Reliability and Risk Assessment in Engineering : Proceedings of INCRS 2018
Vijay Kumar Gupta
Sold by AHA-BUCH GmbH, Einbeck, Germany
AbeBooks Seller since 14 August 2006
New - Hardcover
Condition: New
Quantity: 1 available
Add to basketSold by AHA-BUCH GmbH, Einbeck, Germany
AbeBooks Seller since 14 August 2006
Condition: New
Quantity: 1 available
Add to basketDruck auf Anfrage Neuware - Printed after ordering - This volume is a collection of articles on reliability and safety engineering presented during INCRS 2018. The articles cover a variety of topics such as big data analytics and their applications in reliability assessment and condition monitoring, health monitoring, management, diagnostics and prognostics of mechanical systems, design for reliability and optimization, and machine learning for industrial applications. A special aspect of this volume is the coverage of performance, failure and reliability issues in electrical distribution systems.This book will be a useful reference for graduate students, researchersand professionalsworking in the area of reliability assessment, condition monitoring and predictive maintenance.
Seller Inventory # 9789811537455
Dr. Vijay Kumar Gupta is currently working as a Professor in the department of Mechanical Engineering at PDPM-Indian Institute of Information Technology, Design and Manufacturing Jabalpur. He has more than 25 years of teaching and research experience. He obtained his PhD in Mechanical Engineering from Indian Institute of Technology Bombay, India. His research interests include smart structure, vibration, design, reliability, finite element analysis, mechatronics and robotics, etc. He has published more than 30 papers in refereed journals and conferences and one book. He is recipient of ISAME K. Suryanarayan Rao Memorial Senior Student Award for R&D in Smart Technology for year 2003. He is a member of ASME, SPIE, IEEE, SRESA and other professional bodies.
Dr. P.V. Varde was Associate Director of Reactor Group, Bhabha Atomic Research Center, Mumbai, India and is Senior Professor, Homi Bhabha National Institute, Mumbai. He completed his PhD from IIT Bombay in 1996. He worked as post-doctoral fellow at Korea Atomic Energy Research Institute, South Korea in 2002 and was visiting professor at CALCE, University of Maryland, USA in 2012. His research interests are development of prognostic models for nuclear plants components in general and electronic components in particular. He worked as a consultant with several international organizations such as OECD/NEA (WGRISK) Paris, International Atomic Energy Agency, Vienna, etc. He is a chief editor for International Journal of Life Cycle Reliability and Safety Engineering. He has over 250 publications, which includes 10 conference proceedings/books, in national and international publications.
Dr. Pavan Kumar Kankar is an Associate Professor in the department of Mechanical Engineering, Indian Institute of Technology Indore. He has over 14 years of teaching and research experience. He obtained his PhD from Indian Institute of Technology Roorkee, India. His research interests include vibration, design, condition monitoring of mechanical components, nonlinear dynamics, soft computing, etc. He has published more than 100 papers in refereed journals and conferences. His work has been cited more than 1500 times. He also served as a guest editor of special issues of various journals of national and international repute. He is a member of professional bodies like American Society of Mechanical Engineers, Society for Reliability and Safety (SRESA), Tribology Society of India and International Institute of Acoustics & Vibration (IIAV).
Mr. Narendra Joshi is working as Secretary and founder member of the Society for Reliability & Safety, and is the Managing Editor of SRESA-Springer International Journal on Life Cycle Reliability and Safety Engineering. He has over 20 publications to his credit in journals and conferences. Mr. Joshi is currently looking after the activities of Human Resource Development, Simulator Training, Root Cause Analysis andsafety documentation in research reactors at the Bhabha Atomic Research Centre, Mumbai. He has also worked in Operation and Maintenance of research reactors for 13 years. He was involved in preparation of Probabilistic Risk Assessment of research reactors at Trombay and Risk Informed In-Service Inspection.
"About this title" may belong to another edition of this title.
General Terms and Conditions and Customer Information / Privacy Policy
I. General Terms and Conditions
§ 1 Basic provisions
(1) The following terms and conditions apply to all contracts that you conclude with us as a provider (AHA-BUCH GmbH) via the Internet platforms AbeBooks and/or ZVAB. Unless otherwise agreed, the inclusion of any of your own terms and conditions used by you will be objected to
(2) A consumer within the meaning of the following regulations is any natural person who concludes...
**Right of withdrawal for consumers **
(A consumer is any natural person who concludes a legal transaction for purposes that can predominantly be attributed neither to their commercial nor their independent professional activity.)
Cancellation
Withdrawal
You have the right to revoke this contract within fourteen days without giving reasons.
The revocation period is fourteen days from the day,
on which you or a third party named by you, who is not the carrier, has taken possession of the goods, provided that you have ordered one or more goods within the framework of a uniform order and these are or will be delivered uniformly;
on which you or a third party named by you, who is not the carrier, has taken possession of the last goods, provided that you have ordered several goods within the framework of a single order and these are delivered separately;
on which you or a third party named by you, who is not the carrier, has taken possession of the last partial shipment or the last piece, provided that you have ordered goods that are delivered in several partial shipments or pieces;
In order to exercise your right of withdrawal, you must inform us (AHA-BUCH GmbH, Garlebsen 48, 37574 Einbeck, telephone number: 05563 9996039, fax number: 05563 9995974, e-mail address: service@aha-buch.de) of your decision to revoke this contract by means of a clear declaration (e.B. a letter sent by post, fax or e-mail). You can use the attached model withdrawal form, but this is not mandatory.
To comply with the revocation period, it is sufficient that you send the notification of the exercise of the right of revocation before the expiry of the revocation period.
Consequences of revocation
If you withdraw from this contract, we shall reimburse you all payments that we have received from you, including delivery costs (with the exception of the additional costs resulting from the fact that you have chosen a different type of delivery than the cheapest standard delivery offered by us), immediately and at the latest within fourteen days from the day on which we received the notification of your revocation of this contract.
For this repayment, we will use the same means of payment that you used for the original transaction, unless expressly agreed otherwise with you; in no case will you be charged any fees for this repayment.
We may withhold reimbursement until we have received the goods back or until you have provided proof that you have returned the goods, whichever is the earlier.
You must return or hand over the goods to us immediately and in any case at the latest within fourteen days from the day on which you inform us of the revocation of this contract. The deadline is met if you send the goods before the expiry of the period of fourteen days.
You bear the direct costs of returning the goods.
You only have to pay for any loss of value of the goods if this loss of value is due to handling of the goods that is not necessary to check the nature, characteristics and functioning of the goods.
Reasons for exclusion or extinction
The right of revocation does not apply to contracts
The right of revocation expires prematurely in the case of contracts
Sample withdrawal form
(If you want to cancel the contract, please fill out this form and send it back.)
To AHA-BUCH GmbH, Garlebsen 48, 37574 Einbeck, fax number: 05563 9995974, e-mail address: service@aha-buch.de :
I/we () hereby revoke the contract concluded by me/us () for the purchase of the following goods ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of notification on paper)
Date
(*) Delete as appropriate.
We ship your order after we received them
for articles on hand latest 24 hours,
for articles with overnight supply latest 48 hours.
In case we need to order an article from our supplier our dispatch time depends on the reception date of the articles, but the articles will be shipped on the same day.
Our goal is to send the ordered articles in the fastest, but also most efficient and secure way to our customers.
| Order quantity | 30 to 40 business days | 7 to 14 business days |
|---|---|---|
| First item | £ 57.37 | £ 66.12 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.