Prospects of Hydrogen Fueled Power Generation
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Dr. Anoop Kumar Shukla is presently working as an assistant professor in the Department of Mechanical Engineering at Amity University Noida, India. He completed his M.Tech. with distinction from Harcourt Butler Technological Institute (H.
Seller Inventory # 945587694
Prospects of Hydrogen-fueled Power Generation brings together experts to explore the various challenges and opportunities of hydrogen as a fuel in power generation, transportation, storage, and safety. Special interest is given to proton exchange membrane fuel cell (PEMFC) fuel cells, hydrogen energy, and the conversion methods. The usage of clean fuel in road transportation, marine transportation, and the power generation sector are also discussed in detail. Additionally, performance investigations reveal information about the system's energy and exergy analysis.
Hydrogen-fueled power generation is the process of generating electricity using hydrogen as the primary fuel source. This process typically involves the conversion of hydrogen into electricity using fuel cells or combustion engines. Fuel cells are electrochemical devices that convert hydrogen into electricity and water with no emissions other than water vapor. Combustion engines, on the other hand, burn hydrogen to produce heat, which is used to generate electricity through a turbine. The byproducts of hydrogen combustion are water and heat, with no harmful emissions. One advantage of hydrogen-fueled power generation is that it produces no harmful emissions, making it a clean and sustainable source of energy. Additionally, hydrogen is a highly abundant element that can be produced from a variety of sources, including natural gas, biomass, and renewable energy sources like solar and wind power.
Dr. Anoop Kumar Shukla is presently working as an assistant professor in the Department of Mechanical Engineering at Amity University Noida, India. He completed his M.Tech. with distinction from Harcourt Butler Technological Institute (HBTI) Kanpur. Dr. Shukla earned his Ph.D. from Dr. APJ Abdul Kalam Technical University Lucknow in 2017. His area of research is energy conversion and thermal management, combined power cycles, cogeneration, multigeneration, biofuels, and gas turbine cooling. He has published two edited books and more than 54 SCI/Scopus indexed journal and conference publications. He has guided one Ph.D. and more than twenty projects/dissertations at the UG/PG level. Currently, he is guiding three Ph.D. and two M.Tech. students. He has also authored book chapters with highly acclaimed publishers, including Springer and Material Research Forum. Dr. Shukla has organized several international conferences and symposiums. He is an active reviewer for various highly reputed international journals, including Applied Thermal Engineering, Sustainable Energy Technologies, and Assessments, Applied Sciences, Energy, International Journal of Green Energy, Sustainability, Desalination, Journal of Power and Energy, Thermal Science and Engineering Progress, and Energies.
Professor Onkar Singh, currently the Vice Chancellor of Veer Madho Singh Bhandari Uttarakhand Technical University, Dehradun is a Professor of Mechanical Engineering at Harcourt Butler Technical University (Formerly HBTI), Kanpur since January 2007. Dr. Singh was also founding Vice Chancellor of Madan Mohan Malaviya University of Technology, Gorakhpur and Vice Chancellor of Uttar Pradesh Technical University, Lucknow. Dr. Singh has authored 11 books and 11 chapters in different books. He has published 231 papers in international/national journals and conferences and 117 popular articles. Dr. Singh has guided 14 Ph.D. and 27 PG dissertations, held 3 patents, and completed 7 research projects. He holds the National Records-LIMCA Book of Records, March 2014 & LIMCA Book of Records, February 2015. Dr. Singh is Fellow and member of number of international and national professional societies of repute.
Professor Ali J. Chamkha is currently associated as the Dean of Engineering and in charge of all academic and research affairs at Kuwait College of Science and Technology. He has extensive research experience and authored and co-authored more than 750 peer-reviewed journal and conference publications. He is editor in chief for the Journal of Nanofluids. He also serves as Associate Editor for several journals of high repute, such as ASME Journal of Thermal Science and Engineering Applications, International Journal of Numerical Methods for Heat and Fluid Flow, Journal of Porous Media, Scientia Iranica. Professor Chamkha is the Trainer for Engineering and Management Courses such as leadership skills, soft skills, six sigma, internal auditing, ISO certification, quality control, strategic planning, project and operations management, total quality management, effective presentations and time management skills, seven habits of highly effective people, valves and pumps technology, filtration technology and others. He has received more than 12 achievement awards for outstanding teaching and research from the local, regional and international levels. Professor Chamkha also provides consultancy to various industries such as filtration, water, oil and gas, HSE, environment, quality management, and auditing.
Dr. Meeta Sharma is working as an Associate Professor in the Mechanical Engineering Department, Amity University, Noida. She completed her B.Tech. and M.Tech. from Aligarh Muslim University, Aligarh, India and her Ph.D. from Dr. A.P.J Abdul Kalam Technical University, Lucknow, India. She has around 18 years of teaching experience and has published good research papers in reputed journals such as Applied Thermal Engineering, Heat Transfer – Asian Research, Journal of Thermal Engineering, Energy Sources and many more. Dr. Sharma has reviewed many research papers for reputed journals such as Applied Thermal Engineering, Heat Transfer – Asian Research, Journal of Thermal Engineering, Energy Sources, Energy Report and Journal of Power and Energy, Part A of the Proceedings of the Institution of Mechanical Engineers. She has contributed to many book chapters and participated in international Scopus conferences. Her areas of interest include combined cycle power plants, cogeneration plants, waste heat recovery systems, solar energy, heat transfer and applied thermodynamics. Currently, Dr. Sharma is guiding two Ph.D. and 3 M.Tech. dissertations and one B.Tech. project as research assignments. She has guided 12 M.Tech. dissertations and many B.Tech. projects. She is a member of the Institution of Engineers.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.21 | £ 42.21 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.