Proceedings of the Indian Geotechnical Conference 2022 Volume 10
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt.
Seller Inventory # 1734551118
This book comprises the select proceedings of the Indian Geotechnical Conference (IGC) 2022. The contents focus on recent developments in geotechnical engineering for a sustainable world. The book covers behaviour of soils and soil–structure interaction, soil stabilization, ground improvement, and land reclamation, shallow and deep foundations, geotechnical, geological and geophysical investigation, rock engineering, tunnelling, and underground structures, slope stability, landslides and liquefaction, earth retaining structures and deep Excavations, geosynthetics engineering, geo-environmental engineering, sustainable geotechnics, and landfill design, geo-hydrology, dam and embankment engineering, earthquake geotechnical engineering, transportation geotechnics, forensic geotechnical engineering and retrofitting of geotechnical structures, offshore geotechnics, marine geology, and subsea site investigation, computational, analytical and numerical modelling, and reliability in geotechnical engineering. The contents of this book will be useful to researchers and professionals alike.
Dr. Babu T. Jose completed his B.Tech. from NIT Warangal in 1967 with Nehru Memorial Gold Medal, M.Tech. from IIT Madras in 1972, and Ph.D. from Cochin University of Science and Technology in 1990. He was Lecturer in NIT, Calicut, for 13 years (1967–1980), Reader (1980–1990), and Professor in Cochin University of Science and Technology during 1990–2004. Currently, he is Emeritus Professor in Cochin University of Science and Technology since 2004. He has commendable experience in research. He has guided 12 Ph.D. students, obtained several research grants from Dept. of Science and Technology, AICTE, Sate Committee for Sc. & Tech., etc. He has published over 200 research papers, and on the consultancy front, he has successfully completed over 500 projects. On the administrative side, he was Principal, School of Engineering, Cochin University during 1980–1995 and Director of two Engineering Colleges from 1985 to 2004.
Dr. Dipak Kumar Sahoo is Full-Time Faculty Member since 2001 and currently Professor since 2009, in the School of Engineering, Cochin University of Science and Technology, Kochi. Prior to academics, he worked in the Fertilizers and Chemicals Travancore Limited, a Central Public Sector Company in India for more than 10 years as Consulting Engineer to many public and private sector companies for setting up their green-field petrochemical complexes in different parts of India. He received his B.Sc. Engineering (Civil) from CET Bhubaneswar in 1987, M.Tech. in Construction Engineering and Management from Cochin University of Science and Technology in 1998, Ph.D. in Structural Engineering from the Indian Institute of Technology Roorkee in 2009, and LL.B. from the Cochin University of Science and Technology in 2015. He is also Reviewer for leading international journals of repute.
Dr. Sai Vanapalli is Professor and Chair of the Department of Civil Engineering at the University of Ottawa. He took Ph.D. from the University of Saskatchewan in 1994. He has been actively involved with research activities related to mechanics of unsaturated soils. He has published over 125 research contributions, including peer-reviewed journals, refereed conferences, book chapters, keynote papers, and state-of-the-art reports. In 2010, he was honoured with the Stermac Award for his outstanding contributions to the Canadian Geotechnical Society. He was also nominated for various teaching awards, including the OCUFA Teaching Excellence Award and the University of Ottawa Award for Excellence in Teaching. He is Active Member of several professional societies, including the Canadian Geotechnical Society, American Society of Civil Engineers, Professional Engineers of Ontario, and the International Society of Soil Mechanics and Geotechnical Engineering.
Prof. Chandresh H. Solanki is Professor (Geotechnical Engineering) in the Department of Civil Engineering, Sardar Vallabhbhai National Institute of Technology (NIT Surat), Gujarat, and Faculty Member since 16 August 1991. He has guided more than 59 postgraduate dissertations and 26 Ph.D. theses. He is Present Research Supervisor of 6 ongoing Ph.D. research scholars. He has published more than 180 research papers in reputed international and national journals and conferences. He was Chairman of the Indian Geotechnical Conference (IGC) 2019, Surat. He has been elected as Member of the Executive Committee IGS for the four terms (2015–2021). He worked as Dean (Planning & Development) and Head of the Department at SVNIT, Surat. He has published 9 books and edited proceedings. He has 33 years of teaching experience for undergraduate and postgraduate students.
Dr. K. Balan was Professor and Dean (Research) of Rajadhani Institute of Engineering and Technology, Nagaroor, Trivandrum. He was Former Professor in Civil Engineering, College of Engineering Trivandrum under the Directorate of Technical Education, Govt. of Kerala. His Area of research is on Geosynthetics with natural fibres, especially Coir Geosynthetics. He published about 120 papers in International and National Journals, Conferences, and Keynote Lectures in Coir Geosynthetics. He was Reviewer of three international journals and Editorial Board Member of Indian Journal of Geosynthetics and Ground Improvement published by Indian Chapter of International Geosynthetics Society.
Dr. Anitha G. Pillai is currently Dean Academics at SCMS School of Engineering & Technology, Karukutty, Kerala, and has been Full-Time Faculty Member in the Department of Civil Engineering of the institution since 2001. She also headed the Department during the period 2015–2021. Prior to that she was with the industry for two years and has worked with Fertilizers and Chemicals Travancore Limited, Kochi, Kerala (FACT) for a year. She obtained her bachelor’s degree in civil engineering from Government Engineering College, Thrissur, Kerala, and master’s degree in construction engineering and management from Cochin University of Science & Technology (CUSAT) with a first rank. She also received her Ph.D. from CUSAT. Along with her teaching assignments, she has been Coordinator for NAAC Accreditation and guided the Civil Engineering Department for NBA Accreditation. She is Life Member of ISTE, Indian Geotechnical Society, and Indian Concrete Institute.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.20 | £ 42.20 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.