Recent Developments in Wind Engineering
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt.
Seller Inventory # 2647691275
This book presents the select proceedings of the 10th National Conference on Wind Engineering (NCWE 2024). It broadly explores five major areas of research. The ‘testing methodologies’ section focuses particularly on the recent developments in wind tunnel testing, computational wind engineering and field measurements. It also delves into wind loading on structures, encompassing bridges, facades, chimneys, cooling towers, steel towers and low-rise and high-rise structures. The book also addresses revisions to the Indian Standard (IS) Codes The book has a dedicated chapter on measurements and assessments related to wind meteorology, wind climate assessment, urban wind environment, and disaster mitigation. It especially presents the recent advances in utilising Artificial intelligence (AI) and Machine Learning (ML) for predictions. This book also covers other important topics like wind-induced vibrations and control, specifically within aerodynamics and aeroelasticity. It also covers topics like wind turbines and other industrial aerodynamics, including vehicle and sports aerodynamics.
Dr. Vinayagamurthy Ganesan is an Associate Professor and the Head of the Aerodynamics Laboratory at Vellore Institute of Technology (VIT), Chennai. He played a pivotal role in establishing this laboratory and took the lead in developing a wind tunnel facility within it. He secured funding from the Department of Science & Technology (DST) to conduct research on the impact of wind on expansive roofs, with a specific focus on airport settings. His proactive involvement extends to consultancy projects for various industries, totalling around 40 Lakhs. Dr. Vinayagamurthy's research interests encompass bluff body aerodynamics, fluid-structure interaction, Computational Fluid Dynamics (CFD), wind effects on cable-stayed bridges, wind turbines, machine learning, and artificial intelligence. His impactful research has led to the publication of over 50 papers in prestigious international journals and conferences. In recognition of his outstanding contributions, Dr. Vinayagamurthy was honoured with the Best Master’s Thesis award in wind engineering by the Indian Society of Wind Engineering in 2009. Currently, he leads a team with three ongoing PhD students and one PhD student who has successfully completed their program.
Dr. Shuyang CAO is a professor of the College of Civil Engineering, Tongji University, China. He received his Bachelor Degree at Shanghai Jiaotong University, China in 1988, Master and Doctoral Degrees at Miyazaki University, Japan in 1998 and 2001. Before he joined Tongji University, he was an GCOE associate professor and professor of Tokyo Polytechnic University, Japan during 2004-2009, assistant professor at Tokyo Institute of Technology, Japan during 2001-2004, and a researcher of China Shipbuilding Industry Corporation during 1988-1993.Dr. Shuyang Cao works in both structural and environmental wind engineering fields with particular research interests encompassing wind climate, structural aerodynamics, structural wind effects, environmental implications, socioeconomic impacts of wind hazards, and wind energy among others. He developed the world’s first actively controlled multiple-fan wind tunnel and China’s first tornado-like vortex generator. He developed a series house-made CFD models and solvers for computational wind engineering applications. He has contributed to 4 books, more than 120 journal papers and more than 100 conference papers. He was the keynote/invited speaker at more than 30 international conferences in his field of expertise including the 14th International Conference of Wind Engineering (ICWE) and the 8th Asia Pacific Conference of Wind Engineering (APCWE). He was the co-chair of the Scientific Committee of the 15th ICWE in 2019 that was the first ICWE in China. He is an Editorial Board member of Journal of Wind Engineering and Industrial Aerodynamics (JWEIA), Wind and Structures, An International Journal (W&S) among others. He was the guest editor of JWEIA special issues for BBAA in 2013 and ICWE15 in 2019.Dr. Shuyang Cao is the Vice-President of the International Association for Wind Engineering (IAWE) in 2023-2027. He had served as the Secretary General of IAWE in 2007-2023 and has been serving as the secretary and the vice-chair of Internal Group for Wind-related Disaster Risk Reduction since 2009. He is now a vice director of the State Key Laboratory for Disaster Risk Reduction in Civil Engineering, China and a member of the Board of Directors of the China Aerodynamics Research Society. He has been the members of a lot of international and domestic professional research committees, including ISO working group on wind load and wind engineering working group of Chinese Civil Engineering Society. He received the award of Japanese Association for Wind Engineering in 2010 and the Second Prize of National Award of Science and Technology of China in 2024.
Prof. K.M. Parammasivam is currently the Head Of the Department of Aerospace Engineering, Madras Institute of Technology Campus, Anna University, Chennai. He has completed his B.E from PSG College of Technology, Coimbatore. He has completed his M.E and PhD from MIT, Anna University. He has done his Post Doctoral Fellowship (PDF) from Tokyo Polytechnic University, Japan. He has more than 32 years of academic and research experience. In his vast academic career, he has published more than 60 papers in national and international indexed journals. He has presented at more than 130 reputed national and international conferences. He has received 2 patents and filed 4 more in his research career. He has guided 9 PhD scholars in the past. Currently, he is guiding 10 research scholars and has established research labs in combustion and aerodynamics streams. He is an expert member in various government bodies and he is actively involved in the board of studies of 11 universities and institutions. He has ample international and national research experience and has successfully completed sponsored projects of various government funding agencies such as University Grants Commission (UGC), Aeronautics Research and Development Board (AR&DB), All India Council for Technical Education (AICTE) and Defence Research & Development Laboratory (DRDL). He is a fellow of the Institute of Engineers (India) and a member of many notable professional bodies such as the American Institute of Aeronautics and Astronautics (AIAA) and the Society of Automotive Engineers (SAE). He is an excellent orator and has done many outreach programs and Faculty development programs.
Dr. S. Selvi Rajan, formerly the Chief Scientist and Head of the Wind Engineering Laboratory at CSIR-SERC, is a seasoned professional with a rich background in wind engineering, particularly excelling in disaster mitigation and wind code development. Over her career spanning more than 35 years, she has actively collaborated with diverse institutes, including Western University (UWO) and California State University (CSU), as a United Nations Development Programme (UNDP) fellow. Notably, she has organized national and international conferences, including the APCWE 2013. Her extensive contributions to the field include involvement in over 98 projects, the authorship of more than 130 research articles published in highly esteemed journals and conferences, research advisor for many scholars and a pivotal role in shaping the development of the Indian Wind Engineering code (IS 875). Dr. Selvirajan has garnered recognition for her exceptional work, receiving prestigious awards such as the CSIR–Technology Shield in the year 2000 and the A.S. Arya – University of Roorkee Disaster Prevention Award in 2000, specifically for her contributions to cyclone shelter and disaster mitigation. Additionally, she was honored with a UNDP fellowship during the period 1992 – 1993, among other accolades.
Er Dr Abhay Gupta is currently Director Skeleton consultants pvt ltd based at Noida, providing structural engineering consultancy to buildings, industries and special structure.Dr. Abhay Gupta was the Vice President of ISWE and the national executive committee member of Indian Geotechnical Society (IGS) and currently a GC Member in IAStructE & a referee for IRC journals for bridge engineering division. He is a Fellow of the Institution of Engineers (India), Indian Association of Structural Engineers and a Life Member of Indian Geotechnical Society, Indian Society of Wind Engineering, Indian Roads Congress, Indian Society of Earthquake Technology and associated with several other professional bodies. Dr. Gupta was a member of BIS subcommittee CED43 (for Foundations of Buildings) and currently representing in CED57 (Cyclone Resistant Housing)& CED46 (Steel Structures). Dr. Abhay Gupta has obtained his BE (Civil) in 1981 and subsequently ME (Structures) from SGSITS Indore; and Ph.D. from the University of Roorkee, Roorkee (now Indian Institute of Technology (IIT) Roorkee) in the area of “Aerodynamic Interference in Tall Rectangular Buildings: Wind Tunnel Studies” in 1996. His areas of research interests include the design of structures in Reinforced Cement Concrete (RCC) and steel, design for dynamic effects, codes of practices in wind and earthquake engineering, bridge engineering; and soil-structure interaction. He has also worked with the IIT Roorkee team under Prof. Prem Krishna for the preparation of the revised draft of IS 875: part3. He was one of the invited experts for Wind Tunnel Testing and investigation for 130m, 160m & 205m tall buildings proposed/constructed at Kolkata, Noida and Mumbai respectively, done at IIT Roorkee.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ‘consumer’ is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
In order to exercise your revocation right, you must inform us (Moluna GmbH, Münsterstr. 105, 48268 Greven, Telephone number: 02571/5 69 89 33, Fax number: 02571/5 69 89 30, E-Mail address: abe@moluna.de) of your decision to revoke this contract by means of a clear declaration (e.g. a letter sent via post, fax or email). You can use the enclosed specimen revocation form for this, which however is not mandatory.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts.
The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To Moluna GmbH, Engberdingdamm 27, 48268 Greven, Fax number: 02571/5 69 89 30, Email address: abe@moluna.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.42 | £ 42.42 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.