Principles of Engineering Management
He, Jishan
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketThis book presents a comprehensive overview of engineering management, giving readers a complete picture of this research field. Following an introduction, the book explores:
• Engineering Management Ontology
• Engineering Management Epistemology
• Engineering Management Methodology
• Engineering Management Decision Theory
• Engineering Management Organization Theory
• Engineering Management Value Theory
• Engineering Management Innovation Theory
• Engineering Management Environment Theory
• Engineering Management Humanities
• Engineering Management Ethics Theory
The book includes case studies that demonstrate how various concepts can be practically applied to resolve real-world problems. The book is a valuable read for professionals of engineering management, management and systems engineering.
Jishan He is Professor and Doctoral Supervisor of Central South University and academicians of Chinese Academy of Engineering.
During his 60 years of scientific research and teaching, he once served as President of the former Central South University of Technology and Director of Department of Energy and Mining at Chinese Academy of Engineering. Now he is Bureau Member of China Academy of Engineering, Member of the Standing Committee of Engineering Management Department at China Academy of Engineering, Honorary Chairman of Hunan Association for Science and Technology, President of Academicians Sodality of Hunan, and Adviser of Hunan Calligraphers Association.
With long-term efforts in the research of geophysical theory, method, and observation instrument system, Professor He has developed the “dual frequency induced polarization method,” “pseudo-random signal electrical method,” “wide field electromagnetic method,” the “flow field fitting method,” and so on. The theoriesand instruments developed by him make China become a leader in frequency study and electrical method in the world, which bring him one prize on the National Science Conference, three awards of National Invention Prize, two awards of National Science and Technology Progress Award and 18 provincial and ministerial level awards, the title of National Outstanding Mid-Aged Experts in 1986, the title of National Model Workers on Non-ferrous Metals in 1995, the title of National Advanced Educators in 2000, and the title of National Advanced Workers in 2005. His research achievements have been widely applied in China and abroad. Famous American geophysicist Professor HF Morrison once wrote: “Professor He is recognized world wide for his many accomplishments in exploration geophysics and particular for his outstanding work in induced polarization and controlled source audio magnetotellurics.”
Another concern of Professor He is the management of development of science and engineering disciplines. He did extensive research on the theory and practice of engineering management during the past 20 years and has published monographs and a number of influential articles on engineering management. Thanks to his push in the engineering management on the level of establishment of faculty, forums, and discipline, the postgraduate program of engineering management goes smoothly for the recruitment, construction and development. The Engineering Management Department of CAE presents him the “Special Contribution Award for Engineering Management”. Now, he is engaged in theory system research of engineering management.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ‘consumer’ is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
In order to exercise your revocation right, you must inform us (Moluna GmbH, Münsterstr. 105, 48268 Greven, Telephone number: 02571/5 69 89 33, Fax number: 02571/5 69 89 30, E-Mail address: abe@moluna.de) of your decision to revoke this contract by means of a clear declaration (e.g. a letter sent via post, fax or email). You can use the enclosed specimen revocation form for this, which however is not mandatory.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts.
The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To Moluna GmbH, Engberdingdamm 27, 48268 Greven, Fax number: 02571/5 69 89 30, Email address: abe@moluna.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 42.38 | £ 42.38 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.