Recent Trends in Civil Engineering
Book 107 of 362: Lecture Notes in Civil EngineeringNew - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. It presents latest research in different domains of civil engineering like structural and concrete engineering, geotechnical engineering, transportation engineering, environmental engineering, and construction technology and management.This book comp.
Seller Inventory # 523474109
This book comprises select peer-reviewed proceedings of the International Conference Trending Moments and Steer Forces – Civil Engineering Today (TMSF 2019). It presents latest research in different domains of civil engineering like structural and concrete engineering, geotechnical engineering, transportation engineering, environmental engineering, and construction technology and management. The contents also include miscellaneous applications of civil engineering in a wide range of technical and societal problems making use of engineering principles and relational data structures involving measurement sciences. Given the range of topics covered, this book can be useful for students, researchers as well as practitioners working in the field of civil engineering.
Dr. Biibhuti Bhusan Das is currently serving as an Associate Professor at National Institute of Technology, Karnataka, Surathkal, India. His research interests include design and development of sustainable construction and building materials, microstructure and durability of concrete, construction planning and practices. Dr. Das has handled a number of research projects sponsored from Department of Science and Technology (DST), Govt. of India; Royal Academy of Engineering (RAEng), UK; Kudremukh Iron Ore Company Limited (KIOCL); Mangalore Refinery and Petro Chemicals Limited (MRPL). The fund generation and research contributions have led to the development of Sustainable Construction and Building Materials Laboratory at NITK Surathkal, a specialized lab that practices the theme of sustainability. He has published over 100 papers in Journals and conferences, and has given several key-note presentations across the world. He has guided four doctoral students and more than sixty master’sthesis. Currently, he has eight students who are doing their doctoral thesis and around fifteen students having their master’s degree. He has been serving as a Post-Doctoral Research Associate from Centre for Innovative Materials Research (CIMR), Lawrence Technological University, Southfield, Michaigan, USA and has obtained Doctorate of Philosophy from Indian Institute of Technology (IIT) Bombay, India. He is a Master’s degree holder in Construction Engineering and Management from Indian Institute of Technology (IIT) Delhi, India. He has won a number of awards one of the prestigious being the Outstanding Reviewer award from Construction and Building Materials Journal, Elsevier. He has edited number of books entitled Sustainable Construction and Building Materials-Select Proceedings of ICSCBM 2018, Recent Developments in Sustainable Infrastructure-Select Proceedings of ICRDSI 2019, Smart Technologies for Sustainable Development-Select Proceedings of SMTS 2019 and also guest edited theJune-2019 edition of the Indian Concrete Journal and is on the editorial panel of some of the reputed Construction Engineering and Material journals.
Dr. Sreejith V. Nanukuttan is currently a senior lecturer in the School of Natural and Built Environment, Queen’s University Belfast. He graduated from Queen’s University Belfast with a PhD in civil engineering in 2007 on development of a non-destructive test for concrete in chloride environments. In 2008, he joined the School of Natural and Built Environment as a lecturer and was instrumental in developing MSc in durability of structures and course on whole life management of structures. In 2013-14 he took Royal Academy supported industrial secondment with Roads Service Northern Ireland where he was responsible for structural assessment and subsequent rehabilitation of two transport bridges, projects of over £2m. The in-situ test he developed through his PhD for assessing chloride transport through concrete and the instrument is commercialized through Amphora Non-Destructive Ltd., His recently completed EPSRC funded project developed retrofit decision tool for converging energy efficiency measures, this simplified coding is licensed to Energenius for integration with their smart energy management system for social landlords. Through his research he maintains a balance between material technology, building performance and structural efficiency and to date has managed research income of over £1.9m. He has supervised 4 complete PhDs, 6 PDRAs and 2 RAs. He is the immediate past president of Civil Engineering Research Association of Ireland and is a member of RILEM technical committees 230-PSC, 247-DTA and newly formed CIM. He has authored over 75 technical articles including 20 in refereed international journals.
Dr. Anil K. Patnaik is a professor of structural engineering at The University of Akron in Ohio, USA. He earned his Ph.D. from the University of Calgary, and master’s degree in structural engineering from the Indian Institute of Technology in Kanpur, and a bachelor’s degree in civil engineering from National Institute of Technology, Rourkela in India. He has over twenty years of experience in academic positions at South Dakota School of Mines and Technology (SDSM&T) in Rapid City, Curtin University in Perth (Australia), the University of Western Australia, and presently is working at the University of Akron in Ohio. His current and recently funded research projects are on corrosion of reinforced concrete and steel structures, reinforced concrete members subjected in impact loads, synthetic and basalt fiber reinforced concrete (FRC), fiber reinforced polymer (FRP) materials for structural concrete applications, repair and strengthening of existing structures, construction and long term performance monitoring of bridge decks, structural slab bridges, prestressed concrete adjacent box-beam bridges, and carbon footprint assessment and life cycle analysis (LCA). He is theauthor or co-author of over 100 technical papers, and over 100 research and design reports. He edited a book on high volume fly ash concrete and co-edited a book on high performance high strength concrete. He has several years of experience as a practicing engineer in design and construction of large industrial, commercial and offshore structures, and tall buildings. He taught and continues to teach several courses on structural engineering including reinforced and pre-stressed concrete design, FRP reinforced concrete design, senior design, tall building design, steel design and structural analysis at the undergraduate and graduate levels at several universities.Dr. Neena Shekhar Panandikar is principal of Don Bosco College of Engineering, Fatorda Goa, entitled to be the first lady Principal of a technical institution in the state of Goa. She has published twenty research papers in various international journals, national and international conferences. As a part of social responsibility, she served as a member and developed curriculum for Rural Health Education Project, a joint project of Agnel Technical Education Complex in association with Algonquin College, Canada sponsored by CIDA (Canadian International Development Agency). She was appointed as an expert member as a part of Affiliation Committee by the Goa University to sanction postgraduate program in structural engineering at Goa College of Engineering. She is a life member of ISTE, Association of Structural Engineers and Indian Concrete Institute. She is a Chartered Engineer and has been conferred with IEI fellow membership. She was among 100 leaders selected from across the country to attend a workshop on leadership under AICTE-UKIERI, jointly organized by AICTE in association with Dudley College, UK and has received CMI certification in management and leadership. She is also on the academic council of Goa University and at present serving as a member of Goa State Innovation Council."About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 41.63 | £ 41.63 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.