Proceedings of ICITES-2025 Volume 1
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt.
Seller Inventory # 2914502570
This book presents first volume of selected proceedings of the International Conference on Innovative Trends in Engineering for sustainability (ICITES 2025), and explores the latest technological and sustainable innovations transforming the construction industry. It covers AI, IoT, BIM, and 3D printing, enhancing efficiency and automation in Smart Construction Technologies. The Sustainable and Resilient Infrastructure section highlights eco-friendly materials, net-zero buildings, and climate-adaptive designs. Sustainable Urban Mobility focuses on smart transport systems, urban planning, and traffic management for efficient cities. Finally, Structural Innovations discusses advanced materials, construction methods, and structural health monitoring. A must-read for engineers, architects, and planners, this book bridges technology and sustainability for the future of construction. Bringing together the latest advancements in smart and sustainable construction, this book serves as a comprehensive resource for engineers, architects, urban planners, and researchers looking to implement technological and eco-friendly solutions for the future of the built environment.
Rahimi A. Rahman is an Associate Professor at the Faculty of Civil Engineering Technology, Universiti Malaysia Pahang. He holds Ph.D. in Civil, Environmental, and Sustainable Engineering from Arizona State University, USA, along with B.Eng. and M.Eng. degrees in Civil and Environmental Engineering from Saitama University, Japan. Dr. Rahman has an extensive academic and research background, with over 70 journal publications, 50 conference proceedings, and contributions to four book chapters. He has successfully supervised two Ph.D. scholars and is currently guiding 11 research scholars while co-supervising 20 more. His research interests include Building Information Modeling (BIM), construction safety, digital construction technology, infrastructural management, and construction waste management. He is an Affiliate Academic at The Bartlett School of Sustainable Construction, University College London.
Sunitha K. Nayar is the COO of the Global Sanitation Centre of Excellence (GSCOE) at IIT Palakkad. She holds Ph.D. in Civil Engineering from Indian Institute of Technology Madras (IIT Madras), M.Tech. in Structural Engineering from National Institute of Technology Calicut, and B.Tech. in Civil Engineering from NSS Engineering College, Palakkad. With over 25 years of academic and research experience, Dr. Sunitha K Nayar has served in various roles, including Visiting Faculty at IIT Palakkad, Assistant Professor at Amrita Vishwa Vidyapeetham University, and Women Scientist at IIT Madras. Her research expertise lies in sustainable construction materials, life cycle assessment, fiber-reinforced concrete (FRC), high-performance concrete, and circularity in infrastructure systems. Dr. Sunitha K Nayar has published several peer-reviewed journal articles in reputed journals, including ACI Materials Journal, RILEM Technical Letters, and the Indian Concrete Journal. She has also co-edited volumes on construction materials and systems and contributed to national and international conferences.
K. S. Anandh is an Assistant Professor specializing in Construction Engineering and Management at SRM Institute of Science and Technology, Chennai. He earned his Ph.D. in Construction Engineering and Management from SRM Institute of Science and Technology in 2021, following his M.E. and B.E. in Civil Engineering from Annamalai University. With over 14 years of academic experience, Dr. Anandh has been actively involved in research, teaching, and professional development in the construction sector. His research focuses on Project Management, Green Buildings, Building Information Modeling (BIM), Advanced Construction Techniques, Construction Safety, Workforce Diversity, Jobsite Management, and Well-being in Construction. He has authored multiple journal papers in SCI and Scopus-indexed journals, book chapters, and a book on implementing machine learning in the construction industry.
Vasudev R is currently the Professor and Head of the Department of Civil Engineering, Toc H Institute of Science & Technology, Arakkunnam, Ernakulam. He obtained his B.E. (Civil) from Bharathiar University, Coimbatore, M.Tech (Computer Aided Structural Engg.) from Mahatma Gandhi University, Kottayam and Ph.D. in Fibre Reinforced Concrete from Anna University, Chennai. His major areas of research interests include Fibre Reinforced Concrete, Special Concrete, Repair Rehabilitation of Structures, Forensics in Civil Engineering and Sustainable materials for civil engineering applications. He has published 27 papers in conferences and international journals.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 41.63 | £ 41.63 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.