Recent Advancements in Sustainable and Safe Transportation Infrastructure - Vol. 1
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt.
Seller Inventory # 2027923803
This book presents select proceedings of the 10th Conference on Transportation Systems Engineering and Management (CTSEM 2024). It focuses primarily on transport planning, traffic engineering, pavement technology, and sustainable construction practices. It sheds light on cutting-edge research in intelligent transportation systems like Internet of Things (IoT) devices, smart data collection techniques, smart city applications, connected vehicles and autonomous vehicles. The book also delves into the use of waste and recyclable materials and suitable design formulations for the development of resilient and sustainable infrastructure. This book is a valuable reference for researchers and professionals interested in transportation systems engineering and allied fields.
Dr. Srinivasan V is an Assistant Professor in the Department of Civil Engineering at Visvesvaraya National Institute of Technology (VNIT), Nagpur. He obtained his Master’s and Doctorate degrees from the Indian Institute of Technology (IIT), Kanpur. He is the recipient of IITK Excellence in Leadership in Students’ Affairs and has been nominated for Shanker Dayal Sharma Gold Medal for best outgoing PG student. His research areas are infrastructure geotechnics, mining geotechnics, and forensic geotechnics. He has contributed 18 peer-reviewed articles in journals of international repute and 10 articles in prestigious conferences indexed in SCI/Scopus. He has also received a research grant of Rs. 133 Lakhs from Coal India Limited (CIL). He is actively engaged in teaching, research and industrial consultancy in geotechnical engineering, engineering geosciences and concreting and pavement materials. He is a reviewer for reputed journals like the International Journal of Civil Engineering, Arabian Journal of Geosciences, Indian Geotechnical Journal, and International Journal of Geosynthetics and Ground Engineering among others. He is also a lifetime member of the Indian Geotechnical Society, Institute of Engineers (India), Indian Concrete Institute and the Indian Road Congress.
Dr. Udit Jain is an Assistant Professor at VNIT, Nagpur. He received his Ph.D. in Transportation Engineering from IIT, Roorkee. The work carried out by him on pedestrian crosswalks has been incorporated into the Indo-HCM (2017) and IRC:103 (2022). He earned his master's degree from the School of Planning and Architecture, New Delhi and was the Gold Medalist in Transport Planning. He is a certified road safety auditor and has completed international and national certification courses in road safety from Delft, Netherlands, and IIT, Roorkee. He has carried out several road safety audit projects in the states of Punjab and Maharashtra. He has organized several 15-day road safety auditor certification courses at VNIT, Nagpur in association with the Indian Roads Congress and the Ministry of Road Transport and Highways (Government of India). He is an active contributor to peer-reviewed journals and has showcased his research at several national and international conferences. His research interests are in the fields of road safety, pedestrian facility planning, intersection design, integration of transportation modes, and intelligent transportation systems.
Prof. M.V.L.R. Anjaneyulu is a Professor (HAG) in the Department of Civil Engineering at NIT, Calicut. He completed his Doctorate in Civil Engineering from the University of Calicut and his Masters degree in Transportation Engineering from Regional Engineering College, Warangal. He has more than 33 years of teaching and research experience in Transportation Engineering. His areas of research interest include urban transportation planning, travel behaviour studies, traffic flow analysis and modelling, traffic safety analysis and evaluation, and applications of Geographic Information System (GIS) in transportation. He has guided eleven Ph.D. works and is presently guiding four Ph.D. scholars. He has also guided nearly 170 postgraduate dissertation works and is presently guiding two PG dissertation works. He has published more than one hundred eighty research papers in various journals and conferences. He was awarded the IRC Best Research Paper award in 1998 and 2014. He is a member of various professional bodies. He has successfully completed six research projects sponsored by various agencies like Natural Resources Data Management System (NRDMS), Kerala State Council for Science, Technology & Environment (KSCSTE), Ministry of Urban Development (MOUD), Ministry of Education, and Coir Board. He is the Coordinator of State Technical Agency for scrutiny of proposals under PMGSY scheme for seven northern districts of Kerala.
Prof. Manoranjan Parida, took over the charge of Director, CSIR-Central Road Research Institute on September 20, 2022. He previously was Deputy Director at IIT, Roorkee. He was MoRTH Chair Professor on the Development of Highway System in India at IIT, Roorkee during 2013-2017. He has worked on an Imprint Research Project, ‘Propagation and Mitigation Model of Mixed Traffic Noise for Planning Mid-Sized Indian Cities.’ The design and development of a noise barrier for Flyovers in Delhi is one of his innovative contributions. He has provided substantial inputs for a third-party quality audit of 1,700 kms of State Highway in the State of Bihar, during 2007-2013, under the RSVY Project. He has provided consultancy for more than 350 urban road infrastructure projects, intercity corridors, rural roads, and expressways. He received Pt. Jawaharlal Nehru Birth Centenary Award in the year 2004 from Indian Road Congress. He has received the Outstanding Teacher Award from IIT Roorkee. He is presently Convener of the Urban Roads & Streets Committee(H-8) of the Indian Roads Congress, New Delhi.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.49 | £ 42.49 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.