Proceedings of the Second International Conference on Press-in Engineering 2021, Kochi, Japan
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDr. Tatsunori MATSUMOTO obtained his Bachelor of Engineering and Master of Science from Kanazawa University, Japan. He joined the Department of Civil Engineering of Kanazawa University in 1981 as research associate. He received the degre.
Seller Inventory # 595275100
The Second International Conference on Press-in Engineering (ICPE) 2021 was organized by the International Press-in Association (IPA). The conference is held every three years and the main theme this time is "Evolution and Social Contribution of Press-in Engineering for Infrastructure Development, and Disaster Prevention and Mitigation". These proceedings contain 2 keynote lectures, 3 state-of-the-art lectures and about 60 papers from more than 10 countries.
This publication provides good practice guidance on the application of the press-in piling method, to satisfy the requirements of geo-structures which are embedded utilizing prefabricated piles. It covers actual examples of the press-in piling method applied to various geo-structures, such as temporary and permanent retaining walls, cofferdams, cut-off walls, foundation piles etc.
The content addresses the technical and construction issues relating to the selection of the appropriate type of press-in piling method, in accordance with required structural design criteria and soil and working conditions.
The aim of this publication is to concisely describe practical uses of the press-in piling method for project owners, designers, contractors, academic researchers and other people in the construction industry.
Dr. Tatsunori MATSUMOTO obtained his Bachelor of Engineering and Master of Science from Kanazawa University, Japan. He joined the Department of Civil Engineering of Kanazawa University in 1981 as research associate. He received the degree of Doctor of Engineering from Kyoto University in 1989. He became an Associate Professor in 1991 and promoted to a Professor in August 1999. He retains an active involvement in research into pile dynamics and deformation of pile foundations including piled rafts subjected to load combinations. He is a member of the Japanese Geotechnical Society and the International Society for Soil Mechanics and Geotechnical Engineering. He is Vice-President of the International Press-in Association. He has published more than 250 technical papers, including more than 60 Journal papers.
Dr. Katsutoshi UENO graduated Hokkaido University, Japan in 1989, and obtained his Master of Engineering in 1991. He worked as a research associate in The University of Utsunomiya from 1991 to 1998. Then he moved to Tokushima University. In 2001, he received the degree Doctor of Engineering from Tokyo Institute of Technology. Currently he works as an Associate Professor of Geotechnical Engineering in the field of Disaster Science and Mitigation, Tokushima University. His research interests are in fields of deformation and stability problems of Geo-structures, such as shallow foundations, retaining structures, unexpected underground cavities.
Dr. Koichi ISOBE is an associate professor in the Division of Civil Engineering, Hokkaido University. He received the degree of Doctor Engineering from Kyoto University in 2007 and started his career at Nagaoka University of Technology. He has a strong interest in Interaction between Soils and Foundations, Soil Dynamics, Earthquake Engineering, Slope Stability and Data Science. He is also a member of Technical Committee (TC1 Application of cantilever type steel tubular pile wall embedded to stiff ground) in the International Press-in Association (IPA). He presents the stability of cantilever type steel tubular pile retaining wall embedded to stiff ground and the size effect of footing in ultimate bearing capacity of intermediate soil by using Rigid Plastic Finite Element Method (RPFEM) in this book.
Dr. Hidetoshi NISHIOKA worked at the Railway Technical Research Institute from 2001 to 2019. He researched foundation structures using sheet piles and its design methods and code writing of design methods for the foundation of railway structures. He received the degree of Doctor of Engineering from Tokyo Institute of Technology in 2009. In 2019 he became a professor in the Department of Civil and Environmental Engineering, Faculty of Science and Engineering, Chuo University. His current research activities focus not only on summarizing the results of experiments and analyses on foundation structures and underground structures but also on linking them to social implementation as practical design, construction, and maintenance methods.
Dr. Koji WATANABE is an associate professor of the Department of Civil Engineering, Aichi institute of Technology, Japan. He received the degree of Doctor Engineering from Tokyo Institute of Technology in 2015. His research interests are foundation engineering involving pile foundation, shallow foundation, ground improvement and geotechnical centrifuge model tests. He developed some pile design and construction methods based on his research findings. He aims to develop design and construction methods on geotechnical engineering by conducting fundamental and applied researches.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 41.97 | £ 41.97 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.