Recent Advances in Mechanical Engineering
Book 179 of 268: Lecture Notes in Mechanical EngineeringNew - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Discusses emerging techniques in additive manufacturing and their applicationsPresents latest advances in MEMS and NEMSOffers solutions to contemporary problems in waste management and disposalProf. K.M. Pandey obtained B.
Seller Inventory # 540234365
This book presents the select proceedings of the International Conference on Recent Advancements in Mechanical Engineering (ICRAME 2020). It provides a comprehensive overview of the various technical challenges faced, their systematic investigation, contemporary developments, and future perspectives in the domain of mechanical engineering. The book covers a wide array of topics including fluid flow techniques, compressible flows, waste management and waste disposal, bio-fuels, renewable energy, cryogenic applications, computing in applied mechanics, product design, dynamics and control of structures, fracture and failure mechanics, solid mechanics, finite element analysis, tribology, nano-mechanics and MEMS, robotics, supply chain management and logistics, intelligent manufacturing system, rapid prototyping and reverse engineering, quality control and reliability, conventional and non-conventional machining, and ergonomics. This book can be useful for students and researchers interested in mechanical engineering and its allied fields.
Prof. K.M. Pandey obtained B.Tech in Mechanical Engineering from BHUIT, Varanasi now known as IIT BHU in 1980. Dr. Pandey also did M.Tech in Heat Power from the same institute in 1987. Prior to joining REC Silchar, Dr. Pandey served in BIT Mesra, Ranchi, as associate lecturer for a period of 3 years and 6 months. Dr. Pandey did his PhD in mechanical engineering in 1994 from IIT Kanpur. He has published and presented more than 325 papers in international and national journals and conferences. Dr. Pandey has also served in Colombo Plan Staff College Manila, Philippines, in the year 2002 as faculty consultant seconded by Government of India. Currently, he is working as professor in department of mechanical engineering of National Institute of Technology, Silchar, Assam, India. He has also served the department in the capacity of head for two terms of 3 years. He has also served as member of Board of Governors of BIT Silchar for two terms. His research interest areas are combustion, high speed flows, technical education, heat transfer, internal combustion engines, human resource management, gas dynamics and numerical simulations in CFD area from commercial softwares. Dr. Pandey has got more than 70 SCI-indexed journal papers and more than 150 research articles are indexed in Scopus. His h-index in Scopus is 17; and 23 in google scholar. He has guided 14 students for PhD and 89 students for M.Tech so far.
Prof. R.D. Misra received his B.E. in Mechanical Engineering from Jorhat Engineering College under Dibrugarh University in 1991, M.Tech. in Energy Studies from Indian Institute of Technology Delhi in 1996, and Ph. D. in Thermal Engineering from Indian Institute of Technology Roorkee in 2004. He has joined as faculty in Mechanical Engineering in the National Institute of Technology Silchar in 1992. He has served NIT Silchar as Lecturer from 1992 to 2003, as Assistant /Associate Professor from 2004 to 2009, as Professor from 2010 to 2018and as Professor (HAG) from 2018 till date. He has published around 40 papers in referred international journals. Presently He is a professional member (life) of the Indian Society for Technical Education and The Institute of Engineers (Fellow).
Prof. P.K. Patowari is currently a professor at the Department of Mechanical Engineering, National Institute of Technology Silchar, Assam. He obtained his B.Tech degree (Mechanical) from NERIST, Itanagar, and M.E. (Prod.) from Jadavpur University, Kolkata, and Ph.D. from the Indian Institute of Technology, Kharagpur. His major areas of research interests include Advanced/Non-traditional Manufacturing Processes Micro-Manufacturing, Computer Aided Manufacturing (CAM), Computer Numerical Control (CNC), Micro Electro Mechanical Systems (MEMS). He has published more than 30 papers in referred international journals. Currently, he is the life member of professional bodies like Indian Society for Technical Education (ISTE) and Institute of Smart Structures and Systems (ISSS) and The Institute of Engineers (Fellow).
Prof. Uday Shanker Dixit received his bachelor’s degree in mechanical engineering from the erstwhile University of Roorkee (now Indian Institute of Technology (IIT) Roorkee) in 1987, his M.Tech degree in mechanical engineering from IIT Kanpur in 1993, and his PhD in mechanical engineering from IIT Kanpur in 1998. He has worked in two industries―HMT, Pinjore, and INDOMAG Steel Technology, New Delhi, where his main responsibility was designing various machines. Dr Dixit joined the Department of Mechanical Engineering, IIT Guwahati, in 1998, where he is currently a professor. He was also the Officiating Director of the Central Institute of Technology, Kokrajhar (February 2014-May 2015). Dr Dixit has been actively engaged in research in various areas of design and manufacturing over the last twenty-five years. He has authored/co-authored 115 journal papers, 109 conference papers, twenty-seven book chapters, and six books on mechanical engineering. He has also co-edited seven books related to manufacturing. He has guest-edited eleven special issues of journals. Presently he is an Associate Editor of the Journal of Institution of Engineers (India), Series C, and the Regional Editor (Asia) of the International Journal of Mechatronics and Manufacturing Systems. He has guided twelve doctoral and forty-four masters’ students. Dr Dixit has investigated a number of sponsored projects and developed several courses. Presently, he is the Vice-President of the AIMTDR conference
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 41.97 | £ 41.97 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.