Proceedings of the Forum Math-for-Industry 2019
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. This book is intended for a wide range of researchers both from academia and industry interested in contributing to industries in an interdisciplinary way. The primary industries, including agriculture, fishery, and power industries, are the m.
Seller Inventory # 1071298072
This book is intended for a wide range of researchers both from academia and industry interested in contributing to industries in an interdisciplinary way. The primary industries, including agriculture, fishery, and power industries, are the most fundamental infrastructure of the human societies. Traditionally, primary industries have been managed in the small family/community base, but with increase in population and development of society, the size of primary industry has grown. The efficiency, quality, and stability of these industries affect the societies significantly, so that they have become one of the major areas that mathematics could contribute to substantially. Also, primary industries are affected by the environment, where mathematical studies play an essential role. The conference was hosted by the research community in New Zealand, where such collaborative activities in mathematics between the industry and academia have been successfully established from an early stage. This enabled the conference to bring together a range of research topics- from pioneering works to cutting-edge results, from agriculture to geothermal energy and nuclear fusion, and from mathematical modeling and analysis to data analysis.
Robert McKibbin now retired from New Zealand’s Massey University, is Emeritus Professor of Applied Mathematics. An alumnus of both the University of Canterbury (M.Sc. in Mathematics), and the University of Auckland (Ph.D. in Engineering Science), he is Fellow of the NZ Mathematical Society. He was awarded the NZ Geophysics Prize 1982, the NZ Royal Society’s Hamilton Memorial Prize 1984, and the ANZIAM Medal 2012. He has been involved with Industrial Mathematics within NZ and also with the Asia Pacific Consortium (APCMfI) initiated by Kyushu University’s Institute of Mathematics for Industry; he was Member of the latter’s International Advisory Board for several years. His research interests are in mathematical modeling of heat and mass transfer processes and particularly those of geophysical phenomena associated with geothermal systems, including thermally driven underground fluid convection and atmospheric particle transport associated with volcanic and other eruptive mechanisms.
Graeme Wake is now Adjunct Professor of two Auckland University campuses in New Zealand: Auckland University of Technology and Massey University (also is Emeritus Professor of the latter). He has served in four different University campuses in New Zealand, was Postdoctoral Scholar (1970), and much later Visiting Fellow at three different Oxford University Colleges. He was awarded the ANZIAM Medal for services to, and excellence in, ANZ Applied Mathematics in 2006, a Doctor of Science degree from Victoria University of Wellington in 1997, and a Fellowship of the Royal Society of New Zealand in 2004. He held two Visiting Fulbright awards, one (incoming) from the USA) and one as Visiting Fulbright Professor to USA. In 2015, he was Foundation Leader of the Group “Mathematics-in-Industry for New Zealand (MINZ)” which organizes Study Groups like those that exist now in many countries, and which started in Oxford in 1968. Graeme was the initial NZ representative of the Asia Pacific Consortium when it was formed in 2015. His research encompasses industrial mathematics, mathematical biology, applied differential, and functional differential equations.
Osamu Saeki is Distinguished Professor at Kyushu University. He received his Ph.D. in Mathematics from the University of Tokyo. He was awarded the Takebe Katahiro Prize 1996 and the Geometry Prize 2015 from the Mathematical Society of Japan. He was involved in establishing the Institute of Mathematics for Industry (IMI), Kyushu University, launched in 2011. He is also engaged in the education of industrial mathematics and is Coordinator of the WISE program “Graduate Program of Mathematics for Innovation”, supported by MEXT, Japan. His current research interests concern topology, singularity theory, topology of low-dimensional manifolds, knot theory, and visualization of large scale data.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 41.81 | £ 41.81 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.