Rock Engineering Risk
Book 1 of 7: ISRM BookJohn A. Hudson (u. a.)
Sold by preigu, Osnabrück, Germany
AbeBooks Seller since 5 August 2024
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: 1 available
Add to basketSold by preigu, Osnabrück, Germany
AbeBooks Seller since 5 August 2024
Condition: New
Quantity: 1 available
Add to basketRock Engineering Risk | John A. Hudson (u. a.) | Buch | ISRM Book Series | Einband - fest (Hardcover) | Englisch | 2015 | Taylor & Francis Ltd | EAN 9781138027015 | Verantwortliche Person für die EU: Libri GmbH, Europaallee 1, 36244 Bad Hersfeld, gpsr[at]libri[dot]de | Anbieter: preigu.
Seller Inventory # 104908551
This book provides a new, necessary and valuable approach to the consideration of risk in underground engineering projects constructed within rock masses. There are Chapters on uncertainty and risk, rock engineering systems, rock fractures and rock stress, the design of a repository for radioactive waste, plus two major case examples relating to the headrace tunnels and caverns for a hydroelectric project. These Chapters highlight in detail the authors’ new rock engineering risk approach, especially how monitoring during construction can significantly reduce the construction risks. The book is particularly timely given the current increasing emphasis on geo-engineering safety, accountability and sustainability―which requires stricter attention to risk and greater reliability than ever before.
Written by two eminent authors, the two most recent past-Presidents of the International Society for Rock Mechanics (ISRM), this modern and well-illustrated guide on Rock Engineering Risk complements the authors’ previous 2011 book on Rock Engineering Design, also published by Taylor & Francis. The book will benefit engineers, contractors, clients, researchers, lecturers and advanced students who are concerned with rock engineering projects in civil, mining, geological and construction engineering worldwide.
John A. Hudson graduated from the Heriot-Watt University, UK, and obtained his PhD at the University of Minnesota, USA. He has spent his professional career in consulting, research, teaching and publishing in engineering rock mechanics, and was awarded the DSc. degree by the Heriot-Watt University for his contributions to the subject. He has authored many scientific papers and books, and was the editor of the 1993 five-volume “Comprehensive Rock Engineering” compendium, and from 1983–2006 editor of the International Journal of Rock Mechanics and Mining Sciences. Since 1983, he has been affiliated with Imperial College London as Reader, Professor and now Emeritus Professor. In 1998, he became a Fellow of the UK Royal Academy of Engineering and was President of the International Society for Rock Mechanics (ISRM) for the period 2007–2011. In 2015, the 7th ISRM Müller Award was conferred on Professor Hudson in recognition of “an outstanding career that combines theoretical and applied rock engineering with a profound understanding of the basic sciences of geology and mechanics”.
Xia-Ting Feng graduated in 1986 from the Northeast University of Technology and obtained his PhD in 1992 at the Northeastern University, China. He was then appointed and acted as Lecturer, Associate Professor and Professor at the same university. In 1998, he was admitted by the Hundred Talents Programme to the Chinese Academy of Sciences (CAS). Subsequently, he permanently joined CAS’s Institute of Rock and Soil Mechanics at Wuhan, China. In 2003, he obtained the support of the China National Funds for Distinguished Young Scientists; in 2010, he became a Chair Professor of the Cheung Kong Scholars’ Programme, Ministry of Education, China; and, in 2009, he was elected as President of the International Society for Rock Mechanics for the period 2011–2015. He is currently Director of the State Key Laboratory of Geomechanics and Geotechnical Engineering in Wuhan. Additionally, in 2012, Professor Feng became the Co-President of the Chinese Society for Rock Mechanics and Engineering. He has made original contributions to the subject of ‘intelligent rock mechanics’ and his methods have been applied to large rock engineering projects in China and other countries.
"About this title" may belong to another edition of this title.
Standard Business Terms and customer information
I. Standard business terms
§ 1 Basic provisions
(1) The following terms and conditions of business apply for all contracts concluded with us as the supplier (preigu GmbH & Co. KG) via the websites AbeBooks and/or ZVAB. Unless otherwise agreed, the inclusion of your own terms and conditions is explicitly rejected.
(2) A ?consumer' in the sense of the following regulations is every natural person who concludes a legal transaction which, to an overwh...
Instructions for revocation
Right of withdrawal for the sale of goods
Revocation right for consumers
(A ‘consumer' is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within 14 days without specifying any reasons.
The revocation period is 14 days with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
To exercise your right of withdrawal, you must inform us (preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, Telephone number: +49 (0) 541 / 580 72 84, E-Mail address: mail@preigu.de) by means of a clear declaration (e.g. a letter sent by post, or an e-mail) of your decision to withdraw from this contract. You can use the attached model withdrawal form for this purpose, which is, however, not mandatory.
You can also exercise your right of withdrawal online by clicking on a button labelled accordingly (such as ‘Withdraw from contract' or similar) on the AbeBooks/ZVAB website. If you use this online function, you will immediately receive a confirmation of receipt on a durable medium (e.g. via email) containing information on the content of the withdrawal notice, as well as the date and time of its receipt.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts. The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, Email address: mail@preigu.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
| Order quantity | 60 to 60 business days | 60 to 60 business days |
|---|---|---|
| First item | £ 59.82 | £ 59.82 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.