Power Quality: Infrastructures and Control
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. This book presents novel idea and concepts developed by the researchers/academia and practicing engineers working in the domain of the power sector infrastructures where power electronics infrastructures are used for improving the system reliability and .
Seller Inventory # 732829977
This book presents novel idea and concepts developed by the researchers/academia and practicing engineers working in the domain of the power sector infrastructures where power electronics infrastructures are used for improving the system reliability and efficiency in on-grid and off-grid systems. The infrastructures of distributed power generation based on wind, solar, hydro and many other renewable energy sources have increased manifold since last decade due to availability of efficient power converters and small rating generators. The application of power electronics switching devices has made job much easier to make such system infrastructures more reliable and controllable. The power quality (PQ) issues in infrastructures of distributed power generation system are a major concern for customers. The custom power devices such as voltage source converter are used to mitigate the PQ and other issues such as voltage and frequency control under different loading conditions on the supply system. The operation of these custom power devices or other power converters is dependent on the duty cycles generated by control algorithm. The scope of control algorithm may be varying from model predictive control techniques, machine learning techniques to other artificial intelligence-based techniques. In addition to it, some classical control algorithm and adaptive-type control algorithm may also be used for power converter operation. This book creates awareness among teachers, research students and industry persons about better utilization of infrastructures of distributed power generation system by making it more efficient with the use of power electronics and its control.
Ashutosh K Giri received his Ph.D. from the Department of Electrical Engineering, Sardar Vallabhbhai National Institute of Technology, Surat, India, in 2020. In May 2011, he joined the Department of Electrical Engineering, Government Engineering College, Bharuch, as an assistant professor. He has authored and co-authored more than 30 research papers in reputed journals such as IEEE TRANSACTIONS, IET Journal, Wiley, Tailor Francis, Springer. He has also co-authored one book which is published in Springer Publication, Singapore. He has received the sponsored research grant of Rs. 25 Lacs from the director of technical education, Gujarat state, under STEM Scheme. He is working as a principal investigator in this project. He has coordinated 5 STTP including recently concluded ATAL FDP. He has delivered national- and international-level expert talk at various reputed universities across India. He had received Research Opportunity Week (ROW) scholarship and visited Technical University of Munich, Germany, in March–April 2019. He has also served as a technical program committee member in conferences organized at Scientific Federation of Dallas, USA, and Kenitra, Morocco. He has also chaired as technical session in IEEE sponsored international conference at IIITDM Kancheepuram, Chennai. He had organized special session in world most reputed IEEEECCE2020 Conference at Detroit, Michigan, USA, and in ECCE-ASIA 2021 at Singapore. He is also serving as a potential reviewer in various reputed journals such as IEEE TRANSACTIONS OF POWER ELECTRONICS, IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, IET, Wiley. He was nominated the best researcher of the year 2019 at electrical department, SVNIT, Surat, in 2019. He is also serving as an honorary ad visor (Technical Services) in GMDT Marine and Industrial Engineering Pvt. Ltd, Ahmedabad, India. He is also serving as an honorary advisor (Technical Services) in CUBATICS INDUSTRIES Pvt. Ltd, Surat. India. He is a life memberof Indian Society of Technical Education. Recently, he was included in Advisory Board as a member in Society of Power Engineers, Vadodara Chapter.
Sabha Raj Arya (M’1 2, SM’15) received Bachelor of Engineering degree in Electrical Engineering from Government Engineering College, Jabalpur, in 2002; Master of Technology in Power Electronics from Motilal National Institute of Technology, Allahabad, in 2004; and Ph.D. degree in Electrical Engineering from Indian Institute of Technology (IIT) Delhi, New Delhi, India, in 2014. He is joined as an assistant professor of the Department of Electrical Engineering, Sardar Vallabhbhai National Institute of Technology, Surat. January 2019, he is promoted as an associate professor in same institute. His fields of interest include power electronics, power quality, design of power filters, and distributed power generation. He received Two National Awards, namely INAE Young Engineer Award from Indian National Academy of Engineering, and POSOCO Power System Award from Power Grid Corporation of India in the year of 2014 for his research work. He is also received Amit Garg Memorial Research Award-2014 from IIT Delhi from the high impact publication in a quality journal during the session 2013–2014. At present, he has published more than hundred research papers in international Journals and conferences in the field of electrical power quality. He also serves as an associate editor for the IET Renewable Power Generation.
Josep M. Guerrero (S’0 1-M’04- SM’0 8-FM’1 5) received the B.S. degree in telecommunications engineering, the M.S. degree in electronics engineering, and the Ph.D. degree in power electronics from the Technical University of Catalonia, Barcelona, in 1997, 2000, and 2003, respectively. Since 2011, he has been a full professor with the Department of Energy Technology, Aalborg University, Denmark, where he is responsible for the Microgrid Research Program. From 2014, he is a chair professor in Shandong University; from 2015, he is a distinguished guest professor in Hunan University; and from 2016, he is a visiting professor fellow at Aston University, UK, and a guest professor at the Nanjing University of Posts and Telecommunications. From 2019, he became a Villum investigator by the Villum Fonden, which supports the Center for Research on Microgrids (CROM) at Aalborg University, being, the founder and director of the same center (www.crom.et.aau.dk). His research interests are oriented to different microgrid aspects, including power electronics, distributed energy storage systems, hierarchical and cooperative control, energy management systems, smart metering, and the Internet of things for AC/DC microgrid clusters and islanded minigrids. Specially focused on microgrid technologies applied to offshore wind, maritime microgrids for electrical ships, vessels, ferries and seaports, and space microgrids applied to nanosatellites and spacecrafts. Prof. Guerrero is an associate editor for a number of IEEE TRANSACTIONS. He has published more than 600 journal papers in the fields of microgrids and renewable energy systems, which are cited more than 50,000 times. He received the best paper award of the IEEE Transact ions on Energy Conversion for the period 2014–2015 and the best paper prize of IEEE-PES in 2015. As well, he received the best paper award of the Journal of Power Electronics in 2016. During seven consecutive years, from 2014 to 2020, he was awarded by Clarivate Analytics (a former Thomson Reuters) as Highly Cited Researcher with 50 highly cited papers. In 2015, he was elevated as an IEEE fellow for his contributions on “distributed power systems and microgrids.”
Shailendra Kumar (Senior Member, IEEE) was born in Mahoba, UP, India, in 1988. He received the B.Tech. degree in electrical and electronics engineering from Uttar Pradesh Technical University, Lucknow, India, in 2010, and the M.Tech. degree in power electronicsand electrical machine and drives from the Indian Institute of Technology, New Delhi, India, in 2015. He received the Ph.D. degree in electrical engineering from the Indian Institute of Technology Delhi, New Delhi, India, in May 2019. He is currently working as an assistant professor with the Maulana Azad National Institute of Technology, Bhopal. His research interests include power quality, grid integration, custom power devices, microgrid, and renewable energy. Dr. Kumar is a recipient of prestigious POSOCO Power System Award (in master's as well as in doctoral categories) in 2016 and 2019. He is also a recipient of Prof. Som Nath Mahendra Student Travel Award for the IEEE PEDES 2018 Conference and the IEEE UPCON Best Paper Award in 2016 and 2018, respectively.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ‘consumer’ is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
In order to exercise your revocation right, you must inform us (Moluna GmbH, Münsterstr. 105, 48268 Greven, Telephone number: 02571/5 69 89 33, Fax number: 02571/5 69 89 30, E-Mail address: abe@moluna.de) of your decision to revoke this contract by means of a clear declaration (e.g. a letter sent via post, fax or email). You can use the enclosed specimen revocation form for this, which however is not mandatory.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts.
The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To Moluna GmbH, Engberdingdamm 27, 48268 Greven, Fax number: 02571/5 69 89 30, Email address: abe@moluna.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 42.39 | £ 42.39 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.