Recent Advances in Materials, Mechanics and Structures
Book 238 of 362: Lecture Notes in Civil EngineeringNew - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. The book presents the select proceedings of the second International Conference on Materials, Mechanics and Structures (ICMMS 2022). The book highlights the latest developments, innovations and applications in the diverse range of areas of civil engineer.
Seller Inventory # 585942637
The book presents the select proceedings of the second International Conference on Materials, Mechanics and Structures (ICMMS 2022). The book highlights the latest developments, innovations and applications in the diverse range of areas of civil engineering. It covers the findings of recent research works across the globe on various topics such as civil engineering materials; concrete and masonry structures; composite structures; structural mechanics; fluid-structure interaction; repair, rehabilitation and retrofitting of the structures; new technologies in structural design and construction; bridge engineering, structural dynamics, earthquake engineering, etc. This book will be useful for beginners, researchers and professionals working in the different areas of civil engineering.
Dr. Suman Saha is currently an assistant professor at the Department of Civil Engineering, National Institute of Technology Calicut, Kerala, INDIA. He obtained his B.E. in Civil Engineering from Jadavpur University, Kolkata; M.Tech. in Construction Technology and Management and Ph.D. from the National Institute of Technology Karnataka, Surathkal. His major areas of research interests include the alternative construction materials towards sustainability, advancement in concrete technology, etc. Association of Consulting Civil Engineers (ACCE) awarded his PG thesis the ACCE- NIRMANA NIRVAHANE PURASKARA – 2015 for best dissertation in M.E/M. Tech. He has published 8 papers in peer-reviewed journals, 4 book chapters and presented his research work several times in the national/international conferences. He delivered several keynote lectures in various national/international events.
Dr. Sajith A S is currently an associate professor at the Department of Civil Engineering, National Institute of Technology Calicut, Kerala, INDIA. He obtained his B.Tech. in Civil Engineering from College of Engineering, Trivandrum; M.E. in Structural Engineering from PSG College of Technology, Coimbatore and Ph.D. from the National Institute of Technology Calicut, Kerala. His major areas of research interests include vibration control, structural dynamics and earthquake engineering. He has published 18 papers in peer-reviewed journals and 17 papers in reputed national/international conferences. He is an active reviewer of various reputed journals and national/international conferences. He served as editor for the Proceedings of SECON'19 - Structural Engineering and Construction Management" published by Springer, and proceedings of International Conference on Materials, Mechanics and Structures 2020 (ICMMS2020) published by IOP Conference Series: Materials Science and Engineering. Dr. Dipti Ranjan Sahoo is presently working as Professor atthe Department of Civil Engineering, Indian Institute of Technology Delhi, INDIA. He obtained his B.Eng. in Civil Engineering from IGIT, Utkal University; M.Tech. in Structural Engineering and Ph.D. from the Indian Institute of Technology Kanpur, India. His major areas of research interests include hybrid testing and simulation, performance-based seismic design, passive vibration control devices, nonlinear finite element modelling of structures, seismic retrofitting and strengthening, RC and steel structures etc. He has published 86 journal papers, 92 conference papers and 13 book chapters. He applied for several patents. He was appointed as Honorary Associate Professor in University of Queensland, Australia; Associate Editor, Indian Society of Earthquake Technology (ISET) Journal, Roorkee; and as Guest Editor, Indian Concrete Journal. He received so many prestigious awards such as Fellow of The Institution of Engineers (India); outstanding reviewer awards from Elsevier journals; Young Associates (2012), Indian National Academy of Engineering (INAE), India; Young Engineers Award (2012), Indian National Academy of Engineering, India; Young Associates (2012), Indian National Academy of Engineering (INAE), India; Young Engineers Award (2012), Indian National Academy of Engineering, India etc. He serves as editorial board member in Structural Engineering Digest (SED) Journal, Journal of Civil Engineering & Construction Technology, and Indian Concrete Journal (ICJ).Dr. Pradip Sarkar is presently working as Professor at the Department of Civil Engineering, National Institute of Technology Rourkela, INDIA. He obtained his B.E. in Civil Engineering and M.E. in Engineering Mechanics from Bengal Engineering and Science University, Shibpur, India (presently known as IIEST Shibpur) and Ph.D. from the Indian Institute of Technology Madras, India. His major areas of research interests include earthquake analysis and design of structures, structural properties of building materials. He has published 38 journal papers, 48 conference papers and 9 book chapters. Best teacher award at NIT Rourkela (2018-19), GC Mitra Memorial Gold Medal (2002), University Silver Medal (2002) were awarded to him for his extraordinary achievements in academics. He is an active reviewer of various reputed journals and the national/international conferences.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 41.88 | £ 41.88 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.