Proceedings of the International Conference on Building Materials ICBM2024,310ct-03Nov Hanoi, Vietnam
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketThis volume presents articles from the International Conference on Building Materials; ICBM2024 with the theme “Building Materials in the 21st Century”, held at Hanoi in Vietnam, from 31st October to 03rd November. The conference is a diversified-topic forum for international and Vietnamese researchers, academics, industry professionals, experts and policy makers etc. to share their views, and to learn from others about recent and current developments in science and technology of building materials in the 21st century and also to discuss actions required for forthcoming building materials as well as construction development in the future. The book highlights recent research on cement, concrete, refractory materials, fire-resistant materials, paints, glass, product quality testing methods, environmental protection and recycling wastes in building material industry.
Dr. Rafat Siddique is a Senior Professor of Civil Engineering at Thapar Institute of Engineering and Technology, Patiala, India. He obtained his Ph.D from the Birla Institute of Technology & Science, Pilani in the year 1993. He was engaged for his Post-doc research at the University of Wisconsin-Milwaukee, USA. He has extensive teaching and research experience in structural Engineering more than 30 years. His research interests are in the areas of Fiber Reinforced Concrete; High Volume Fly Ash Concrete; Use of Industrial By-Products in Cement-Based Materials; Self-Compacting Concrete; Properties of Concrete at Elevated Temperatures; Microbial Concrete; and Characterization of Leachate from Concrete made with Waste Materials. He is the Editor of the Journal of Construction and Building Materials, Journal of Materials in Civil Engineering, and European Journal of Environmental and Civil Engineering.
Dr. Marios Soutsos – Professor of Structures/Materials at Queen’s University Belfast (QUB). He was, prior to his appointment in QUB, a Lecturer/Reader in Structures and Concrete Technology at the Centre for Engineering Sustainability, School of Engineering, The University of Liverpool from 1995 till 2011. He has had industrial experience in Cyprus, Libya, Saudi Arabia, and Bahrain prior to returning to Academia. Principal research experience is in construction materials and current interests include high-strength concrete, cement replacement materials, chemical admixtures, concrete rheology, the use of recycled demolition aggregate in concrete products, repair materials, and heat of hydration effects in concrete structures, as well as alkali-activated binders.
Dr. Juan Li is a Professor and Program Director of the Nonmetallic Excellence & Innovation Center for Building Materials (NEXCEL) at China Building Materials Academy, China. Her research focuses on low-carbon cement, high-performance concrete, durability of concrete, and evaluation of concrete durability under multiple actions, energy and emission of cement and concrete. She has been the Co-chair of RILEM-TC-TDC and Co-chair of RILEM-TC-CCC WG4. She is a Technical Member of the United Nations South-South Cooperation and Climate Bond Initiative.
Dr. Trong-Phuoc Huynh, Doctor of Philosophy at the National Taiwan University of Science and Technology, is an Associate Professor and Advanced Senior Lecturer at the Faculty of Civil Engineering, Can Tho University, Vietnam. His research focuses on concrete science and technology, green and lightweight construction materials, alkali-activated materials, the application of pozzolanic materials, and turning wastes into construction materials.
Dr. Tuan Ngo is a Professor of Infrastructure Engineering at the University of Melbourne, Australia, pioneered the development of sustainable construction materials and innovative lightweight modular building systems for the construction industry in Australia. The methodology he developed provides superior multi-functional materials with superior thermal, acoustic and fire properties, as well as low environmental impact. He has been named one of the world’s leading experts in the field of Composite Materials in 2023. His research interests are in the areas of Prefabricated modular buildings; Extreme loadings: blast, impact and fire; Sustainable materials and low carbon technologies; Composite materials; Modelling urban systems and design of sustainable buildings.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 42.09 | £ 42.09 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.