Performance Testing Advanced Guide - LoadRunner9 .1 Software Testing works real test practice books series(Chinese Edition)
ISBN 10: 7121098210 (ISBN 13: 9787121098215)
- Softcover
- New

Condition: New
£ 59.21
- Bank Wire Transfer
- Paypal
Quantity: 10 available
Add to basketItem description from seller
Ship out in 2 business day, And Fast shipping, Free Tracking number will be provided after the shipment.Pages Number: 431 Publisher: Electronic Industry Pub. Date :2009-12-01 first edition this book as the only one based on HP LoadRunner 9.10 tool guide books. from the principles of performance testing tool used to project implementation to comprehensive introduction to all aspects of the performance test. the basic content of the main line are described below. The first step (understanding of the theory): Preparation may quicken the work. lay the foundation; the second step (master instrument): in-depth description of three major LoadRunner tool (Virtual User Generator. Controller. Analysis). respectively. is how to achieve the simulation of user behavior . performance monitoring. load generation and post-data analysis; the third step (project implementation): theory with practice. describes the process of project implementation performance testing and performance testing of departmental organization and management; the fourth step (Advanced upgrade) : some current popular or more special protocols and development techniques for the introduction of real cases. This book combines a lot of work in the actual case. illustrated. not only for newcomers eager to learn about performance testing. also suitable for performance testing have some knowledge and experience. the senior test engineer. Meanwhile. the book can also carry out performance testing program as a college reference materials. so that students can in the nature and value of performance tests have a certain understanding. Contents: Chapter 1. performance testing performance test engineers based 1.1 Challenges 1.1.1 The performance standards and test engineers. test engineers. performance evaluation indicators 1.1.2 performance test 1.2 Challenges 1.2.1 Performance 1.2.2 Performance-based performance indicators 1.2.3 analysis and performance tuning 1.2.4 stand-alone software and network infrastructure software performance testing of process performance 1.2.5 1.2.6 1.2.7 Points to note the performance test required performance test Job Summary Chapter 2 Introduction to 2.2LoadRunner tool LoadRunner components Overview 2.1LoadRunner 2.3 Principle 2.4 performance testing tools for automated testing and performance testing tools for the difference between 2.5 protocol analysis 2.5.1HTTP details 2.5.2HTTP message structure 2.5.3HTTP request 2.5.4HTTP response 2.5.5HTTP capture 2.5.6HTTP playback 2.6 Installation 2.6.1 Installation under Windows installation LoadRunner2.6.2 Load Generator2.6.3 add 2.6.4LoadRunner License2.6.5 test environment installation 2.7LoadRunner preview performance test operating procedures Summary Chapter 3 describes the user behavior modeling 3.1VuGen 3.1.1Tree graphical interface mode 3.1 .2 script mode 3.1.3Output Window3.2 recording process to record users' behavior 3.2.1 3.2.3 3.2.2 protocol of choice to start recording the recording option 3.2.4 3.2.6 3.2.5 Insert the end of the command to record 3.2.7 replay verification 3.2 .8 script recording and playback FAQ 3.3 How to develop 3.3.1Action Notes 3.3.3 Introduction 3.3.2 scripting language. how to use the template rule 3.3.4 3.3.5 3.3.6 import and export scripts 3.4 Common script debugging option (General Options) Label 3.5 Label 3.4.2Replay 3.4.1Parameterization run set (Run-Time Setting) 3.5.1Run Logic3.5.2Pacing3.5.3Log3.5.4Think Time3.5.5Additional attributes3.5.6Miscellaneous3.5.7Speed ??simulation3.5.8owser Emulation3.5.9Preferences3. 6 3.6.1 Parameters of the parameterized operating 3.6.2Parameter List interface describes 3.6.3VuGen parameters 3.6.4Controller parameters 3.6.5 peer values ??(Same line as) 3.6.6 Parameter simulation (Simulate Parameter) 3.6. 3.6.8 Data Wizard 7 parameter type (Data Wizard) 3.6.9 3.7 associated parameters and variables associated with principles 3.7.2 3.7.1 3.7.3 automatically associated with manual side of the recording side of the associated correlation.…
Seller Inventory # LI8337
Bibliographic details
- Title
- Performance Testing Advanced Guide - LoadRunner9 .1 Software Testing works real test practice books series(Chinese Edition)
- Author
- ////
- Condition
- New
- Binding
- paperback
Shipping rates from China to U.S.A.
| Item | 16 to 30 business days | 8 to 16 business days |
|---|---|---|
| First item | £ 13.43 | £ 22.38 |
Store description
Thank you for visiting My bookstore! We are an online bookstore, and Is the China's largest online book sales. Generally our books are from China, with reasonable price and decent printing quality. We are always trying our best to satisfy customer's needs!
Specialty
Chemistry, Mathematics, Computer, Physics, Environment, Social SciencesSeller's business information
NAN JING SHI JIANG NING QU NING YUAN DIAN ZI SHANG WU ZHONG XIN
Room 264, Oujiang Shopping Center, No. 1 Dongxin South Road, Dongshan Street, Jiangning District, NanJing
Nanjing, JS China 211100
Terms of sale
We guarantee the condition of every book as it's described on the Abebooks web sites. If you're dissatisfied with your purchase (Incorrect Book/Not as Described/Damaged) or if the order hasn't arrived, you're eligible for a refund within 30 days of the estimated delivery date. If you've changed your mind about a book that you've ordered, please use the Ask bookseller a question link to contact us and we'll respond within 2 business days. Please Note:We don't sell any international Edition to you. Don't send any question about international Edition to us.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to liu xing, Nanjing, JS, China, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Most orders are shipped within 24 hours. We will delivery these items to you by SAL, EUB, EMS, FEDEX etc.