The Project Finance Handbook : Structuring, Sizing and Underwriting Infrastructure Deals - Two Deals Modeled End to End, With the Models Supplied
Language: English
Published by Amazon Digital Services LLC - Kdp Sep 2026, 2026
- Softcover
- New

Seller: AHA-BUCH GmbH, Einbeck, GermanyAHA-BUCH GmbH
AbeBooks seller since August 14, 2006
Condition: New
£ 43.35
Quantity: 2 available
Add to basketItem description from seller
Neuware - The cover test allowed 538.1 million dollars. The cost test allowed 427.3. The lender advanced the lower one, and the ratio the sponsor fought for never bound.Project finance is lending against a cash flow rather than a balance sheet: if the asset earns less than expected, the lender takes the loss. This book works through everything that follows from that fact on two transactions built in full. Northgate is a 96 megawatt data center let for fifteen years to an investment-grade tenant, costing 614.4 million dollars to build and 657.4 to fund. Aurora is a 220 megawatt solar plant with eighty megawatts of battery storage, contracted for fifteen years and merchant for ten more. One works. The other does not, and the book shows why.Who this book is for- Analysts and associates who build the cash flow and write the credit paper- Fund managers deciding whether the return pays for the risk- Developers, lawyers and asset managers who live under the covenantsWhat you will be able to do- Define CFADS and see who controls its definition- Size debt on cover and on cost, and know which test binds- Sculpt repayment and handle the balloon at maturity- Solve the funding loop without a circular reference- Turn covenants, lock-up and cash sweep into dollars of rent- Run sensitivities that stress the loan instead of re-sizing itComputed, never assertedNorthgate's real minimum cover is 1.826 times, not the 1.45 agreed. It returns 16.60 percent to equity, of which only 2.41 points come from exit yield compression. A twenty percent construction overrun costs 5.24 points; a 375 basis point rise in the swap rate costs 3.17. Aurora, unsubsidized, returns 0.13 percent to equity and needs 105.14 dollars per megawatt-hour to reach ten percent; with a thirty percent investment tax credit, 67.31.Tools includedSixteen chapters and seven appendices: both deals computed in full, an annotated term sheet, a diligence checklist, a checklist for auditing a model, twenty interview questions with answers, and a glossary. Two Excel workbooks, the files every figure came from, each with a checks sheet, unlocked and identical in Excel, LibreOffice and Google Sheets. The chapter on building a model that survives scrutiny names the eight errors the author's own files were caught making before publication. Download details are inside the book.Part of The Institutional Finance Handbooks.Educational content. Both deals are illustrative; not investment, legal or tax advice.…
Seller Inventory # 9798172721380
- Title
- The Project Finance Handbook : Structuring, Sizing and Underwriting Infrastructure Deals - Two Deals Modeled End to End, With the Models Supplied
- Author
- Julian R Sterling
- Publisher
- Amazon Digital Services LLC - Kdp Sep 2026
- Publication year
- 2026
- Condition
- Neu
- Binding
- Taschenbuch
- Language
- English
- ISBN 13
- 9798172721380
- Item weight
- 390 grams
- Dimensions
- 229x152x15 mm
- Series
- Book 11 of 25: The Institutional Finance Handbooks
The cover test allowed 538.1 million dollars. The cost test allowed 427.3. The lender advanced the lower one, and the ratio the sponsor fought for never bound.
Project finance is lending against a cash flow rather than a balance sheet: if the asset earns less than expected, the lender takes the loss. This book works through everything that follows from that fact on two transactions built in full. Northgate is a 96 megawatt data center let for fifteen years to an investment-grade tenant, costing 614.4 million dollars to build and 657.4 to fund. Aurora is a 220 megawatt solar plant with eighty megawatts of battery storage, contracted for fifteen years and merchant for ten more. One works. The other does not, and the book shows why.
Who this book is for
- Analysts and associates who build the cash flow and write the credit paper
- Fund managers deciding whether the return pays for the risk
- Developers, lawyers and asset managers who live under the covenants
What you will be able to do
- Define CFADS and see who controls its definition
- Size debt on cover and on cost, and know which test binds
- Sculpt repayment and handle the balloon at maturity
- Solve the funding loop without a circular reference
- Turn covenants, lock-up and cash sweep into dollars of rent
- Run sensitivities that stress the loan instead of re-sizing it
Computed, never asserted
Northgate's real minimum cover is 1.826 times, not the 1.45 agreed. It returns 16.60 percent to equity, of which only 2.41 points come from exit yield compression. A twenty percent construction overrun costs 5.24 points; a 375 basis point rise in the swap rate costs 3.17. Aurora, unsubsidized, returns 0.13 percent to equity and needs 105.14 dollars per megawatt-hour to reach ten percent; with a thirty percent investment tax credit, 67.31.
Tools included
Sixteen chapters and seven appendices: both deals computed in full, an annotated term sheet, a diligence checklist, a checklist for auditing a model, twenty interview questions with answers, and a glossary. Two Excel workbooks, the files every figure came from, each with a checks sheet, unlocked and identical in Excel, LibreOffice and Google Sheets. The chapter on building a model that survives scrutiny names the eight errors the author's own files were caught making before publication. Download details are inside the book.
Part of The Institutional Finance Handbooks.
Educational content. Both deals are illustrative; not investment, legal or tax advice.
"Synopsis" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 7 to 10 business days | 5 to 7 business days |
|---|---|---|
| First item | £ 29.30 | £ 37.67 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Das Unternehmen AHA-BUCH GmbH: Seit der Gründung von AHA-BUCH im Juli 2005 ist unser Hauptziel, zufriedenen Kunden so schnell und so preisgünstig wie möglich ihren Bücherwunsch zu erfüllen. Unsere Firma beschäftigt 16 Mitarbeiter, die nur ein Ziel kennen: den Kunden und seine Wünsche! Auf über 3700 m2 Fläche haben wir über 100.000 Bücher, Modernes Antiquariat und Spiele auf Lager.
Specialty
Kinderbücher & Kinderhör Casetten, German Books, Software, Natur & Tiere, Ratgeber, Sachbücher, Englische Bücher, Medizin & Gesundheit, Universität & StudiumSeller's business information
AHA-BUCH GmbH
Garlebsen 48
Einbeck, Germany 37574
Terms of sale
Imprint
Seller Info:
AHA-BUCH GmbH
represented by the managing director Christel Glass
Garlebsen 48
37574 Einbeck
Deutschland
Telefon: 055639996039
Telefax: 055639995974
E-Mail: abebooks@aha-buch.de
USt-IdNr.: DE261904229
registered at Commercial register Amtsgerichtes Göttingen
Handelsregisternummer HRB 200691
Alternative dispute resolution:
The European Commission provides a platform for out-of-court online dispute resolution (ODR platform), which can be accessed under https://ec.europa.eu/odr.
We have been a member of the "FairCommerce" initiative since 25.05.2018.
For more information, see www.fair-commerce.de.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to AHA-BUCH GmbH, Einbeck, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
We ship your order after we received them
for articles on hand latest 24 hours,
for articles with overnight supply latest 48 hours.
In case we need to order an article from our supplier our dispatch time depends on the reception date of the articles, but the articles will be shipped on the same day.
Our goal is to send the ordered articles in the fastest, but also most efficient and secure way to our customers.