Position Paper Dam Safety and Earthquakes
Language: English
Published by Taylor & Francis Ltd, 2021
- Softcover
- New

Seller: THE SAINT BOOKSTORE, Southport, United KingdomTHE SAINT BOOKSTORE
AbeBooks seller since June 14, 2006
Condition: New
£ 39.98
Quantity: 1 available
Add to basketItem description from seller
New copy - Usually dispatched within 4 working days.
Seller Inventory # B9781138490109
- Title
- Position Paper Dam Safety and Earthquakes
- Author
- CIGB ICOLD
- Publisher
- Taylor & Francis Ltd
- Publication year
- 2021
- Condition
- New
- Binding
- Paperback / softback
- Language
- English
- ISBN 10
- 1138490105
- ISBN 13
- 9781138490109
- Item weight
- 501 grams
- Series
- Book 20 of 32: ICOLD Bulletins Series
Earthquakes have always been a significant aspect of the design and safety of dams. This position paper deals with the seismic safety of large dams, based on experiences with large earthquakes in Japan (Tohoku earthquake, 2011, Richter magnitude 9.0), in China (Wenchuan earthquake, 2008, Richter magnitude 8.0) and in Chile (Maule earthquake, 2010, Richter magnitude 8.8). It presents ways to prevent key aspects of large dam failure under severe seismic conditions with a focus on design instead of on earthquake prediction. This is done by considering the prevention of uncontrolled rapid release of water of a storage dam under full reservoir conditions in relation to expected seismic conditions.
This position paper is composed by the Committee on Seismic Aspects of Dam Design of The International Committee of Large Dams.
Les tremblements de terre ont toujours été un aspect important de la conception et de la sécurité des barrages. Ce document de synthèse traite de la sécurité sismique des grands barrages, en se fondant sur l’expérience acquise lors de grands séismes au Japon (séisme de Tohoku, 2011, magnitude 9,0 sur l’échelle de Richter), en Chine (séisme de Wenchuan, 2008, magnitude 8,0 sur l’échelle de Richter) et au Chili (séisme de Maule, 2010, magnitude 8,8 sur l’échelle de Richter). Il présente des moyens de prévenir les aspects clés de la défaillance des grands barrages dans des conditions sismiques sévères en mettant l’accent sur la conception plutôt que sur la prévision des séismes. Pour ce faire, on examine la prévention d’une libération rapide et incontrôlée de l’eau d’un barrage de stockage dans des conditions de réservoir plein par rapport aux conditions sismiques prévues.
Cet argumentaire est composé par le Comité sur les Aspects Sismiques des Projets de Barrages de la Commission Internationale des Grands Barrages.
"Synopsis" may belong to another edition of this title.
About the Author
The Commission Internationale des Grands Barrages (CIGB) / International Commission on Large Dams (ICOLD) is a non-governmental International Organization which provides a forum for the exchange of knowledge and experience in dam engineering.
The organization leads the profession in ensuring that dams are built safely, efficiently, economically, and without detrimental effects on the environment. Its original aim was to encourage advances in the planning, design, construction, operation, and maintenance of large dams and their associated civil works, by collecting and disseminating relevant information and by studying related technical questions.
Since the late 1960s, focus was put on subjects of current concern such as dam safety, monitoring of performance, reanalysis of older dams and spillways, effects of ageing and environmental impact. More recently, new subjects include cost studies at the planning and construction stages, harnessing international rivers, information for the public at large, and financing.
"About the title" may belong to another edition of this title.
THE SAINT BOOKSTORE
Southport, United Kingdom
AbeBooks seller since June 14, 2006
Shipping rates from United Kingdom to U.S.A.
| Item | 7 to 28 business days | 7 to 28 business days |
|---|---|---|
| First item | £ 15.76 | £ 17.76 |
Payment methods
Store description
The Saint Bookstore has a range of over 1 million titles available.
Specialty
GeneralSeller's business information
SB ONLINE LTD
50 Devonshire Road
Southport, United Kingdom PR9 7BZ
Terms of sale
Please order through the Abebooks checkout. We only take orders through Abebooks - We don't take direct orders by email or phone.
Refunds or Returns: A full refund of the purchase price will be given if returned within 30 days in undamaged condition.
As a seller on abebooks we adhere to the terms explained at http://www.abebooks.co.uk/docs/HelpCentral/buyerIndex.shtml - if you require further assistance please email us at orders@thesaintbookstore.co.uk
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to THE SAINT BOOKSTORE, Southport, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Most orders usually ship within 1-3 business days, but some can take up to 7 days.