Power Cable Technology
Language: English
Published by CRC Pr I Llc, 2023
- Softcover
- New

Seller: Revaluation Books, Exeter, United KingdomRevaluation Books
AbeBooks seller since January 6, 2003
Condition: New
£ 83.43
Quantity: 2 available
Add to basketItem description from seller
445 pages. 9.19x6.13x1.30 inches. In Stock.
Seller Inventory # x-1138322652
- Title
- Power Cable Technology
- Author
- Ganguli, Sushil Kumar/ Kohli, Vivek
- Publisher
- CRC Pr I Llc
- Publication year
- 2023
- Condition
- Brand New
- Binding
- Paperback
- Language
- English
- ISBN 10
- 1138322652
- ISBN 13
- 9781138322653
- Item weight
- 0.68 kilograms
Power Cable Technology provides a precise understanding of the design, manufacture, installation, and testing of a range of electric power cables―from low-voltage, 1,000/1,100V cables to extra-high-voltage, 400kV cables―with reference to future trends in the industry.
The authors’ mantra is: know your cable. Thus, the book begins with a comprehensive overview of power cable design and manufacturing through the ages, and then:
- Describes the characteristics of the materials currently used in the production of various power cables
- Explains how to calculate the die orifice for drawing wires, how tolerance in manufacturing affects material weight and consumption, and how and why lubricants are used
- Addresses the formation, stranding, and insulation of the electrical conductors, as well as the sheathing, armouring, and protective covering of the power cables
- Delivers an in-depth discussion of quality systems, quality control, and performance testing
- Covers the many nuances of cable installation, including laying, jointing, and terminating
Throughout, the authors emphasise consonance between design theory and practical application to ensure production of a quality power cable at a reasonable cost. They also underscore the importance of careful handling, making Power Cable Technology a must read for power cable engineers and technicians alike.
"Synopsis" may belong to another edition of this title.
About the Author
Sushil Kumar Ganguli has more than 50 years of experience in the electrical cable industry. After graduating in physics from St. Xavier’s College, he was trained as a cable technologist in the reputable German cable industry, then appointed technical and production manager at Universal Cables Ltd., where he researched, designed, and developed new, better performing, more competitive types of cables for railways and defense. He subsequently worked in various capacities with Gloster Industries; joined Cable Corporation of India (in collaboration with Siemens Germany) as head of R&D and took charge of the Technical Department as technical manager; helped develop cable manufacturing machinery at Vidhya Kabelmats India Pvt. Ltd.; and served as technical advisor to Paramount Communication Ltd., AEI Cables Ltd. UK, Hindusthan Vidyut Products Ltd., and Uniflex Cables. Widely published, he has lectured at the Institute of Electrical Engineers, Electrical Contractors Association, National Test House, Calcutta Electric Supply Corporation Ltd., and Electrical Cable Development Association.
Vivek Kohli has 37+ years of experience in running businesses with P&L responsibility, and has led core functions, projects, business development, administration, operations, and technology. After earning his BE in electrical engineering from the Birla Institute of Technology, he began his career as chief operations manager with RPG Cables Ltd. He subsequently worked with Hindusthan Vidyut Products Ltd. as technical vice president, Polycab, Ravin Cables Ltd., and Sterlite Technologies Ltd. as CTO and business head. He is currently CEO for power business and group HR, and IT lead in Hindusthan Group. Prior to CEO, he was president of strategic new business and projects at Hindusthan Group. Widely known as an EHV cable and HTLS conductor expert and business head for several startups in the wire and cable industry, he was instrumental in making the first XLPE cable and HTLS conductor in India. He is an Indian Institute of Plant Engineers corporate member, as well as a member of the Society of Power Engineers, Cigré, and Belgian-Luxembourg Business Association.
"About the title" may belong to another edition of this title.
Revaluation Books
Exeter, United Kingdom
AbeBooks seller since January 6, 2003
Shipping rates from United Kingdom to U.S.A.
| Item | 7 to 14 business days | 2 to 3 business days |
|---|---|---|
| First item | £ 12.50 | £ 25.00 |
Payment methods
Seller's business information
Edward Bowditch Ltd
Exstowe, Exton
Exeter, United Kingdom EX3 0PP
Terms of sale
Legal entity name: Edward Bowditch Ltd
Legal entity form: Limited company
Business correspondence address: Exstowe, Exton, Exeter, EX3 0PP
Company registration number: 04916632
VAT registration: GB834241546
Authorised representative: Mr. E. Bowditch
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Revaluation Books, Hounslow, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually dispatched within two working days.