Proceedings of the 10th International Conference on Civil Engineering
Sold by Books Puddle, New York, NY, U.S.A.
AbeBooks Seller since 22 November 2018
New - Soft cover
Condition: New
Ships within U.S.A.
Quantity: 4 available
Add to basketSold by Books Puddle, New York, NY, U.S.A.
AbeBooks Seller since 22 November 2018
Condition: New
Quantity: 4 available
Add to basketThis open access book is a compilation of selected papers from the 10th International Conference on Civil Engineering (ICCE2023). The work focuses on novel research findings on seismic technology of civil engineering structures, High-tech construction materials, digitalization of civil engineering, urban underground space development. The contents make valuable contributions to academic researchers and engineers.
Guang-Liang Feng, PhD, Professor, is working in Wuhan Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. His main research is deep rockmass mechanics and underground engineering safety. He has been selected in several provincial and ministerial level talent programs, such as Outstanding Youth Program of Hubei Province, Top Young Talent Program of Hubei Province, and Youth Talent Support Project of China Association for Science and Technology.
He served as editorial board members of about 10 mainstream SCI/EI journals. He presided 3 projects of National Natural Science Foundation of China and 1 sub-project of National Key Research and Development. Authored/co-authored more than 100 SCI/EI papers and which have been cited more than 3000 times and 6 of them are ESI highly cited and hot papers as the first/corresponding author. Authorized more than 40 international and national invention patents. As the main draftsman, he compiled one International Society for Rock Mechanics Suggested Method, and two energy industry standards of the People's Republic of China codes. 5 provincial-level construction methods were compiled. Meanwhile, two first prizes of technological inventions awards (ranked 1st and 3rd), one first prize of natural science award (ranked 2nd), and two first prizes of technological progress award (ranked 3rd and 5th) in provincial and ministerial level were won.
Aiming at the scientific problem of rockburst mechanism, warning, and mitigation in deep tunnel, a technology and device for rockmass fracture high-precision perception was invented, the development evolution and mechanism of rockburst was revealed, and a quantitative warning theory and software platform of rockburst was established. The theory and technology have been listed into 6 international and industry standards, and applied to major deep projects, such as Sichuan-Tibet railway, hydropower station in Pakistan, etc..
"About this title" may belong to another edition of this title.
We accept return for those books which are received damamged. Though we take appropriate care in packaing to avoid such situation.
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Books Puddle, New York, New York, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
| Order quantity | 12 to 19 business days | 12 to 14 business days |
|---|---|---|
| First item | £ 2.92 | £ 5.12 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.