Path Routing in Mesh Optical Networks
E Bouillet
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketTransport networks evolved from DCS (Digital Cross-connect Systems)-based mesh architectures, to SONET/SDH (Synchronous Optical Networking/Synchronous Digital Hierarchy) ring architectures in the 1990 s. In the past few years, technological advancements in .
Seller Inventory # 556553255
Optical transport networks today not only provide trunking capacity to higher-layer networks, such as inter-router connectivity in an IP-centric infrastructure, but also support efficient routing and fast failure recovery of high-bandwidth services. This is possible due to the emergence of optical network elements that have the intelligence required to efficiently control the network. Optical mesh networks will enable a variety of dynamic services such as bandwidth-on-demand, Just-In-Time bandwidth, bandwidth scheduling, bandwidth brokering, and optical virtual private networks that open up new opportunities for service providers and their customers alike.
Path Routing in Mesh Optical Networks combines both theoretical as well as practical aspects of routing and dimensioning for mesh optical networks. All authors have worked as technical leaders for the equipment vendor Tellium who implemented such capabilities in its product, and whose product was deployed in service provider networks.
Path Routing in Mesh Optical Networks
As most of the core backbone networks evolve to mesh topologies utilizing intelligent network elements for provisioning and recovery of services, Path Routing in Mesh Optical Networks will be an invaluable tool for both researchers and engineers in the industry who are responsible for designing, developing, deploying and maintaining mesh optical networks. It will also be a useful reference book for graduate students and university professors who are interested in optical networks or telecommunications networking.
With a foreword by Professor Wayne D. Grover, author of the book Mesh-Based Survivable Networks.
Dr. Jean-Francois Labourdette is manager of system engineering at Tellium. He is responsible for all network element and network management system engineering activities. Before that he was manager of network routing and design, where he was responsible for Tellium's routing architecture and algorithms, network dimensioning, and design studies.
Dr. Eric Bouillet is principal engineer at Tellium. He works on the design of optical networks and optimization of light-path provisioning and fault restoration algorithms. Before joining Tellium, Eric was a member of the technical staff in the Mathematical Sciences Research Center in Bell Labs/Lucent Technologies, working in the areas of routing in ATM and optical networks.
Georgios Ellinas is an Associate Professor of Electrical Engineering at City College of the City University of New York. Before joining City College, George was a senior network architect at Tellium Inc. In this role, he worked on light-path provisioning and fault restoration algorithms in optical mesh networks.
Ramu Ramamurthy is lead engineer in the Optical Switch Division at Ciena (Ciena's Optical Switch has been deployed in the worlds biggest optical mesh networks). At Ciena Ramu works on the design and development of Routing and Restoration algorithms and protocols for optical mesh networks. Before that he worked for Tellium, where Ramu was part of a team that implemented Tellium's routing and restoration algorithms for optical mesh networks. His work at Tellium has resulted in several patent applications, and he coauthored several widely referenced publications in leading journals and conferences.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 41.76 | £ 41.76 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.