples are presented, establishing the need to know theories.
The emphasis of the book is on step-by-step design procedures of highway bridges by the LRFD method, and "How to Use" the AASHTO Specifications to solve design problems.
Some of the design examples and practice problems covered include:
- Load combinations and load factors
- Strength limit states for superstructure design
- Design Live Load HL- 93
- Un-factored and Factored Design Loads
- Fatigue Limit State and fatigue life; Service Limit State
- Number of design lanes
- Multiple presence factor of live load
- Dynamic load allowance
- Distribution of Live Loads per Lane
- Wind Loads, Earthquake Loads
- Plastic moment capacity of composite steel-concrete beam
- LRFR Load Rating
Simplified LRFD Bridge Design is a study guide for engineers preparing for the PE examination as well as a classroom text for civil engineering students and a reference for practicing engineers. Eight design examples and three practice problems describe and introduce the use of articles, tables, and figures from the AASHTO LFRD Bridge Design Specifications. Whenever articles, tables, and figures in examples appear throughout the text, AASHTO LRFD specification numbers are also cited, so that users can cross-reference the material.
"Synopsis" may belong to another edition of this title.
About the Author
Jai B. Kim, PE, PhD, is a professor emeritus of civil and environmental engineering at Bucknell University. He was department chairman for 26 years. Also, currently he is a bridge consultant (since 1980) and president of BKLB Structural Consultants, Inc. Recently he was a structural engineer at the Federal Highway Administration (FHWA). He has been active in bridge research for over 40 years, and was a member of the Transportation Research Board Committee of Bridges and Structures. He also served on the Structural PE Exam Committee of the National Council of Examiners and Surveying (NCEES) for many years. He holds a BSCE and MSCE from Oregon State University and a PhD from University of Maryland.
Robert H. Kim, PE, MSCE, is chief design engineer for BKLB Structural Consultants, Inc. He has extensive experience in the design, research, and construction of highway bridges. He has authored and presented several papers related to bridge engineering. Robert’s three books, Bridge Design for the Civil and Structural Professional Exams, Second Edition; Timber Design, Seventh Edition; and Civil Discipline Specific Review for the FE/EIT Exam are well-read by both students and engineers. In 2013, he is working on a bridge rehabilitation design in Connecticut. He holds a BS from Carnegie Mellon University and a MSCE from Penn State University.
Jonathan R. Eberle, BSCE is engaged in research with focus on the seismic design and analysis of structures at Virginia Polytechnic Institute and State University as a graduate student. He holds a BSCE from Bucknell University.
Contributors:
Dave M. Mante, MSCE performed a rigorous full-scale laboratory testing on an innovative concrete bridge deck system and he is performing research on prestressed concrete girders at Auburn University.
Eric J. Weaver, PE, M.Eng, performed research on fatigue and life-cycle analysis of steel truss bridges at Lehigh University. He worked for NASA’s space shuttle program and currently he is working as a structural engineer for Westinghouse Electric Co.
"About the title" may belong to another edition of this title.
HPB-Emerald
Dallas, TX, U.S.A.
AbeBooks seller since September 15, 2017
Shipping rates within U.S.A.
| Item | 4 to 14 business days | 2 to 6 business days |
|---|---|---|
| First item | £ 2.84 | £ 5.29 |
Payment methods
Store description
Half Price Books has been connecting readers to great books since 1972. Customer service is our top priority.
Seller's business information
Half Price Books, Records, Magazines, Inc.
5803 East Northwest Highway
Dallas, TX U.S.A. 75231
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to HPB-Emerald, Carrollton, Texas, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.