Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs (Paperback)
Language: English
Published by IWA Publishing, London, 2004
- Softcover
- New

Seller: Grand Eagle Retail, Bensenville, IL, U.S.A.Grand Eagle Retail
AbeBooks seller since October 12, 2005
Condition: New
£ 158.01
Quantity: 1 available
Add to basketItem description from seller
Paperback. Over the past 20 years, the use of Best Management Practices (BMPs) in the United States has been instrumental in reducing both the detrimental impacts to receiving water quality and the exacerbated flooding caused by urbanization and storm water drainage. More recently, Sustainable Urban Drainage Systems (SUDS) have started to be used in the United Kingdom. Both SUDS and BMPs attempt to mimic the drainage patterns of the natural watershed, and can also provide a degree of treatment needed to improve the quality of the water discharged to an acceptable level. The costs of conventional stormwater collection systems are determined primarily in terms of initial capital expenditure. Long-term maintenance costs are absorbed by stormwater authorities that are responsible for maintaining their infrastructure as part of their 'asset base'. Currently, only a few of these responsibilities exist for BMPs and SUDS, which generally incorporate surface components and are often dependent on landscaping rather than on traditional construction techniques, but may require significant regular maintenance.Any potential adopting organization will require guidance on the maintenance regimes of different types of systems and how such regimes translate into long-term adoption costs. The project is being conducted in two phases. Phase 1, which is the subject of this report, includes a literature review and a survey of stormwater authorities and organizations in the U.S. and U.K. to identify the most commonly used BMPs and SUDS and to determine the availability of data on their cost and performance. Phase 1 also involves establishment of protocols for whole-life costs and performance data for BMPs and SUDS. Protocols for whole-life costs will be published separately. An additional outcome of Phase 1 will be the selection of a limited number of BMPs and SUDS authorities or sites for qualitative or quantitative monitoring and further assessment during Phase 2.As part of Phase 2, the operation of selected BMPs and SUDS will be monitored over a one-year period in terms of pollutant removal and hydrologic/hydraulic efficiency, and applicability of their design criteria and maintenance regime. The protocols developed in Phase 1 will be used to assess BMPs/SUDS performance and whole-life costs. The project is being conducted in two phases. Phase 1, which is the subject of this report, includes a literature review and a survey of stormwater authorities and organizations in the U.S. and U.K. to identify the most commonly used BMPs and SUDS and to determine the availability of data on their cost and performance. Shipping may be from multiple locations in the US or from the UK, depending on stock availability.…
Seller Inventory # 9781843397168
- Title
- Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs (Paperback)
- Author
- L.K. Lampe
- Publisher
- IWA Publishing, London
- Publication year
- 2004
- Condition
- new
- Binding
- Paperback
- Language
- English
- ISBN 10
- 1843397161
- ISBN 13
- 9781843397168
"Synopsis" may belong to another edition of this title.
Grand Eagle Retail
Bensenville, IL, U.S.A.
AbeBooks seller since October 12, 2005
Shipping rates within U.S.A.
| Item | 6 to 14 business days | 6 to 16 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Payment methods
Seller's business information
APOLLO ONLINE CORP.
605 Geddes Street
Wilmington, DE U.S.A. 19805
Terms of sale
We guarantee the condition of every book as it¿s described on the Abebooks web sites. If you¿ve changed
your mind about a book that you¿ve ordered, please use the Ask bookseller a question link to contact us
and we¿ll respond within 2 business days.
Books ship from California and Michigan.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Grand Eagle Retail, Bensenville, Illinois, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually ship within 2 business days. All books within the US ship free of charge. Delivery is 4-14 business days anywhere in the United States.
Books ship from California and Michigan.
If your book order is heavy or oversized, we may contact you to let you know extra shipping is required.