Principles of Extreme Mechanics (XM) in Design for Reliability (DfR)
Book 102 of 110: Engineering MaterialsBudiman, Arief Suriadi
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketThis book addresses issues pertinent to mechanics and stress generation, especially in recent advanced cases of technology developments, spanning from micrometer interconnects in solar photovoltaics (PV), next-gen energy storage devices to multilayers of nano-scale composites enabling novel stretchable/flexible conductor technologies. In these cases, the mechanics of materials have been pushed to the extreme edges of human knowledge to enable cutting-edge, unprecedented functionalities and technological innovations. Synchrotron X-ray diffraction, in situ small-scale mechanical testing combined with physics-based computational modeling/simulation, has been widely used approaches to probe these mechanics of the materials at their extreme limits due to their recently discovered distinct advantages. The techniques discussed in this manuscript are highlights specially curated from the broad body of work recently reported in the literature, especially ones that the author had led thepursuits at the frontier himself. Extreme stress generation in these advanced material leads to often new failure modes, and hence, the reliability of the final product is directly affected. From the recent topics and various advanced case studies covered in this book, the reader gets an updated knowledge of how new mechanics can and has been applied in Design-for-Reliability (DfR) for some of the latest technological innovations known in our modern world. Further, this also helps in building better designs, which may avoid the pitfalls of the current practiced trends.
Dr. Arief Suriadi Budiman received his B.S. in mechanical engineering from Institute of Technology, Bandung (ITB), Indonesia, M.EngSc. in materials engineering from Monash Univ., Australia, and Ph.D. in Materials Science and Engineering from Stanford University, CA, in 2008. During his doctoral candidacy at Stanford’s Department of Materials Science & Engineering under the supervision of Professor William D. Nix (MRS Von Hippel Award 2007), he received several research awards (MRS Graduate Silver Award 2006, MRS Best Paper 2006) and contributed to several high-impact journal publications (Acta Materialia, Applied Physics Letters, Journal of Electronic Materials). As a graduate student, he gave two symposium invited talks as well in the MRS spring and fall meetings in 2006. More recently, he has been awarded the prestigious Los Alamos National Laboratory (LANL) Director's Research Fellowship to conduct top strategic research for the energy and national security missions of the Los Alamos National Laboratory. At the Center for Integrated Nanotechnologies (CINT) at Los Alamos, his research program involves nanomaterials for extreme environments with potential applications in advanced energy systems including for next-generation nuclear power reactors. He has been active in MRS throughout his professional career – from winning an MRS Graduate Student Silver Award in 2006 as a Ph.D. student to organizing various symposia (Mechanical Behavior of Nanostructured Composites, Advances in In Situ Experimentation Techniques Enabling Novel and Extreme Materials Design) in MRS Spring meetings in the USA, as well as ICMAT (International Conference of Materials in Advanced Technologies) organized by MRS-Singapore Chapter. He most recently led as the symposium chair in MRS (Materials Research Society) Spring 2019 Meeting in Phoenix, AZ, and concurrently served as Lead Editor of a Focus Issue of Journal of Materials Research on the topic of “Plasticity and Fractureat the Nanoscales” published in May 2019. His involvement in other materials and technology societies includes TMS (The Mineral, Metals and Materials Society) and AVS (American Vacuum Society), where he served as Co-Chairs in various symposia in TMS and as Members of the Board of Directors for the AVS TFUG (Thin Films Users Group). Additionally, he serves on the editorial board of the Journal of Electronic Materials. He has authored over 80 refereed scientific papers, conference articles, books, book chapters and patents.
Dr. Arief Suriadi Budiman is currently leading a dynamic, international group researching nanomaterials and nanomechanics and their implications for extending the extreme limits of materials as well as their applications in the next-generation energy technologies (solar PV, extreme environments, energy storage, etc.). His work has also recently received the famed Berkeley Lab Scientific Highlights twice in May 2010 and June 2013 (the latter was forhis novel, innovative characterization technique that enables thin silicon solar PV technology). He also recently served an academic stint at MIT (Massachusetts Institute of Technology) in Boston, MA, as part of a faculty immersion/training exchange to conduct research in energy (Solar PV, as well as next-generation energy storage/Li-ion). In Singapore, he is currently running a multi-million dollars research grant program on enabling ultrathin (< 80 micron) silicon solar cells, tunable impact resistance of novel materials design enabled by additive manufacturing as well as novel metallic stretchable conductor technology for next-generation biomedical/healthcare flexible/wearable devices sponsored by the National Research Foundation (NRF), Ministry of Education (MOE) and other premier funding agencies of the Singapore’s Government. He has been invited to give invited lectures/seminars on his research program in various top international scientific/technological conferences. He hasauthored/co-authored several high-impact journal publications (Acta Materialia, Solar Energy Materials & Solar Cells, Progress in Photovoltaics, Materials Science Engineering A, Materials, etc.). He has also recently published a book “Probing Crystal Plasticity at the Nanoscales – Synchrotron X-ray Microdiffraction” (Springer 2015). He has two U.S. patents and one pending.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ‘consumer’ is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
In order to exercise your revocation right, you must inform us (Moluna GmbH, Münsterstr. 105, 48268 Greven, Telephone number: 02571/5 69 89 33, Fax number: 02571/5 69 89 30, E-Mail address: abe@moluna.de) of your decision to revoke this contract by means of a clear declaration (e.g. a letter sent via post, fax or email). You can use the enclosed specimen revocation form for this, which however is not mandatory.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts.
The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To Moluna GmbH, Engberdingdamm 27, 48268 Greven, Fax number: 02571/5 69 89 30, Email address: abe@moluna.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.26 | £ 42.26 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.