Road and bridge engineering test [Paperback]
Language: Chinese
Published by Chongqing University Press, 2000
- Softcover
- New

Condition: New
£ 58.73
- Bank Wire Transfer
- Paypal
Quantity: 1 available
Add to basketItem description from seller
Ship out in 2 business day, And Fast shipping, Free Tracking number will be provided after the shipment.Paperback Pages Number: 233 in Publisher: Chongqing University Press; 1st edition (October 1. 2005). Teaching material prepared according to the closely linked to the characteristics of road and bridge: positive process. The book is divided into two. first introduced road engineering test. the second sub-chapter describes the test of a bridge structure. bridge superstructure detection. bridge load test. and the bridge foundation testing the basic principles and methods. each chapter with a certain number of Thinking of questions and exercises. The book is refined and practical. focused ability of road and bridge engineering test. Either as institutions of higher learning in Civil Engineering road and urban road directions. road and bridge direction. bridge and tunnel direction. the direction of transportation construction undergraduate teaching materials can also be used as roads and bridges engineering test personnel training materials. In addition. also available in municipal engineering and bridge engineering and technical personnel to use and reference. Contents: a road engineering test Chapter 1 roadbed road geometric dimensions and pavement thickness determination of 1.1 highway subgrade and pavement field testing randomly selected point method of the geometric dimensions of 1.2 of Pavement Detection 1.3 pavement thickness testing exercises in Chapter 2 of Pavement Compaction detection of 2.1 Overview 2.2 cutting ring. sand and irrigation method determination of the degree of compaction 2.3 core drilling method for the determination of the asphalt surface compaction 2.4 nuclear instrument determination of the degree of compaction 2.5 of Pavement Compaction assessment exercises in Chapter 3 of Pavement flatness of detection of 3.1 Overview 3.2 3 m straightedge with the continuous formation tester determination of the flatness of 3.3 car bumps cumulative measure flatness Exercises Chapter 4 road skid resistance testing 4.1 Overview 4.2 pavement structure depth determination of 4.3 road surface friction coefficient of determination exercises in Chapter 5 of Pavement Strength and Deflection 5.1 bearing plate method for the determination of resilient modulus of soil base 5.2 Beckman Beam Determination of subgrade and pavement subgrade resilient modulus of 5.3 and Flexible Pavement Deflection Determination of C values ??of 5.4 soil base and the base material task. the purpose of determination of the two exercises Chapter 1 of the bridge structure test for detection of bridge structures test 1.1 bridge structural testing and classification of 1.2 bridge structural test design. data processing and preparation of the report to practice Chapter 2 of the title bridge superstructure detected 2.1 bridge bearings and expansion devices to test the 2.2 Concrete Structures test for detection of 2.3 prestressed concrete structures test for detection of 2.4 steel test for detection of 2.5 suspension structure test for detection of exercises in Chapter 3 of the Bridge Load Test 3.1 The purpose of the load test and the main content of 3.2 to load the program measuring points test 3.5 3.3 Static load test equipment 3.4 static load test data analysis and bridges carrying capacity assessment of the commonly used instruments and equipment 3.8 3.6 bridge dynamic load test range 3.7 to load test the bridge dynamic load test 3.9 test data collation and analysis exercises Chapter 4 bridge the basis of detection of 4.1-bearing capacity of foundation detection 4.2 drill hole pile testing (dig) 4.3 Pile Bearing Capacity Test Exercise Appendix measurement of concrete strength conversion tables ReferencesFour Satisfaction guaranteed,or money back.…
Seller Inventory # MM1795
Bibliographic details
- Title
- Road and bridge engineering test [Paperback]
- Author
- XING SHI JIAN
- Publisher
- Chongqing University Press
- Publication year
- 2000
- Condition
- New
- Binding
- paperback
- Language
- Chinese
- ISBN 10
- 7562434832
- ISBN 13
- 9787562434832
Shipping rates from China to U.S.A.
| Item | 16 to 30 business days | 8 to 16 business days |
|---|---|---|
| First item | £ 13.61 | £ 22.68 |
Store description
Thank you for visiting My bookstore! We are an online bookstore, and Is the China's largest online book sales. Generally our books are from China, with reasonable price and decent printing quality. We are always trying our best to satisfy customer's needs!
Specialty
Chemistry, Mathematics, Computer, Physics, Environment, Social SciencesSeller's business information
NAN JING SHI JIANG NING QU NING YUAN DIAN ZI SHANG WU ZHONG XIN
Room 264, Oujiang Shopping Center, No. 1 Dongxin South Road, Dongshan Street, Jiangning District, NanJing
Nanjing, JS China 211100
Terms of sale
We guarantee the condition of every book as it's described on the Abebooks web sites. If you're dissatisfied with your purchase (Incorrect Book/Not as Described/Damaged) or if the order hasn't arrived, you're eligible for a refund within 30 days of the estimated delivery date. If you've changed your mind about a book that you've ordered, please use the Ask bookseller a question link to contact us and we'll respond within 2 business days. Please Note:We don't sell any international Edition to you. Don't send any question about international Edition to us.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to liu xing, Nanjing, JS, China, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Most orders are shipped within 24 hours. We will delivery these items to you by SAL, EUB, EMS, FEDEX etc.