Selected Proceedings of the 2nd International Engineering Research Symposium IERS 2024 14 Aug Colombo, Sri Lanka
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt.
Seller Inventory # 1966143203
This book presents selected peer reviewed articles from the 2nd International Engineering Research Symposium- IERS 2024, held at Colombo in Sri Lanka, under the theme of 'Engineering Innovations for Economic Transformation”. It highlights the latest advancements in engineering research, innovations, and technological principles aimed at driving economic changes and improvements within society and the industry. IERS2024 covers the areas of Agricultural Engineering, Chemical Engineering, Civil Engineering, Computer Science & Engineering, Electrical Engineering, Electronics & Telecommunication Engineering, Mechanical & Mechatronics Engineering, Materials Science & Engineering, Manufacturing & Process Engineering, and other Engineering discipline relevant to the theme of IERS 2024.
Dr. T. N. Fernando obtained her Bachelor of Technology Engineering (honors) degree in Agricultural Engineering specialization and PhD from the Department of Agricultural and Plantation Engineering, Faculty of Engineering Technology, at the Open University of Sri Lanka. Currently, she serves as a Senior Research Engineer in the Department of Mechanical Engineering at the National Engineering Research and Development Centre of Sri Lanka, located in the Industrial Estate, Ekala, Ja Ela, Sri Lanka. Her research interests are in the areas of Bio polymer processing, Applications of nuclear energy, Agricultural engineering and sustainable materials processing.
Dr. Manjula Siriwardhana is attached to the National Engineering Research and Development Centre of Sri Lanka as a Principal Research Engineer. As a researcher, Dr. Siriwardhana has received postgraduate research scholarships from several countries and conducted original research and published in highly cited journals. She earned her PhD from the Australian National University (ANU), Canberra, ACT, Australia, MESc. from Western University (UWO), London ON, Canada, MEng. In Energy Technology from Asian Institute of Technology (AIT), Thailand and BSc. Eng. (Hons) from the University of Peradeniya, Sri Lanka. She has collaborated on multi-country research projects financed by international organizations including the International Research Institute (IRI) for Climate and Society, START, UNEP, UNDP, GEF, GNESD and EEP Mekong Region. She is experienced in project execution, evaluation, coordinating and networking with project partners and stakeholders, organizing workshops, preparing and editing of project reports and policy briefs. Dr. Siriwardhana’s research interests include renewable energy, climate change, energy management, energy project evaluation, GHG quantification, climate resilient green growth and Carbon neutrality.
Prof. Ranjith Dissanayake is a Senior Professor in Civil Engineering at the University of Peradeniya Kandy, Sri Lanka. He is a Chartered Engineer and a Fellow of the Institution of Engineers, Sri Lanka (IESL) and holds membership from several other prestigious institutions. He was a Fulbright Scholar in the USA, Endeavour Fellow in Australia, and JASSO Research Fellow in Japan. He is the Chairman of the Green Building Council of Sri Lanka (GBCSL), the President of the Institution of Engineers, Sri Lanka (IESL) and a Vice President of the Chamber of Construction Industry (CCI). He is the founder of several companies, including Lego International (Pvt.) Ltd, ICB (Pvt.) Ltd, Lanka AAC (Pvt) Ltd, GAP (Pvt) Ltd and WSP Pvt. Ltd. His research interests are in the areas of Structural Engineering, Sustainability Structural, Health Monitoring, Disaster Mitigation, Fatigue.
Prof. Meththika Vithanage is a Professor and founding director of the Ecosphere Resilience Research Centre at the University of Sri Jayewardenepura, Sri Lanka. Prof. Vithanage's influence extends far beyond her home institution, as evidenced by her roles as an Adjunct Professor at the Institute of Agriculture, University of Western Australia, Sustainability Cluster, University of Petroleum and Energy Studies, India and the National Institute of Fundamental Studies, Sri Lanka. With a multifaceted academic background spanning water chemistry, environmental remediation, microplastics, and waste biomass conversion, Prof. Vithanage has earned international acclaim for her groundbreaking contributions. Recognized as a Highly Cited Researcher by Clarivate, she epitomizes excellence, ranking within the top 0.1% of highly cited scientists globally. With a prolific publication record comprising over 275 SCI-indexed journal articles, 60 book chapters, and 10 co-edited books published. Prof. Vithanage's citation record, exceeding 28,000 with an H-index of 83, reflects the profound impact of her research on global discourse and practice
Dr. Jayathu G. Samarawickram is a Senior Lecturer in the Department of Electronic & Telecommunication Engineering, Faculty of Engineering, University of Moratuwa, Sri Lanka. He obtained his B.Sc. Engineering with first-class honors and M.Sc. degrees in the field of electronic and telecommunication engineering from the University of Moratuwa. He obtained his Ph.D. degree in the field of humanoid robotics from the University of Genova and the Italian Institute of Technology in Italy. He worked as a Postdoctoral Fellow at the University of Genova, Italy, for one year on a European Union-funded project. Currently, he is a Director General at the at National Engineering Research and Development Centre of Sri Lanka, located in the Industrial Estate, Ekala, Ja Ela, Sri Lanka. His research interests are in the areas of Humanoids/Robotics, Electronic Systems, FPGA/DSP/GPU based systems, Embedded Systems, Computational Vision, Stereo Vision, Vision Heads.
Dr. Pradeep Gajanayake obtained his Bachelors and M.Phil. degrees in Agricultural Engineering from University of Peradeniya and PhD in Environmental Engineering from Saitama University, Japan. Dr. Gajanayake has authored/co-authored more than 15 peer-reviewed papers and 30 conference papers. Currently, he is a Senior Lecturer in Department of Biosystems Technology, Faculty of Technology, University of Sri Jayewardenepura, Pitipana, Homagama, Sri Lanka. His research interests are in the areas of Waste management and wastewater treatment.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 41.83 | £ 41.83 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.