Recent Trends in Water Resources and Pollution Control in BRICS Nations
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt.
Seller Inventory # 2089476977
This book offers innovative scientific ideas and technical expertise for a sustainable solution in water resources and water pollution treatment. The book explores and explains the potential of the emerging partnership between Brazil, Russia, India, China, and South Africa (BRICS) in solving the water-related issues in the BRICS countries. The book serves as baseline information for future adaptation plans in water-related issues in the BRICS countries. It covers inter-disciplinary research and applications in integrated water resource management, water quality assessment, water pollution and treatment in the BRICS nations. The topics on water resource management include technological intervention and solutions for climate change impacts on water resources, irrigation system, water security, clean water to all, sustainable water reuse, flood risk assessment, river basin management, hydro policy and wastewater-based monitoring of COVID 19 infections. This book will be useful for students, researchers, policymakers, and professionals working in the areas of water management, wastewater treatment, industrial wastewater treatment and environmental sciences.
Hirok Chaudhuri is currently an Associate Professor at the Department of Physics, National Institute of Technology Durgapur (NITD), India. He is also an adjunct faculty and joint coordinator of the Center for Research on Environment and Water at NITD. He obtained his B. Sc. Hons (Physics) and M. Sc. (Physics) from Burdwan University, West Bengal, India. He completed his Ph.D. in experimental physics from Saha Institute of Nuclear Physics, Kolkata, India, and he performed post-doctoral research activity at Variable Energy Cyclotron Center [VECC (a unit of the Department of Atomic Energy, Government of India)], Kolkata, India. His major areas of research interests include geochemistry for the groundwater and surface water, wastewater treatment using nanotechnology, geochemical precursors for earthquakes, geothermal exploration, helium exploration, environmental radioactivity, nonlinear dynamics. He has published 29 scientific papers in peer-reviewed journals and contributed to 9 book chapters. His current supervision includes 25 masters and 7 doctoral students. He is the founder coordinator of the Science Museum at NITD. He is also acting as joint coordinator for the Center for Digital Learning (CDL) at NITD. Dr. Chaudhuri is also working as a member of the International Thematic Group (ITG) of the Brazil-Russia-India-China-South Africa (BRICS) Network University Programme on water resources and pollution treatment. He was selected as a Fellow of the Earth Science Society of India in 2015. Presently he is serving as a member of the State Level Steering committee for RAA (a joint venture of Government of India, Ministry of Education and State Government of West Bengal to promote science at the state of West Bengal, India). Dr. Chaudhuri received Visiting Scientist Fellowship from Government of India, Department of Atomic Energy at VECC, Kolkata.
Faizal Bux is currently the Director of the Institute for Water and Wastewater Technology, Durban University of Technology (DUT), South Africa. He obtained his B. Sc. Hons (Microbiology) from University of Durban Westville, M. Tech (Biotechnology) from Technikon Natal and Ph.D. (Biotechnology) from Durban University of Technology. His major areas of research interests include environmental biotechnology, water and wastewater treatment, wastewater beneficiation, environmental health, biotechnological applications of microalgae including biodiesel, bioremediation of industrial effluents and bio products. He has published more than 200 scientific papers in leading Science Citation Index Journals an^ 9900. H-index 49 (Google Scholar). Prof. Bux supervised 53 masters and doctoral graduates. His current supervision includes 17 masters and 13 doctoral students. 34 post-doctoral fellows served their tenure under his guidance. He is a recipient of the WRC legends award (2021) and NSTF-WRC Water Research Award (2019/2020). He also won NRF-Champion of Research Capacity Development and Transformation at South African Higher Education Institutions (2018). He received WRC Knowledge Tree Award (2017). He is a fellow of the International Water Association, Royal Society of Chemistry and Senior Fellow of WISA. He is the Chair of BRICS-Network Universities ITG: Water Resource Management and Pollution treatment since, July 2018.
Nilo de Oliveira Nascimento is a full professor at the Department of Hydraulic and Water Resources Engineering of the Federal University of Minas Gerais (UFMG), in Brazil. He did graduation in Civil Engineering from Federal University of Minas Gerais, Brazil, master’s degree in Operational and Applied Hydrology from École Polytechnique Fédérale de Lausanne, Switzerland, and Ph.D. in Environmental Sciences from École Nationale des Ponts et Chaussées, France. His major areas of research interests include urban drainage with focus on flood studies, sustainable urban drainage systems (SUDS) and blue and green infrastructure. He is the co-author of 13 books and 47 peer-reviewed journal articles. His current supervision includes 36 masters and 23 doctoral students. Advisor of MSc (concluded: 35, on-going: 1) and Ph.D. students (concluded: 17, on-going: 6). He served as Deputy Director of International Relations of UFMG between 2012 and 2014 and as Head of the UFMG Graduate Program on Sanitation, Environment and Water Resources from 2015 to 2018. He has been member of the IWA/IAHR Joint Committee on Urban Drainage (2006-2012) and is member of the editorial board of the Urban Water Journal. As a consulting civil engineer, he acted in more than 20 projects, most of them focusing on flood studies, urban drainage, urban development, and regional planning.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.37 | £ 42.37 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.