Resource Utilization of Solid Waste by Thermometallurgy in Steel Processes
Language: English
Published by Springer Verlag GmbH, 2024
- Softcover
- New

Condition: New
£ 78.46
Quantity: Over 20 available
Add to basketItem description from seller
Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt.
Seller Inventory # 1836220685
- Title
- Resource Utilization of Solid Waste by Thermometallurgy in Steel Processes
- Author
- Dong, Kai/Wang, Hongyang/Jiang, Zhenqiang
- Publisher
- Springer Verlag GmbH
- Publication year
- 2024
- Condition
- New
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 9819956579
- ISBN 13
- 9789819956579
This book intends to summarize the current situation at home and abroad about the treatment and consumption of various metallurgical wastes and domestic waste fertilizers and their products through metallurgical processes. It collects the process characteristics of the whole metallurgical process from sintering, blast furnace, electric furnace, converter, and other aspects, as well as the process parameters for treating various solid wastes, solves the problems that may be encountered in the relevant processes, and puts forward corresponding solutions, including the transformation of the process flow or the addition of some pre-treatment links. In addition, this book also evaluates some important production and digestion processes and puts forward relevant suggestions for readers to have a more comprehensive thinking. University teachers, graduate students, researchers, and engineers engaged in iron and steel metallurgy process, especially those who use iron and steel process to absorb metallurgical solid waste and domestic solid waste together, will be of great help to them.
"Synopsis" may belong to another edition of this title.
About the Author
Kai Dong
Area of Work: Mainly engaged in short-process steelmaking of electric arc furnace, CO2 resource utilization of iron and steel process, energy conservation and environmental protection of metallurgical process, combined solid waste disposal, and development of process technology related to metallurgical intelligent control
Honors: Won 1 national award and 7 provincial and ministerial science and technology awards, including the second prize of 2016 National Science and Technology Progress Award for "Research and Application of Electric Arc Furnace Steelmaking Compound Blowing Technology", the first prize of 2020 Beijing Science and Technology Award for "Clean Smelting Technology and Application of High Quality Pipe Steel", the second prize of 2021 China Metallurgical Science and Technology Award for "Carbon Dioxide Green and Clean Steelmaking Technology and Application", and the first prize of the Outstanding Achievement Award for Scientific Researchin 2022 for "Carbon Dioxide Steelmaking Technology Based on Soot Reduction and Steel Purification".
Selected Publication:
1. An experimental comparison: Horizontal evaluation of valuable metal extraction and arsenic emission characteristics of tailings from different copper smelting slag recovery processes.
2. Effects of substituting municipal waste incineration fly ash for lime on generating a bonding phase during the sintering process.
3. Effects of Nozzle Layout and Parameters on the Jet Characteristics of a CO2 + O2 Mixed Oxygen Lance.
4. Experimental Study on Decarburization and Chromium Retention in Stainless Steel Smelting with CO2 as Alternative to N-2.
5. Influence of Preheating Temperature on the Characteristics of O2 + CO2 Jet by Mixed Injection with a Swirling Oxygen Nozzle.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 41.47 | £ 41.47 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Online Handel nur mit Neubüchern
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
About Us
Legal website operator identification:
Moluna GmbH
Represented by the general manager Helge Blischke
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
Telefax: 02571/5698930
E-Mail: abe@moluna.de
VAT No.: DE296281834
listed in the commercial register of the local court Steinfurt
Commercial register number - Part B of the commercial register - 10553
We are a member of the initiative „FairCommerce“ since 24.07.2015.
For more information, see: www.haendlerbund.de/faircommerce.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.