Project Management: Processes, Methodologies, and Economics
Avraham Shtub (u. a.)
Sold by preigu, Osnabrück, Germany
AbeBooks Seller since 5 August 2024
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: 5 available
Add to basketSold by preigu, Osnabrück, Germany
AbeBooks Seller since 5 August 2024
Condition: New
Quantity: 5 available
Add to basketProject Management: Processes, Methodologies, and Economics | Avraham Shtub (u. a.) | Taschenbuch | 608 S. | Englisch | 2013 | Pearson | EAN 9781292039404 | Verantwortliche Person für die EU: Pearson Studium im Verlag Pearson Benelux B.V. Zweigniederla, Sankt-Martin-Str. 82, 81541 München, buchhandel[at]pearson[dot]com | Anbieter: preigu Print on Demand.
Seller Inventory # 134597701
For senior undergraduate courses and first year graduate courses in Project Management found in engineering and business departments.
Centering on theory and practice, this text presents tools and techniques most suited for modern project management. The authors show the relationship between project planning and implementation, from budgeting to scheduling and control. Intended for undergraduate and graduate students in engineering or business, this text is also a thorough reference for practitioners, managers, engineers and technology experts.
Avraham Shtub is the Sharon and Stephen Seiden Professor of Project Management in the School of Industrial Engineering and Management at the Technion―Israel Institute of Technology. He received the Ph.D. degree in management science and industrial engineering from the University of Washington, the M.B.A. degree from Tel Aviv University, and the B.Sc. degree in electrical engineering from the Technion. He is a senior member of the Institute of Industrial Engineers and is certified as a Project Management Professional by the Project Management Institute. Professor Shtub’s research focuses on the design and management of manufacturing systems, project management, and learning and forgetting. He is on the editorial boards of IIE Transactions and the International Journal of Production Research, and has previously served on the editorial boards of the Project Management Journal and the International Journal of Project Management.
Jonathan F. Bard is a professor of operations research and industrial engineering in the Mechanical Engineering Department at the University of Texas at Austin. He holds the Industrial Properties Corporation Endowed Faculty Fellowship, and serves as the Associate Director of the Center for the Management of Operations and Logistics. He received the D.Sc. degree in operations research from the George Washington University, the M.S. degree in aeronautics and astronautics from Stanford University, and the B.S. degree in aeronautical engineering from Rensselaer Polytechnic Institute. Professor Bard’s research interests are in the design and analysis of manufacturing systems, personnel scheduling, R&D project management, and vehicle routing. Prior to beginning his academic career, he worked as a program manager for the Aerospace Corporation and as a systems engineer for Booz, Allen & Hamilton. He is currently the editor of IIE Transactions on Operations Engineering and serves on the editorial board of several other journals. He is a Fellow of IIE and a Senior Member of IEEE and INFORMS.
Shlomo Globerson is a professor in the School of Business Administration at Tel Aviv University. He received the Ph.D. degree in industrial engineering from the University of California, Berkeley, the M.S. degree in industrial engineering from the Faculty of Industrial Engineering and Management at the Technion―Israel Institute of Technology, and the B.Sc. degree in mechanical engineering from the Technion. His primary research and teaching activities center on project management and operations management. He has published seven books and over 80 articles. Professor Globerson is the former President of the Israeli chapter of the Project Management Institute and currently serves on the advisory board for the Industrial Engineering Handbook. He is also on the editorial boards of the Journal of Operations Management and the International Journal of Project Management.
"About this title" may belong to another edition of this title.
Standard Business Terms and customer information
I. Standard business terms
§ 1 Basic provisions
(1) The following terms and conditions of business apply for all contracts concluded with us as the supplier (preigu GmbH & Co. KG) via the websites AbeBooks and/or ZVAB. Unless otherwise agreed, the inclusion of your own terms and conditions is explicitly rejected.
(2) A ?consumer' in the sense of the following regulations is every natural person who concludes a legal transaction which, to an overwh...
Instructions for revocation
Right of withdrawal for the sale of goods
Revocation right for consumers
(A ‘consumer' is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within 14 days without specifying any reasons.
The revocation period is 14 days with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
To exercise your right of withdrawal, you must inform us (preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, Telephone number: +49 (0) 541 / 580 72 84, E-Mail address: mail@preigu.de) by means of a clear declaration (e.g. a letter sent by post, or an e-mail) of your decision to withdraw from this contract. You can use the attached model withdrawal form for this purpose, which is, however, not mandatory.
You can also exercise your right of withdrawal online by clicking on a button labelled accordingly (such as ‘Withdraw from contract' or similar) on the AbeBooks/ZVAB website. If you use this online function, you will immediately receive a confirmation of receipt on a durable medium (e.g. via email) containing information on the content of the withdrawal notice, as well as the date and time of its receipt.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts. The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, Email address: mail@preigu.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
| Order quantity | 60 to 60 business days | 60 to 60 business days |
|---|---|---|
| First item | £ 60.20 | £ 60.20 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.