Proceedings of the 4th International Conference on Electronic Engineering and Renewable Energy Systems - Volume 1
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt.
Seller Inventory # 1929864588
This book includes papers presented at the 4th International Conference on Electronic Engineering and Renewable Energy (ICEERE 2024), held in Saidia, Morocco, which focus on the application of artificial intelligence techniques, emerging technology, and the Internet of things in electrical and renewable energy systems, including hybrid systems, micro-grids, networking, smart health applications, smart grid, mechatronics, and electric vehicles. It particularly focuses on new renewable energy technologies for agricultural and rural areas to promote the development of the Euro-Mediterranean region. Given its scope, the book is of interest to graduate students, researchers, and practicing engineers working in the fields of electronic engineering and renewable energy.
The book represents Volume 1 for this conference proceedings, which consist of a 2-volume book series
Bekkay Hajji is Professor and Director of the Renewable Energy, Embedded Systems and Information Processing Laboratory in the National School of Applied Sciences at the Mohammed First University. He received his DEA in microelectronics from the Institut National des Sciences Appliquées of Toulouse" (INSAT, France) in 1996 and his Ph.D. from the Laboratory for Analysis and Architecture of Systems (LAAS-CNRS), Toulouse, France. He is Author of two proceedings books and one handbook. His research activities focus on the development of biochemical micro-sensors and the application of artificial intelligence techniques in photovoltaic systems.
Antonio Gagliano is Associate Professor of Building Physics at the University of Catania, Italy, where he is Scientific Manager of the Laboratory of Applied and Building Physics of the Department of Electric, Electronic and Computer Engineering (DIEEI). He received his M.S. in 1991 and Ph.D. degree in Environmental Applied Physics in 1998. He participated in several national and international research projects. He is Author of more than 130 articles published in reputed international journals and conference proceedings and component of the editorial board of several international journals.
Adel Mellit is Professor at the Faculty of Sciences and Technology, Jijel University, Algeria. He received his M.S. and Ph.D. in electronics from the University of Sciences Technologies (USTHB), Algiers, in 2002 and 2006, respectively. His research interests focus on the application of artificial intelligence techniques in photovoltaic systems and micro-grids. He has authored or co-authored more than 170 papers in international peer-reviewed journals (mostly with Elsevier), papers in conference proceedings (mostly with the IEEE) mainly on photovoltaic systems, six book chapters, two proceedings books, and one handbook. He is serving on the editorial board of the Renewable Energy and is Editor of the IEEE Journal of Photovoltaic and of Energy (Elsevier Ltd).
Abdelhamid Rabhi is Associate Professor at the Faculty of Sciences, University of Picardie Jules Verne of Amiens, France. He completed his Masters in robotics and control systems from the University of Versailles, and his Ph.D. in observation and control for nonlinear and complex systems in December 2005. His research deals with robust control, diagnosis, and observation for complex systems with focus on areas such as vehicles, autonomous robots applications, and renewable energy systems.
Michele Calì is Associate Professor of Engineering Design and Methods at the Electronics and Computer Engineering Department at the University of Catania (UdC), Italy. He received M.Sc. in Mechanical Engineering from UdC in 1995 and Ph.D. degree in Structural Mechanics from UdC in 2000. In May 2023, he obtained National Academic Qualification as Full Professor. He collaborates in many research projects with prestigious Italian and foreign Industrial companies: Ferrari S.p.A., Erg Refineries S.p.A., ISAB Refineries, ST Microelectronics, Fiat S.p.A, Stellantis, NT&T, Euromecc S.p.A., Elasis, FANUC Industrial Robot, Bosh, etc.
His research interests include Reverse Engineering techniques, Rapid Prototyping techniques, CAD-CAE modeling and simulations, Development of new sustainable biomaterials, Algorithms Processing, Computer Aided Tolerancing (CAT), Geometric and Structural Optimization in mechanical and biomedical fields. He published more than 80 manuscripts in most valuable International Journals and more than 60 papers in national and international conferences.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 41.99 | £ 41.99 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.