Proceedings of the First International Conference on Engineering Structures
Sold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
New - Hardcover
Condition: New
Ships within U.S.A.
Quantity: 10 available
Add to basketSold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
Condition: New
Quantity: 10 available
Add to basketNew. Delivery takes 25-30 days. Excellent Customer Service.
Seller Inventory # POD-398086
This book includes peer reviews articles from the First International Conference on Engineering Structures (ICES2024), held at Guangzhou, China, on 8-11 November 2024. The conference is an international multi-disciplinary forum for scientists and engineers to disseminate the latest innovations and achievements, discuss current trends and emerging issues in structural engineering and structural mechanics communities, and promote information exchange within multidisciplinary field. The book focuses on new developments and innovative applications of structural and mechanics principles and digital technologies for the analysis and design of engineering structures.
Prof. Jie Yang is the Distinguished Professor in School of Engineering, RMIT University. He is currently serving as the Lead Editor-in-Chief of Engineering Structures and is the Highly Cited Researcher by Clarivate Analytics from 2019-2023. His main research interests include advanced composite structures, mechanical metamaterials, functionally graded structures, nanocomposites, structural stability and dynamics, multi-scale numerical simulation, smart structures and control, applied mechanics, computational mechanics, and nano/micro-mechanics.
Prof. Fu Jiyang is currently the Vice President of Guangzhou University and recip-ient of the National Science Fund for Distinguished Young Scholars. He has successively served as the Director of Research Center for Wind Engineering and Engineering Vibration of Guangzhou University, Vice Dean of the School of Civil Engineering of Guangzhou University, and Deputy Director of the Guangzhou Science and Technology Innovation Committee. Long dedicated to the field of structural wind engineering, he has pioneered innovations in in-situ measurements, wind tunnel testing, and wind-resistance optimization design for large-scale complex structures. His work includes 130+ SCI-indexed papers, 60+ authorized Chinese invention patents, and 16 PCT international patents, which prompt him to be named to the “Annual Impact” list of the world’s top 2% of scientists.
Prof. Airong Liu is currently Professor and Director of Center for Wind Engineering and Engineering Vibration, Guangzhou University. She was externally appointed as Vice Director of China International Science and Technology Cooperation Base, Vice Director of Guangdong Engineering Technology R&D Center, Council member of The Chinese Society of Theoretical and Applied Mechanics on Civil Engineering, and Editorial Board member of Engineering Structures. Her main research interests include intelligent inspection of Civil Engineering, structural stability and dynamics.
Prof. (Alex) Ching-Tai Ng is Professor in the School of Architecture and Civil Engineering at The University of Adelaide. He currently serves as the Co-Editor-in-Chief of Engineering Structures. His primary research focuses on Structural Health Monitoring (SHM), nondestructive evaluation (NDE), smart sensing technologies, vibration testing, smart materials, system identification, advanced composite materials, and engineering reliability. He is particularly passionate about applying SHM and NDE techniques across diverse engineering disciplines to tackle complex, multidisciplinary research challenges.
"About this title" may belong to another edition of this title.
Professional Book Seller shipping from Multiple Locations Worldwide for fastest delivery possible!
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Basi6 International, Irving, Texas, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
All orders shipped via FedEx or DHL and delivered to your doorstep within 3-5 days. We do not ship to P.O.Boxes and a proper street address must be provided to avoid any delays.
| Order quantity | 5 to 14 business days | 3 to 6 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.