Power System Assets
Book 7 of 10: CIGRE Green BooksSold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
New - Hardcover
Condition: New
Ships within U.S.A.
Quantity: 10 available
Add to basketSold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
Condition: New
Quantity: 10 available
Add to basketNew. Delivery takes 25-30 days. Excellent Customer Service.
Seller Inventory # POD-314675
This CIGRE Green Book describes the state-of-the-art of power Systems asset management dealing with all aspects asset management practice. The major focus of the book is on documenting practical methods that bridge the gap between just satisfying an asset management process and achieving real asset management results in the form of smarter investment decisions.
The book facilitates collaboration and blending of the engineering and technical aspects of asset management and the financial considerations needed to support asset investment decisions using risk-based business case analysis. Detailed case studies are included to illustrate generic and specific or customized methods and to demonstrate the application of such methods from the technology perspectives of several CIGRE study committees.
This practical guide is suitable for working asset managers and decision-makers (both engineering and financial) dealing with all aspects of the practice of asset management.The scope of Cigré Study Committee C1 is to study Economics and system analysis methods for the development of power systems: methods and tools for steady state and dynamic analysis, planning issues and methods in various contexts, asset management strategies, in order to support electricity system planners worldwide to anticipate and successfully manage system changes to address the arising needs, opportunities and uncertainties while respecting multiple constraints.
Dr. Graeme Ancell has worked in the electric utility sector for approximately three decades. Graeme is the owner of Ancell Consulting Limited, a company providing services to the electricity industry in New Zealand and internationally since 2015. He was the convenor of two C1 working groups and is a member of Study Committee C1..
Dr. Gary L. Ford has worked for Ontario Hydro and in the utility sector for more than four decades, Dr. Ford and two colleagues founded PowerNexAssociates Inc., which provides technical consulting services to electric utilities in the area of asset management, procurement, and decision support. Since 1981, his CIGRE experience includes active participation in working groups 23.02, B3.12, C1.1, C1.16, C1.25, C1.38, B3.38, and D1.39, and most recently as Lead Editor for this Green Book
Mr. Earl S. Hill has worked as an independent consultant to the electric utility industry for the past 30 years. He is the co-author of three EPRI publications on RCM and asset management. Mr. Hill has participated in CIGRE WG C1.25, WG C1.34, and currently WG C1.43. Mr. Hill has assisted in the implementation of maintenance improvement efforts for dozens of utilities, on every continent save Antarctica.
Ms. Jody Levine has worked approximately three decades with the former Ontario Hydro and derivative companies. After spending several years as an operational asset manager for station equipment, she currently manages a group of field support consultants for maintenance of transmission stations. She has been active in CIGRE B1.60 and C1.43, and is chair of IEEE 400.3.
Mr. Christopher Reali is employed at the Independent Electricity System Operator (Ontario, Canada) in the role of Engineering Manager, Transmission Planning. Christopher has over a decade of experience in system planning. Christopher is active in NPCC, NERC, and CIGRE working groups. He is the Canadian national representative on SC C1.
Mr. Gérald Sanchis has been in the transmission business for over three decades, holding various positions in management and in technical fields within RTE and EDF group in France and Germany. He was deeply involved in ENTSO-E, for system development, R&D domains, and as support to the president of the association. He is a distinguished member of CIGRE and present convenor of C1.44, addressing the global grid issue. He was the coordinator of the R&D European project e-Highway 2050.
"About this title" may belong to another edition of this title.
Professional Book Seller shipping from Multiple Locations Worldwide for fastest delivery possible!
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Basi6 International, Irving, Texas, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
All orders shipped via FedEx or DHL and delivered to your doorstep within 3-5 days. We do not ship to P.O.Boxes and a proper street address must be provided to avoid any delays.
| Order quantity | 5 to 14 business days | 3 to 6 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.