Outcome-Based Performance Management in the Public Sector
Borgonovi, Elio|Anessi-Pessina, Eugenio|Bianchi, Carmine
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Explains how public organizations have evolved their performance management systems toward outcome measures that may allow one to better deal with wicked problemsShowcases the use of an outcome-oriented view of performance to frame and assess the desira.
Seller Inventory # 448759635
Outcome-Based Performance Management in the Public Sector is divided into five parts. Part 1 aims at shedding light on problems and issues implied in the design and implementation of “outcome-based” performance management systems in the public sector.
Then Part 2 illustrates the experiences, problems, and evolving trends in three different countries (Scotland, USA, and Italy) towards the adoption of outcome-based performance management systems in the public sector. Such analyses are conducted at both the national and local government levels. The third part ofthe book frames how outcome-based performance management can enhance public governance and inter-institutional coordination. Part 4 deals with the illustration of challenges and results from different public sector domains. Finally the book concludes in Part 5 as it examines innovative methods and tools that may support decision makers in dealing with the challenges of outcome-based performance management in the public sector.
Though the book is specifically focused on a research target, it will also be useful to practitioners and master students in public administration .
Elio Borgonovi is Professor of Public Management, Director of the Centre for Research on Health Care Management, Director of the Institute of Public Administration and Health Care Management at Bocconi University in Milan, Italy. Elio Borgonovi has been Dean of Bocconi School of Management (SDA) (1997-2002), member of the Board (1995-2004) and Vice President (2002-2004) of the Italian Academy of Management (AIDEA) and President of ASFOR, the Italian Association of Management Schools (1993-1997). Professor Borgonovi is a member of several regional and ministerial committees and commissions for healthcare planning and the introduction of management systems in various public bodies. He has also been a member of the scientific committees and served on the boards of directors of numerous different national and European organizations, such as EQUIS and EFMD. He has written a number of books, papers and essays on public administration and management, healthcare systems, management issues and tools for nonprofit organizations, public utility companies and public interest institutions in general. He is the editor in chief of Azienda Pubblica and Mecosan Journals and has been a reviewer for the European Journal of Heath Economics since 2003.
Eugenio Anessi-Pessina is Professor of Public and Health-Care Management at Catholic University of the Sacred Heart in Milan, Italy. In addition, he is a senior fellow at the Wharton School of the University of Pennsylvania (Department of Health Care Systems) and the editor of Azienda Pubblica (a leading Italian-language public management journal). His research interests include public sector budgeting and accounting, health care management, and management control in government and health care organizations.
Carmine Bianchi is Professor of Business & Public Management at the University of Palermo (Italy), where is the scientific coordinator of CED4 System Dynamics Group. He is the director ofthe Doctoral level program in “Model Based Public Planning, Policy Design, & Management”, and of the Master level program in Public Management.
Professor Bianchi is member of the Steering Committee of the “European Master in System Dynamics”, a joint degree among the Universities of Palermo, Nijmegen (the Netherlands), Bergen (Norway), and Lisbon (Portugal). This is an “Erasmus Mundus” funded program, sponsored by the European Commission.
He has published in numerous academic and professional journals. He also serves on the Scientific Committee of various academic publications.
Professor Bianchi has an extensive international research and consulting experience with public and private sector organizations. Such activities consist in the design of policies and the outline of programs linking strategy and implementation. Consulting and education projects that Prof. Bianchi has undertaken cover: strategic planning and control, performance management and reporting, aswell as System Dynamics modeling for performance improvement and crisis prevention (Dynamic Performance Management).
In the last decade, Professor Bianchi has been strengthening an international network related to “Dynamic Performance Management”. He has been collaborating with Universities throughout the world, ranging from Europe (Bergen, Norway; Nijmegen, The Netherlands; St. Gallen, Switzerland; KTH, Stockholm, Sweden), to Australasia (Top Education Institute, Sydney; Multimedia University and National University of Malaysia, Kuala Lumpur; NAPA - Hanoi; Rangsit University, Bangkok; Universitas Indonesia, Jakarta; National Academy of Public Administration – NAPA, Hanoi), and America (University of Campinas - UNICAMP, Brazil).
In the USA, Professor Bianchi has collaborated extensively with the School of Government of University of North Carolina at Chapel Hill. More recently he has undertaken projects with the Center for Human Resource Management State, Stony Brook University, with the School of Public Affairs at the Baruch College, New York, and with the College of Public Affairs at the University of Baltimore.
He has been also visiting professor at the Rockefeller College of Public Affairs & Policy, University at Albany (USA), at Top Education Institute, Sydney (Australia), and at Unicamp, Faculty of Technology, Limeira (Brazil).
He has also run professional workshops in: Africa (Tripoli, Tunis), Australasia (Bangkok, Brisbane, Hanoi, Jakarta, Kuala Lumpur, Penang, Singapore), Europe (Istanbul, London, Milan, San Gallen, Stockholm), and Latin America (Buenos Aires – Argentina, Brasilia, Sao Paolo – Brazil, Colima – Mexico).
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ‘consumer’ is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
In order to exercise your revocation right, you must inform us (Moluna GmbH, Münsterstr. 105, 48268 Greven, Telephone number: 02571/5 69 89 33, Fax number: 02571/5 69 89 30, E-Mail address: abe@moluna.de) of your decision to revoke this contract by means of a clear declaration (e.g. a letter sent via post, fax or email). You can use the enclosed specimen revocation form for this, which however is not mandatory.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts.
The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To Moluna GmbH, Engberdingdamm 27, 48268 Greven, Fax number: 02571/5 69 89 30, Email address: abe@moluna.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 42.29 | £ 42.29 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.