Role of Sediment in the Design and Management of Irrigation Canals: UNESCO-IHE PhD Thesis
Language: English
Published by CRC Press, 2017
- Hardcover
- New

Seller: Biblios, frankfurt am main, hessen, GermanyBiblios
AbeBooks seller since September 10, 2024
Condition: New
£ 271.88
Quantity: 3 available
Add to basketSeller Inventory # 18378823916
- Title
- Role of Sediment in the Design and Management of Irrigation Canals: UNESCO-IHE PhD Thesis
- Author
- Paudel, Krishna P.
- Publisher
- CRC Press
- Publication year
- 2017
- Condition
- New
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 1138416002
- ISBN 13
- 9781138416000
- Series
- Book 49 of 150: IHE Delft PhD Thesis
The performance of irrigation schemes that carry sediment laden water is often poor. Modern irrigation schemes are increasingly demand based, which means that the water flow in the canals is determined by the crop water requirements. Accordingly the flow in the canal network is not constant as the crop water requirement changes with the climate and the growing stages. Also the inflow of the sediment is not constant throughout the irrigation season. Such schemes, particularly having unlined canals in alluvial soils, are difficult to design and to manage without compromising the flexibility or maintenance cost.
This research has made an in-depth assessment on the role of sediment in the design and management of an irrigation scheme by using the data of Sunsari Morang Irrigation Scheme, Nepal. An analysis of the velocity and shear stress distribution across a non-wide trapezoidal canal has been made to derive the correction factor for the sediment transport predictors. An improved approach based on a rational concept of the design of canals for sediment transport is proposed. By using the sediment transport model SETRIC, a water delivery plan has been designed and tested for changing water and sediment inflow conditions that can be implemented with the existing canal infrastructure.
The research also shows that flexibility of operation and efficient sediment management are difficult to achieve at the same time. A compromise has to be made and this needs to be reflected in the design. All methods to transport, exclude or extract the sediment are temporary measures and just transfer the problem from one place to the other. A better understanding of sediment movement helps to identify the problems beforehand and to find the best possible solutions.
"Synopsis" may belong to another edition of this title.
About the Author
"About the title" may belong to another edition of this title.
Biblios
frankfurt am main, hessen, Germany
AbeBooks seller since September 10, 2024
Shipping rates from Germany to U.S.A.
| Item | 25 to 45 business days | 8 to 14 business days |
|---|---|---|
| First item | £ 8.55 | £ 16.07 |
Payment methods
Store description
Specialty
new books imported from india, uk, usaSeller's business information
Readingos GmbH
Kaiserstraße 47
Frankfurt am Main, Germany 60329
Terms of sale
We ship from Frankfurt
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Biblios, frankfurt am main, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.