Proceedings of the 1st Electrical Artificial Intelligence Conference, Volume 4
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt.
Seller Inventory # 2126159515
This book is the fourth volume of proceedings of the 1st Electrical Artificial Intelligence Conference (EAIC 2024).
Artificial intelligence and low-carbon economy are two vibrant research fields in the world today. To achieve the goal of carbon neutrality not only signifies a significant transformation in the economic growth mode and a profound adjustment of energy systems but also has equally significant implications for the global economic and social transformation. In the wave of the rapid development of digital economy, artificial intelligence has become an important driving force for promoting high-quality economic and social development. In the path to the “Dual Carbon” goals, which are the “Peak Carbon Dioxide Emissions” goal and the “Carbon Neutrality” goal, artificial intelligence will play an important role especially in energy conservation and carbon reduction in the electrical field, which is worthy of in-depth exploration and research.
In order to promote the deep integration of the electrical engineering and artificial intelligence, successfully achieve the "dual carbon" goals, and promote green, low-carbon, and high-quality development, the China Electrotechnical Society and relevant units jointly held the 1st Electrical Artificial Intelligence Conference in Nanjing, China during the 6th~8th December, 2024. The conference invited well-known experts with significant influence in the fields of electrical engineering and artificial intelligence to jointly explore the application of artificial intelligence in the optimization design, fault diagnosis, intelligent control, and optimized operation of electrical equipment, promote the integration of artificial intelligence innovations and various application scenarios, and actively lead the trend of technological innovation.
Ronghai Qu is Professor at the College of Electrical and Electronic Engineering, Huazhong University of Science and Technology, China, Fellow of IEEE. He received his bachelor’s and master’s degrees from Tsinghua University, China in 1993 and 1995, respectively. He received his doctoral degree from the University of Wisconsin, Madison, USA, in 2002. He received the honorary titles of Distinguished Lecturer of IEEE Industry Application Society for 2019~2020, and the Outstanding Member Awards in 2019. His research focuses on motor design, and drive and control.
Zhengxiang Song is Professor at the College of Electrical and Electronic Engineering, Xi'an Jiaotong University, China. He obtained his bachelor’s, master’s, and doctoral degrees from Xi'an Jiaotong University, China in 1992, 1995, and 1999, respectively. He has served as Executive Deputy Director of the State Key Laboratory of Energy, China since 2013, and Executive Deputy Director of the Engineering Research Center, the Ministry of Education of China, since 2018. His research interests include the theory and engineering of intelligent electrical appliances, the theory and technology of electric energy storage, electromagnetic protection, and equipment detection and fault diagnosis.
Zhiming Ding is Professor at the Institute of Software, Chinese Academy of Sciences. He obtained his bachelor’s degree from Wuhan University, China in 1989, his master’s degree from Beijing University of Technology, China in 1996, and his doctoral degree from the Institute of Computing, Chinese Academy of Sciences in 2002. He serves as Director of the Center of Space-Time Data Management and Date Science. He is also Chair of the society transportation sector of the IEEE Intelligent Transportation System Society. His research interests include database and knowledge base systems, real-time processing and intelligent analysis of the big data in spatiotemporal awareness, Internet of Things and mobile data management, disaster emergency big data management, etc.
Gang Mu is Professor at Northeast Electric Power University, China. He received his bachelor’s and master’s degrees from Northeast Electric Power University, China in 1982 and 1984, respectively. He received his doctoral degree from Tsinghua University, China in 1991. He serves as Fellow of the Chinese Society of Electrical Engineering. He was granted two-second prizes of the National Science and Technology Progress Awards of China. His research interests focus on safe operation and control of the new generation power system, and large-scale renewable energy development and networking technology.
Rui Xiong is Professor at Beijing Institute of Technology, China. He also serves as Guest Professor at the Massachusetts Institute of Technology, the USA, Adjunct Professor at Swinburne University of Technology, and IET Fellow. He has hosted an Outstanding Youth Fund Project by the National Natural Science Foundation of China. He has engaged in fundamental theoretical and engineering application research on power systems, power battery systems, energy storage systems, big data, and artificial intelligence for electric transport vehicles.
Li Han is Professor at Institute of Electrical Engineering (IEE), Chinese Academy of Sciences. He received his bachelor’s and master’s degrees from Lanzhou University, China in 1992 and 1995, respectively. He received his doctoral degree from Tsinghua University, China in 2000. He serves as Director of the research sector of micro-nano processing technology of IEE.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.38 | £ 42.38 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.