Programming for Hybrid Multi/Manycore MPP Systems
Language: English
Published by CRC Press, 2020
Series: Book 23 of 27 - Chapman & Hall/CRC Computational Science
- Softcover
- New

Seller: moluna, Greven, Germanymoluna
AbeBooks seller since July 9, 2020
Condition: New
£ 47.31
Quantity: Over 20 available
Add to basketSeller Inventory # 594590018
- Title
- Programming for Hybrid Multi/Manycore MPP Systems
- Author
- John Levesque|Aaron Vose
- Publisher
- CRC Press
- Publication year
- 2020
- Condition
- New
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 0367572907
- ISBN 13
- 9780367572907
- Series
- Book 23 of 27: Chapman & Hall/CRC Computational Science
"Ask not what your compiler can do for you, ask what you can do for your compiler."
--John Levesque, Director of Cray’s Supercomputing Centers of Excellence
The next decade of computationally intense computing lies with more powerful multi/manycore nodes where processors share a large memory space. These nodes will be the building block for systems that range from a single node workstation up to systems approaching the exaflop regime. The node itself will consist of 10’s to 100’s of MIMD (multiple instruction, multiple data) processing units with SIMD (single instruction, multiple data) parallel instructions. Since a standard, affordable memory architecture will not be able to supply the bandwidth required by these cores, new memory organizations will be introduced. These new node architectures will represent a significant challenge to application developers.
Programming for Hybrid Multi/Manycore MPP Systems attempts to briefly describe the current state-of-the-art in programming these systems, and proposes an approach for developing a performance-portable application that can effectively utilize all of these systems from a single application. The book starts with a strategy for optimizing an application for multi/manycore architectures. It then looks at the three typical architectures, covering their advantages and disadvantages.
The next section of the book explores the other important component of the target―the compiler. The compiler will ultimately convert the input language to executable code on the target, and the book explores how to make the compiler do what we want. The book then talks about gathering runtime statistics from running the application on the important problem sets previously discussed.
How best to utilize available memory bandwidth and virtualization is covered next, along with hybridization of a program. The last part of the book includes several major applications, and examines future hardware advancements and how the application developer may prepare for those advancements.
"Synopsis" may belong to another edition of this title.
About the Author
John Levesque works in the Chief Technology Office at Cray Inc. where he is responsible for application performance on Cray’s HPC systems. He is also the director of Crays Supercomputing Center of Excellence for the Trinity System installed the end of 2016 at Los Alamos Scientific Laboratory. Prior to Trinity, he was director of the Center of Excellence at the Oak Ridge National Laboratory (ORNL). ORNL installed a 27 Petaflop Cray XK6 system, Titan which was the fastest computer in the world according to the Top500 list in 2012; and a 2.7 Petaflop Cray XT4, Jaguar which was number one in 2009. For the past 50 years, Mr. Levesque has optimized scientific application programs for successful HPC systems. He is an expert in application tuning and compiler analysis of scientific applications. He has written two previous books, on optimization for the Cray 1 in 1989 [20] and on optimization for multi-core MPP systems in 2010 [19].
Aaron Vose is an HPC software engineer who spent two years at Cray’s Supercomputing Center of Excellence at Oak Ridge National Laboratory. Aaron helped domain scientists at ORNL port and optimize scientific software to achieve maximum scalability and performance on world-class, highperformance computing resources, such as the Titan supercomputer. Aaron now works for Cray Inc. as a software engineer helping R&D to design nextgeneration computer systems. Prior to joining Cray, Aaron spent time at the National Institute for Computational Sciences (NICS) as well as the Joint Institute for Computational Sciences (JICS). There, he worked on scaling and porting bioinformatics software to the Kraken supercomputer. Aaron holds a Master’s degree in Computer Science from the University of Tennessee at Knoxville.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.01 | £ 42.01 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Online Handel nur mit Neubüchern
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
About Us
Legal website operator identification:
Moluna GmbH
Represented by the general manager Helge Blischke
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
Telefax: 02571/5698930
E-Mail: abe@moluna.de
VAT No.: DE296281834
listed in the commercial register of the local court Steinfurt
Commercial register number - Part B of the commercial register - 10553
We are a member of the initiative „FairCommerce“ since 24.07.2015.
For more information, see: www.haendlerbund.de/faircommerce.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.