Proceedings of ICITES-2025 Volume 2
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt.
Seller Inventory # 2568882672
This book presents second volume of selected proceedings of the International Conference on Innovative Trends in Engineering for sustainability (ICITES 2025) and provides a comprehensive exploration of smart and sustainable construction technologies, focusing on advancements that enhance efficiency, resilience, and environmental responsibility in the built environment.It covers Smart Construction Technologies, including AI, IoT, BIM, and 3D printing, which are transforming construction processes. Sustainable and Resilient Infrastructure highlights eco-friendly materials, climate-adaptive designs, and energy-efficient buildings. Sustainable Urban Mobility discusses smart transport systems, traffic management, and urban planning for future-ready cities.Structural Innovations focus on new materials, advanced construction methods, and structural health monitoring. Resilient and Smart Water Infrastructure examines smart water management, wastewater reuse, and coastal engineering solutions. Innovations in Construction Management address modern site safety measures, workforce development, and project implementation strategies.Additionally, Smart and Sustainable Geotechnical Engineering explores soil improvement techniques, geotechnical risk assessment, and climate adaptation solutions. Urban Waste Management discusses waste-to-energy systems, pollution control, and circular economy strategies for sustainable urban living.This book serves as a valuable resource for engineers, architects, urban planners, and researchers, offering insights into cutting-edge solutions for a smarter, greener, and more resilient built environment.
Kamal Laksiri is a highly accomplished Civil Engineer with over three decades of experience in hydropower projects and infrastructure development. He holds PhD from Saga University, Japan (2007), MSc from NTNU, Norway (1997), and BSc (Eng) Hons from the University of Moratuwa, Sri Lanka (1990). He began his career as a Junior Engineer in the private sector (1988–1991) before joining the Ceylon Electricity Board (CEB) in 1991, where he has held key positions, including: Reservoir Engineer, Samanalawewa Hydroelectric Project (1992–1997),Chief Engineer, Kukule Ganga Hydropower Project (1999–2004),Project Director, Broadlands Hydropower Project (2008–2022) and Project Director, Moragolla Hydropower Project (2023–Present).His professional affiliations are notable; Dr.Kamal Laksiri is a Fellow of IESL, ASCE (USA), ICE (UK), and IET (UK) and holds the International Professional Engineer (Int P.Eng) certification.
Brajesh Kr. Dubey is a Professor in Environmental Engineering and Management at the Indian Institute of Technology – Kharagpur (IIT-KGP), where he also serves as Chair of the School of Water Resources and leads the Circular Engineering Research (CERG) Laboratory in the Department of Civil Engineering. He holds a Ph.D. in Environmental Engineering Sciences from the University of Florida, USA, and a B.Tech (Hons) in Civil Engineering from IIT-Kharagpur. Before returning to India, Dr. Dubey held academic positions at the University of Auckland (New Zealand), East Tennessee State University (USA), and the University of Guelph (Canada). With nearly two decades of post-PhD experience, Dr. Dubey specializes in sustainable and resilient systems, circular economy approaches, life cycle assessment (LCA), decarbonizationof urban infrastructure, and resource recovery from waste. His work is globally recognized and has been funded by prestigious institutions such as the United Nations Industrial Development Organization (UNIDO), National Geographic Society, OECD, and the Indian Department of Science and Technology (DST).
Smitha Gopinath is a Senior Principal Scientist at the Advanced Protective Structures and Mechanics Laboratory (APSML), CSIR-Structural Engineering Research Centre (CSIR- SERC), Chennai, India. She holds Ph.D. in Civil Engineering from IIT Madras and specializes in textile reinforced concrete, computational modeling of concrete composites, repair and retrofitting of structures, finite element analysis, and alternative reinforcements in concrete.Dr. Smitha Gopinath has received several prestigious awards, including the L&T Dr. A. Ramakrishna Young Engineer Award (2012) and the ICI-Young Scientist Award (2016). Her pioneering work in Textile Reinforced Concrete (TRC) Prototyping Technology has been recognized among the Top 100 Indian Innovations (2022) by the Indian Innovators Association.
Preetha Prabhakaran is the Assistant Professor of Civil Engineering Department in , Toc H Institute of Science & Technology, Cochin Kerala, with over 20 years of teaching experience. She holds a Ph.D. in Civil Engineering from Cochin University of Science and Technology (CUSAT), focusing on the structural behaviour of reinforced concrete beams strengthened with CFRP. She also earned an M.Tech in Computer-Aided Structural Engineering from Mar Athanasius College of Engineering and a B.Tech in Civil Engineeringfrom CUSAT. Her areas of expertise include structural analysis, design of reinforced and steel structures, advanced concrete technology, and environmental pollution control modeling.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 41.92 | £ 41.92 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.