Reducedeffort Changeover: The Lean Way to Quickly Reduce Changeover Downtime, Second Edition
Language: English
Published by Productivity Pr, 2020
- Softcover
- New

Seller: Revaluation Books, Exeter, United KingdomRevaluation Books
AbeBooks seller since January 6, 2003
Condition: New
£ 59.90
Quantity: 2 available
Add to basketItem description from seller
2nd edition. 170 pages. 10.00x6.75x0.75 inches. In Stock.
Seller Inventory # x-0367408902
- Title
- Reducedeffort Changeover: The Lean Way to Quickly Reduce Changeover Downtime, Second Edition
- Author
- Heiskell, Ron
- Publisher
- Productivity Pr
- Publication year
- 2020
- Condition
- Brand New
- Binding
- Paperback
- Language
- English
- ISBN 10
- 0367408902
- ISBN 13
- 9780367408909
- Item weight
- 0.41 kilograms
ReducedEffort® Changeover: The Lean Way to Quickly Reduce Changeover Downtime provides a step-by-step guide for conducting a Kaizen event that empowers the people who do the work to improve how that work is done. Packed with tips, tools, and examples, this practical guide begins with a clear description of the Lean principles underlying the ReducedEffort Changeover system. In addition, it explains how and why reducing the effort always reduces the time of converting a machine, line, or process from one product to another. In this book, you’ll find everything you need to quickly and dramatically reduce the effort and time of any process using the ReducedEffort method.
This is not another book about how to do SMED. Like SMED, ReducedEffort Changeover (REC) does reduce changeover time, but REC is not SMED.
SMED, Single Minute (or digit) Exchange of Dies, developed by Dr. Shigeo Shingo, has been the process used for many years by countless manufacturing plants to reduce changeover time. The SMED process was used in Toyota to reduce the changeover of a 1,000-ton stamping press from four hours to three minutes.
As a Lean-based process, the REC system focuses on reducing the labor, not the time, involved in changing over a machine to work on a different product. With REC, there are no Standard Operation Combination Sheets to fill out and no Problem Identification Sheets to complete, and it does not require the arduous chore of timing every task, as SMED does.
Very little capital investment is required with REC. Unlike SMED, it does not require management-approved funding to achieve substantial results. Because REC is not capital-driven, management does not need to drive the process. The operators will drive the process because it reduces their labor. One of the biggest advantages of REC over SMED is that operators will readily accept the process, and more important, they will want to sustain it. The reason for this is quite simple and will become evident when the REC process is defined. REC takes SMED to a new level that is easier and faster both to implement and to deliver sustainable results.
"Synopsis" may belong to another edition of this title.
About the Author
Ron Heiskell has a BS in mechanical engineering and an MBA in technology management. A knowledgeable advocate and practitioner of Lean principles, Ron first developed and tested the Lean-driven process that evolved into the ReducedEffort system at The Clorox Company, where he was an engineer for 24 years.
During his first 22 years at The Clorox Company, Ron worked in the Machine Development Group, designing and building packaging machines and lines. During that time, he began teaching a class on product innovation at two California universities. As part of this class, he taught the role that paradigms play in people resisting new ideas. He also discovered a way to shift a person’s paradigm very quickly.
When Ron was asked to teach SMED at The Clorox Company manufacturing plants, he agreed―in part because he saw it as his chance to try some new techniques. He knew that line workers had their own ways of performing changeovers and that many of them had been doing it the same way for a long time, often for 25 or more years. Their paradigms were well established. The challenge was to get them to readily shift paradigms and try something different. Teaching SMED at The Clorox Company gave Ron the opportunity to try this new reduced-effort process in the real world. The results were so amazing that his job shifted from designing packaging lines to reducing changeover downtime in all the plants owned by The Clorox Company as well as those of its suppliers.
After leaving The Clorox Company, Ron founded ReducedEffort, LLC., a company devoted to reducing changeover downtime. Since that time, he has been conducting ReducedEffort Kaizen Events at Fortune 500 companies throughout the United States and Canada.
Ron has received over fifty U.S. and foreign patents. He is the recipient of the AmeriStar Award from the Institute of Packaging Professionals, the Technology of the Year Award from Packaging Technology & Engineering Magazine, and the Dupont Award for Innovation.
"About the title" may belong to another edition of this title.
Revaluation Books
Exeter, United Kingdom
AbeBooks seller since January 6, 2003
Shipping rates from United Kingdom to U.S.A.
| Item | 7 to 14 business days | 2 to 3 business days |
|---|---|---|
| First item | £ 10.00 | £ 30.00 |
Payment methods
Seller's business information
Edward Bowditch Ltd
Exstowe, Exton
Exeter, United Kingdom EX3 0PP
Terms of sale
Legal entity name: Edward Bowditch Ltd
Legal entity form: Limited company
Business correspondence address: Exstowe, Exton, Exeter, EX3 0PP
Company registration number: 04916632
VAT registration: GB834241546
Authorised representative: Mr. E. Bowditch
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Revaluation Books, Hounslow, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually dispatched within two working days.