Polymeric Membrane Formation by Phase Inversion
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketAnalyzes membrane formation by phase inversion and modelingIncludes state-of-the-art membrane formation methods and related characterization techniquesDiscusses solvent toxicity and sustainability issues of membrane production.
Seller Inventory # 897746716
Polymeric Membrane Formation by Phase Inversion analyzes the four main phase inversion techniques. Effective parameters in each technique are covered, along with the methodologies needed to prepare advanced membranes for specific separations in both liquid and gas phases. Roll-to-roll casting, spinning hollow fiber, and electrospinning nanofibers are presented, along with an analysis of the impact of solvent toxicity, membrane production, and the source of raw materials on the environment. The book describes a roadmap for designing different morphological characteristics for preparing specific membranes for special applications, along with the merits and disadvantages of each method. This book provides an easy, comprehensive reference for academic and industry professionals working in membrane engineering.
Dr. Naser Tavajohi is an Associate Professor in the Chemistry Department at Umeå University. Naser earned his master’s degree in chemical engineering with a specific focus on separation processes. During his master's program, he studied the fabrication, modeling, and optimization of flat sheet membranes using non-solvent-induced phase separation. In 2015, Naser received his Ph.D. from Hanyang University and the University of Calabria. His Ph.D. thesis focused on the preparation of hollow fiber membranes through thermally induced phase separation. He stood out as one of the pioneering researchers emphasizing the significance of sustainability in membrane production, as evidenced by several papers published during his Ph.D. years. After two postdoctoral experiences, Naser became an Assistant Professor in the Chemistry Department at Umeå University in 2019. In 2021, he was selected as a young talented researcher at the Faculty of Science and Technology at Umeå University by the Royal Swedish Academy Skytteanska Samfundet. In 2022, he became a docent, and in 2023, he was promoted to Associate Professor. Throughout his academic journey, he introduced an array of alternative solvents for the preparation of polymeric membranes via phase inversion. Dr. Tavajohi and his team are dedicated to developing the next generation of polymeric membranes for use in liquid separation, gas separation, and the energy sector. For more insights into his research endeavors, visit his laboratory website: www.nordicmembrane.com.
Dr. Mohamed Khayet is director of the University Complutense of Madrid (UCM) Research Group “Membranes and Renewable Energies (MER)” and Professor (Applied Physics Area) at the Faculty of Physical Sciences (UCM) (Department of Structure of Matter, Thermal Physics and Electronics). He got his Ph.D. (1997) in Physical Sciences and he realized various research stays in various international institutions (Industrial Membrane Research Institute in Ottawa, Canada; Institute of Nuclear Chemistry and Technology in Warsaw, Poland; Centre for Clean Water Technologies at the University of Nottingham in UK; Singapore Membrane Technology Centre and Nanyang Technological University in Singapore, Yale University in New Haven, USA; University of California Berkeley in USA, etc.). Among other grants, he got the Fulbright Grant (2019). He is an expert in the field of membrane science, nanotechnology and renewable energies. He has coordinated various national and international projects (over 20) funded by different institutions (European Union, Middle East Desalination Research Centre, Spanish Ministries; Companies such as Abengoa, etc.) on membranes and modules engineering for different separation processes. He published over 200 papers in international journals, filed 6 International Patents, published 5 books and various book chapters in the field of membrane science and related technology. Among other recognitions, he received the Prince Sultan Bin Abdulaziz International Prize for Water (PSIPW) in 2012. He edited various special issues in international journals such as Desalination, Polymers and Membranes. He acted as Editor of the international Journal “Desalination” (2018-2022) and served as associated editor of different journals. Currently, he is member of the Editorial Board of various journals related with water treatment, renewable energy, nanotechnology, membrane science and separation processes.
- Google Scholar: https://scholar.google.com/citations?user=H_lnjFkAAAAJ&hl=en
- Scopus: https://www.scopus.com/authid/detail.uri?authorId=56517090400
- ORCID ID: https://orcid.org/0000-0002-5117-2975
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 42.06 | £ 42.06 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.